basu ji not asking /proposing for 8 pf's can handle that's it
pf 4 and pf 5 propoal are all ready under way and concrete layer also been over besides pf 3 , they are just waitng from ir side permission to rasie it's level from ground to normal pf 's height position some delay is there may be out of fund/delay
pf 4 and pf 5 propoal are all ready under way and concrete layer also been over besides pf 3 , they are just waitng from ir side permission to rasie it's level from ground to normal pf 's height position some delay is there may be out of fund/delay