Search Forum
Blog Entry# 5966469
Posted: Feb 10 (23:07)
22 Responses
Last Response: Feb 26 (10:27)
22 Responses
Last Response: Feb 26 (10:27)
18 Posts
Kuch v ho...kitna v aacha zone bana lo....last me approval to railway board ki chahiye
Well said.. This MP never done anywork in any field.. Bokaro airport still not completed as work is going since more than 6 years. For medical College in Bokaro listening since I was in class 12th now in next few years my son will appear for class 12.. No any progress in any of the area.. BJP higher authority should replace this man for MP face..
Bokaro Airport Failure
Medical College Failure
Stadium Failure
Electricity and Water Supply Failure
Rail Connectivity Failure
Restoring...
more...
Medical College Failure
Stadium Failure
Electricity and Water Supply Failure
Rail Connectivity Failure
Restoring...
more...
So what ? Do this folk think that creating a new zone based in RNC would mean that the railway infrastructure will come under their control now ?
Final approval has to still come from the Railway Board.
And if they were competent enough they should have been able to give the required trains in their constituency anyways, without the need of an additional zone.
Just...
more...
Final approval has to still come from the Railway Board.
And if they were competent enough they should have been able to give the required trains in their constituency anyways, without the need of an additional zone.
Just...
more...