There Should Be Commissioning of New 3rd Lines on the Following Routesin the Next Rail Budget
1. Mumbai-Vadodara
2. Palwal-Kota
3. Palwal-Agra Cantt
4. Ghaziabad-Kanpur
5....
more...
1. Mumbai-Vadodara
2. Palwal-Kota
3. Palwal-Agra Cantt
4. Ghaziabad-Kanpur
5....
more...
HWH-CHENNAI-TVC
MAS-NDLS routes needs immediate 3 rd line to takle the pressure.
MAS-NDLS routes needs immediate 3 rd line to takle the pressure.
already project for making Separate Track for Goods Trains in this route is pending with IR correct?
Doubling of GHD KTE is required for asmooth operation of Goods Trains and increasing pressure of passenger trains