Search Forum
Filters:
Blog Posts by
Nov 13 2015 (12:12) 19020/Haridwar - Bandra Terminus Express | DDN/Dehradun (5 PFs) | TKD/WDP-3A/15526
![](http://st.indiarailinfo.com/images/1.png)
atharvayadav49^~
atharvayadav49^~ 51092 blog posts19020 Dehradun Bandra Express With Its Today's Link TKD WDP 3A 15526 At Dehradun.
9 Public Posts - Sat Dec 05, 2015
1 Public Posts - Sun Dec 06, 2015
1 Public Posts - Thu Dec 10, 2015
An inspection van RU 101 near mahrauli on Ghaziabad-Moradabad section for inspection of electric line going towards Ghaziabad.
1 Public Posts - Wed Dec 02, 2015
thus confirmed that GZB-MB work is all complete and hopefully it gets passed by the CRS...time for some kadak bijli action on the high speed GZB-MB route...bahut ho gaya is route pe tel phookna! :-)
1 Public Posts - Sat Dec 05, 2015
possibly the inspection is happening phase wise - say GZB-HPU, HPU-GJL, GJL-MB (something like that). besides they may also be checking if the TSS is integrated properly with the line traction or not, the unwired turnouts properly managed or not, any loose hanging/sagging wires or not, are the wires at sufficient height or not, pantograph contacts proper or not to ensure no entangling happens and the list is endless..most comprehensive check may probably be at GMS bridge...one of the crucial points..
2 Public Posts - Mon Dec 28, 2015
Nov 25 2015 (14:16) 11301/Udyan Express (PT) | PUNE/Pune Junction (6 PFs) | UBL/WDP-4B/40007
guest 290 blog posts
![](http://st.indiarailinfo.com/images/1.png)
#ObservationsAtPune
Mumbai-Bangalore Udyan Exp with UBL WDP4B # 40007 speeding out of Pune Jn (25th November)
Mumbai-Bangalore Udyan Exp with UBL WDP4B # 40007 speeding out of Pune Jn (25th November)
2 Public Posts - Wed Nov 25, 2015
Nice pics.
How come this portion still not electrified? Pune-GIT-HDP stretch right? I see electrification is almost done till DD.
How come this portion still not electrified? Pune-GIT-HDP stretch right? I see electrification is almost done till DD.
3 Public Posts - Wed Nov 25, 2015
Nov 22 2015 (18:22) 12229/Lucknow Mail (PT) | PKW/Pilkhua (3 PFs) | TKD/WDP-4D/40087
![](http://st.indiarailinfo.com/images/1.png)
AV12621~
AV12621~ 1403 blog postsA Tribute to the EMD monsters of Indian Railways. A Compilation which features the EMD hauled trains connecting Delhi and Lucknow, the only train which I didn't include in this is the Jansadharan express, a video of which i couldn't get with an EMD. Please enjoy the compilation, a salute to the EMD GT46PAC and its variants. YT link:- click here
Suggestions are welcome if any.
Suggestions are welcome if any.
4 Public Posts - Sun Nov 22, 2015
almost entire stretch say 99% completed. The only point missing was last 1 km from Mahrauli to GZB where poles and catenary were set up and wiring was pending. That is also mostly completed. TSS in July at 3 places were pending but work has sped up so much that even they are close to completion. Per information from NR DRM, this section is likely to be energized to 25kV in December but I would say atleast January 2016. Moreover, the most crucial thing pending is the CRS inspection and a couple of trial runs by some WAG 5/7 or a WAP1 like they did on the Haridwar-Laksar section. If that is done then we should see all e-locos taking up NDLS-MB-LKO stretch in a few months to come.
FYI,...
more...
FYI,...
more...
4 Public Posts - Mon Nov 23, 2015
9 Public Posts - Tue Nov 24, 2015
9 Public Posts - Wed Nov 25, 2015
Ran with a major offlink on 10/11/15 (night before Diwali)...it was Andal WDG3A..the combination of green alco with ICF Raj rakes looked awesome...unfortunately was so tired that day that just boarded the train and slept off...so couldn't click any pics..:-(