Jun 02 2023 (14:07) 12807/Samata Express | VSKP/Visakhapatnam Junction (8 PFs)
VivekVardhan
VivekVardhan 128 blog postsWhen did 12803/12804/12807/12808 Samata/Swarna jayanti got B7 ?
It was having 1-1st AC, 2-2nd AC & 6-3rd AC = Total 9 AC coaches. Now it is showing B7 and sleepers showing S1-S6
It was having 1-1st AC, 2-2nd AC & 6-3rd AC = Total 9 AC coaches. Now it is showing B7 and sleepers showing S1-S6
2 Public Posts - Fri Jun 02, 2023
37167 Ajni WAP-7 powering 12808 Hazrat Nizamuddin⇌Visakhapatnam Samta SF Express running late by 4hrs skipping Bhilai Nagar from a loopline because of freight standing in a main line and heading towards it's next halt at Raipur jn.
1 Public Posts - Mon May 22, 2023
Why some of the sections in Titlagarh-Raipur section are still showing as construction going on. I think section between Titlagarh-Raipur R-V block hut is FEDL but in map some sections like Lakhna-Harishanker Road-Turleka Road & Khariar Road-Komakhan is not showing as FEDL.
Request ADMIN to please update the sections as FEDL.
Request ADMIN to please update the sections as FEDL.
2 Public Posts - Thu May 11, 2023
Oh Thanks for updating the Atlas
Now Raipur Titilagarh 203 km is fully double and electrified line. Only 3 km between Raipur Jn and RVH was left that was commissioned on 10th May 2023
This will definitely increase speed & reduce travel time as well. Also trains which used to stop in the outer due to single line at Raipur will no longer wait.
Kudos...
more...
Now Raipur Titilagarh 203 km is fully double and electrified line. Only 3 km between Raipur Jn and RVH was left that was commissioned on 10th May 2023
This will definitely increase speed & reduce travel time as well. Also trains which used to stop in the outer due to single line at Raipur will no longer wait.
Kudos...
more...
Admin please update the status of Raipur R-V Block hut - Raipur JN rail line as FEDL as doubling, electrification and interlocking/non-interlocking in this section has been completed after the Mega block.
1 Public Posts - Wed May 10, 2023
Where it is updated ? I don't see the update in Atlas or station track status
1 Public Posts - Wed May 10, 2023
1 Public Posts - Wed May 10, 2023
Oh I see, Thanks for updating 😊
Kudos 🥳 to all rail fans, now all trains in Raipur-Waltair line will run with MPS with no delay, no stopage in the outer.
Kudos 🥳 to all rail fans, now all trains in Raipur-Waltair line will run with MPS with no delay, no stopage in the outer.
Scaling new lengths for rail infra in Odisha!
Supercritical Project: Sambalpur - Titlagarh Doubling (182 Km).
Cost of Project: ₹2618 cr.
...
more...
Supercritical Project: Sambalpur - Titlagarh Doubling (182 Km).
Cost of Project: ₹2618 cr.
...
more...
1 Public Posts - Tue Feb 07, 2023
Sambalpur - Titlagarh Doubling (182 Km) rail line got completed but Raipur - Titlagarh Doubling (203 Km) strech has not completed yet.
Still we have some parts left where doubling work is going on.
Hope...
more...
Still we have some parts left where doubling work is going on.
Hope...
more...