Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

हाटे-बाजारे एक्सप्रेस : चलती - फिरती मछली बाजार - Piyush Singh

Search Forum
Filters:
Blog Posts by
Page#    40 Blog Entries  <<prev  next>>
Rail Fanning
15360 views
19

★★★
Nov 13 2015 (12:12)   19020/Haridwar - Bandra Terminus Express | DDN/Dehradun (5 PFs) | TKD/WDP-3A/15526
 
atharvayadav49^~
atharvayadav49^~   51092 blog posts
Entry# 1647437            Tags  
19020 Dehradun Bandra Express With Its Today's Link TKD WDP 3A 15526 At Dehradun.
Translate to English
Translate to Hindi

9 Public Posts - Sat Dec 05, 2015

6575 views
0

Dec 06 2015 (20:49)
amit1982railfan   89 blog posts
Re# 1647437-10              
ye bijli ka khamba DDN mein hai ya RE mein?
Translate to English
Translate to Hindi

1 Public Posts - Sun Dec 06, 2015

1 Public Posts - Thu Dec 10, 2015
Info Update
16274 views
12

★★
Dec 02 2015 (15:02)   MFH/Mahrauli (3 PFs)
 
Ravana~   2575 blog posts
Entry# 1668341            Tags   Past Edits
An inspection van RU 101 near mahrauli on Ghaziabad-Moradabad section for inspection of electric line going towards Ghaziabad.
Translate to English
Translate to Hindi

1 Public Posts - Wed Dec 02, 2015

5719 views
0

Dec 05 2015 (22:40)
amit1982railfan   89 blog posts
Re# 1668341-2               Past Edits
thus confirmed that GZB-MB work is all complete and hopefully it gets passed by the CRS...time for some kadak bijli action on the high speed GZB-MB route...bahut ho gaya is route pe tel phookna! :-)
Translate to English
Translate to Hindi

1 Public Posts - Sat Dec 05, 2015

5620 views
0

Dec 05 2015 (23:50)
amit1982railfan   89 blog posts
Re# 1668341-4              
possibly the inspection is happening phase wise - say GZB-HPU, HPU-GJL, GJL-MB (something like that). besides they may also be checking if the TSS is integrated properly with the line traction or not, the unwired turnouts properly managed or not, any loose hanging/sagging wires or not, are the wires at sufficient height or not, pantograph contacts proper or not to ensure no entangling happens and the list is endless..most comprehensive check may probably be at GMS bridge...one of the crucial points..
Translate to English
Translate to Hindi

2 Public Posts - Mon Dec 28, 2015
1 Followers
Rail Fanning
14911 views
16

★★
Nov 25 2015 (14:16)   11301/Udyan Express (PT) | PUNE/Pune Junction (6 PFs) | UBL/WDP-4B/40007
 
guest   290 blog posts
Entry# 1661084            Tags  
#ObservationsAtPune
Mumbai-Bangalore Udyan Exp with UBL WDP4B # 40007 speeding out of Pune Jn (25th November)
Translate to English
Translate to Hindi

2 Public Posts - Wed Nov 25, 2015

8103 views
2

Nov 25 2015 (19:22)
amit1982railfan   89 blog posts
Re# 1661084-3               Past Edits
Nice pics.
How come this portion still not electrified? Pune-GIT-HDP stretch right? I see electrification is almost done till DD.
Translate to English
Translate to Hindi

3 Public Posts - Wed Nov 25, 2015
1 Followers
General Travel
19837 views
17

★★
Nov 22 2015 (18:22)   12229/Lucknow Mail (PT) | PKW/Pilkhua (3 PFs) | TKD/WDP-4D/40087
 
AV12621~
AV12621~   1403 blog posts
Entry# 1658063            Tags   Past Edits
A Tribute to the EMD monsters of Indian Railways. A Compilation which features the EMD hauled trains connecting Delhi and Lucknow, the only train which I didn't include in this is the Jansadharan express, a video of which i couldn't get with an EMD. Please enjoy the compilation, a salute to the EMD GT46PAC and its variants. YT link:- click here
Suggestions are welcome if any.
Translate to English
Translate to Hindi

4 Public Posts - Sun Nov 22, 2015

2301 views
2

Nov 23 2015 (10:38)
amit1982railfan   89 blog posts
Re# 1658063-5               Past Edits
almost entire stretch say 99% completed. The only point missing was last 1 km from Mahrauli to GZB where poles and catenary were set up and wiring was pending. That is also mostly completed. TSS in July at 3 places were pending but work has sped up so much that even they are close to completion. Per information from NR DRM, this section is likely to be energized to 25kV in December but I would say atleast January 2016. Moreover, the most crucial thing pending is the CRS inspection and a couple of trial runs by some WAG 5/7 or a WAP1 like they did on the Haridwar-Laksar section. If that is done then we should see all e-locos taking up NDLS-MB-LKO stretch in a few months to come.
FYI,
...
more...
if you see from the entire IR perspective, GZB-MB electrification has been the fastest of all in the last 6-8 months.

Translate to English
Translate to Hindi

4 Public Posts - Mon Nov 23, 2015

9 Public Posts - Tue Nov 24, 2015

9 Public Posts - Wed Nov 25, 2015
Rail Fanning
1676 views
2

Nov 12 2015 (21:41)   12430/New Delhi - Lucknow AC SF Express
 
amit1982railfan   89 blog posts
Entry# 1646928            Tags   Past Edits
Ran with a major offlink on 10/11/15 (night before Diwali)...it was Andal WDG3A..the combination of green alco with ICF Raj rakes looked awesome...unfortunately was so tired that day that just boarded the train and slept off...so couldn't click any pics..:-(
Translate to English
Translate to Hindi
Page#    40 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy