Additinal 2 line work WIP between BGKT - JU. Soon it will 4 lines between two stations
These are not the main lines. These are the stabling lines to park the rakes. And RB has approved 3 stabling lines on BGKT.
2 lines are being constructed on this side and one another line on the other side of double track. So total there will be 5 lines between JU and BGKT
2 lines are being constructed on this side and one another line on the other side of double track. So total there will be 5 lines between JU and BGKT