Search Forum
Blog Entry# 725745
Posted: Apr 17 2013 (18:34)
28 Responses
Last Response: Apr 24 2013 (09:10)
28 Responses
Last Response: Apr 24 2013 (09:10)
Today i decided to visit Churchgate as there was the exibion of railways because IR finished 160 yrs from beginning
Pics:- Gauge conversion work going on war footing. This will open an altenative route for Indore (Ratlam-Indore-Mhow 159 km Gauge conversion) Eleveted rail corridor.Western Railway dream project to link Churchgate and Virar with elevated rail corridor. 20.6 km Underground 29.4 km elevated 10.2 km ground level. Gen-next stn building to take care of everything needs (Oshiwara)
Pics:- Gauge conversion work going on war footing. This will open an altenative route for Indore (Ratlam-Indore-Mhow 159 km Gauge conversion) Eleveted rail corridor.Western Railway dream project to link Churchgate and Virar with elevated rail corridor. 20.6 km Underground 29.4 km elevated 10.2 km ground level. Gen-next stn building to take care of everything needs (Oshiwara)
25 Posts
in the actions........u have an option set station board pic.............however it can be seen only on those posts which contain an image...........