Search Forum
Blog Entry# 816812
Posted: Jul 29 2013 (12:41)
30 Responses
Last Response: Aug 31 2013 (19:18)
30 Responses
Last Response: Aug 31 2013 (19:18)
Railways should start SGNR-HMH track ASAP....and try to increase the facilities at both the stations...
see the link...click here
see the link...click here
25 Posts
obviously ,, people are not fool fo long route .... people prefer direct bus
As compression to Sgnr-JP via Bkn , run this Train Via BTI- RE Route
the local leadership have been demanding SGNR-JP train via BTI-RE route but railways denied the proposal on basis of heavy traffic load on the RE-ALW-BKI route...however the demand will be met once HMH-KOT train is extended to SGNR. Although the route is circuitous but still it is very useful for the ppl of the region