Search Forum
Blog Entry# 6192032
Posted: Sep 16 (18:32)
12 Responses
Last Response: Today (19:49)
12 Responses
Last Response: Today (19:49)
GTL division proposed New CDO at Pakala jn CDO consists of 8 Pit lines, 8 stabling lines One IOH shed
7 Posts
Main land availaiblity ...Pakala has ample land while CTO lacks to have this level of infrastructure.
Anukunna but chittor ayunte Inka connectivity vachedi and already venkatadri exp kuda velthundi akkadi varaku ani and kanipakam kuda chittor daggara kada
Anukunna but chittor ayunte Inka connectivity vachedi and already venkatadri exp kuda velthundi and kanipakam kuda chittor daggare kada
Yeah but if they want to build such big with 8 pitlanes, 8 stabling lines, they needs huge land parcels and Chittoor unfortunately locked both the sides to have such massive CDO. It also helps to de-congest Tirupati.
Part of this, if they can double the Tirupati-Pakala section of the TPTY-KPD section, it would be even better :)
Part of this, if they can double the Tirupati-Pakala section of the TPTY-KPD section, it would be even better :)