Search Forum
Filters:
Blog Posts by ET ALD Electrified
Aug 03 2020 (05:26) 12322/Mumbai CSMT - Howrah Mail (Via Gaya) (PT) | STA/Satna Junction (3 PFs) | ET/WDP-4B/40061
Praveenpkmrm^~
Praveenpkmrm^~ 1713 blog postsItarsi Wdp4B 40061 Arriving Satna Jn. With 12322 Mumbai CST Howrah Mail Sf
1 Public Posts - Mon Aug 03, 2020
3 Public Posts - Mon Aug 03, 2020
Satna Jn scenery after STA-KTE CRS,
PIC-1 = ltt-varanasi with unknown shed WAP-7
PIC-2 = sta Goods-platform before PF-1
PIC-3 = various freight locos standing light from
NKJ, Valsad, Itarsi, Ajni, Vijyawada shed...
more...
PIC-1 = ltt-varanasi with unknown shed WAP-7
PIC-2 = sta Goods-platform before PF-1
PIC-3 = various freight locos standing light from
NKJ, Valsad, Itarsi, Ajni, Vijyawada shed...
more...
Again postponed STA-KTE CRS, along with REWA-TURKI new double line electrification
Now frieght train will be pulled by eloco beteeen STA-KTE, no need to attach detach d-locos between STA-KTE, a big relief to Shunter Staff, CRS is still pending
1 Public Posts - Tue May 19, 2020
KTE-STA electrification completed, finally ALD-ET route electrification work is fully completed, CRS is not done yet!
1 Public Posts - Thu May 07, 2020
3 Public Posts - Thu May 07, 2020
*updated post* there was some misinterpretation in the post, some RF's thought route is elctrified including CRS, !!!only electrification work is completed, and has been inspected by DRM, CRS is remaining