Search Forum
Blog Entry# 626442
Posted: Dec 30 2012 (11:52)
No Responses Yet
No Responses Yet
In this station,platform no.1 is being used for the arr/dep of the trains running on the down track(trains running on BBS-DNKL-SBP route)and platform no.2 is used for the trains running in opposite direction.BUT it's not shown on the time table of the trains halting at DNKL that whether they arrive on platform no.1 or platform no.2.Equal procedure is also followed at Angul railway.station.This information must be updated on the timetables of the trains running through these two stations.