Search Forum
Blog Entry# 5869037
Posted: Nov 01 2023 (23:05)
33 Responses
Last Response: Nov 17 2023 (10:43)
33 Responses
Last Response: Nov 17 2023 (10:43)
Indian Railways Survey's For upcoming Vande Bharat Routes In India and all upcoming Vande Bharat Will Be 8 Coaches min Vande Bharat.
List Of Upcoming 25 New Vande Bharat Express Trains
1....
more...
List Of Upcoming 25 New Vande Bharat Express Trains
1....
more...
28 Posts
as per the current extension schedule of JAM VB , it is taking 2 hours 50 mins till Udhna... i think, considering these VBs will not be given highest priority on this route like GNC VB... ADI-ST can still be covered in 2 hours 30 mins hours .. GNC VB takes 2 hours 10 mins though !
so if JU-SBIB can cover JU-ADI in 5 hours 30 mins.. the whole stretch can be covered with in 8 hours !
so if JU-SBIB can cover JU-ADI in 5 hours 30 mins.. the whole stretch can be covered with in 8 hours !
Problem lies with terminal too and the odd timings chosen by RB.
JU SBIB vb should have been started from ADI at 8:30 hrs in morning and 14:30 hrs from JU. So that people can catch connecting trains at ADI like navjeevan and many more. This timing is not suitable at all.
JU SBIB vb should have been started from ADI at 8:30 hrs in morning and 14:30 hrs from JU. So that people can catch connecting trains at ADI like navjeevan and many more. This timing is not suitable at all.
Well it's not WR train...so it won't be extended that easily i guess unlike JAM ADI vb.
Yeah , i know ... may be board will look in to the matter soon !
As this has started running with 130mps on MJ PNU route soon it can get a speedup and possibilities are there of extension