Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Gour Express: আমের শহর মালদা থেকে রোজ যায় শিয়ালদা - Joydeep Roy

Search Forum
Post PNR

14403/Σ BHOPAL howrah fastest 2nd ΣChain


Created: Apr 14 2013 (22:35) by guest

Description/Uses/Merits of this ΣChain
fast

00


ΣChain Blog

Page#    Showing 6 to 10 of 1886 blog entries  <<prev  next>>
Poll
605370 views
27 votes
4

Dec 14 2023 (12:48)   12003/Lucknow Jn - New Delhi Swarn Shatabdi Express | CNB/Kanpur Central (10 PFs)
arishabh1819~
arishabh1819~   1129 blog posts
Entry# 5910799            Tags   Past Edits
1 compliments
Useful:12451/52 Shram Shakti ❤
Which train would you prefer to come from New Delhi/ANVT to Kanpur Central? Remember about Speed, Priority, Time, Comfort, etc. As Your Wish. Please Vote
Translate to English
Translate to Hindi
NO vote
Any Rajdhani Express
11%
3
Lucknow Shatabdi/Kanpur Shatabdi Express
22%
6
Vande Bharat Express
33%
9
Tejas Express
15%
4
Duronto Express
4%
1
Garibrath Express
0%
0
Sampark Kranti Express
0%
0
Any Mail/Express or Superfast Express
15%
4

More Posts
General Travel
12697 views
3

Sep 02 (10:58)   12302/New Delhi - Howrah Rajdhani Express (Via Gaya) | MGS/Mughal Sarai Junction (8 PFs)
AishikRivuOriginal1155207
AishikRivuOriginal1155207   3717 blog posts
Entry# 6176146            Tags   Past Edits
How to keep your favourite train as the fastest train?? Few days ago 12302 covered NDLS-DDU 788 kms distance in 8 hrs 15 mins @ 96 kph. 22436 VB covers NDLS-BSB 759 kms distance in 8 hrs @ 95 kph. Then 12302 was stopped in DDU for 30 mins!!! Departing at 01.35 am, 12302 crossed DHN at 06.20 am & crossed BWN at 08.34 am. Can you imagine 12302 average speed was just 70 kph when it was covering the final 94.5 kms of its journey!!! I am shocked. The details: - NDLS 16.50~97.9; CNB 21.20/25~97.2; PRYJ 23.25/27~93.7; DDU 01.05/35 ~96.9; GAYA 03.42/45~79.9; DHN 06.15/20~63.6; ASN 07.15/17~82.2; BWN 08.34/p~70; HWH 09.55||
12302 reached at CNB 5 mins before, at PRYJ 8
...
more...
min before & at DDU 15 mins before the estimated time.
#RajdhaniIsStillFastest #RajdhaniVandeBharatKeBaapHain

Translate to English
Translate to Hindi

2 Posts

7829 views
0

Sep 02 (18:04)
ayyshman_198
ayyshman_198   452 blog posts
Re# 6176146-3              
naini bridge psr is 50
Translate to English
Translate to Hindi

7851 views
1

Sep 02 (18:15)
AishikRivuOriginal1155207
AishikRivuOriginal1155207   3717 blog posts
Re# 6176146-4              
made 20 again as 4 pillars faced more erosion problem. Once New bridge comes up beside it, work going on. Then PRYJ-DDU will be 90 mins journey.
New Tons bridge is also being made. Also 759 kms in 7 hrs 45 mins is 97.9 kph. But 788 kms in 8 hrs is 98.5 kph. Post post completion of New Naini rail bridge & New Tons rail bridge is made 12302 will trounce 22435 & 22416 badly. Rajdhani trains will get VBS trainset like Coaches 1st. As per ER
Translate to English
Translate to Hindi

7254 views
1

Sep 02 (18:17)
ayyshman_198
ayyshman_198   452 blog posts
Re# 6176146-5              
4 track bridge needed same as varanasi 4 track bridge
Translate to English
Translate to Hindi

6419 views
0

Sep 02 (20:43)
Ank770960
Ank770960   370 blog posts
Re# 6176146-6              
What about ndls -ddu 130 but pryj-bsb only 110??
Translate to English
Translate to Hindi

6338 views
0

Sep 02 (20:44)
Ank770960
Ank770960   370 blog posts
Re# 6176146-7              
In your dreams .
Translate to English
Translate to Hindi
Going back. Join me and enjoy.

46 Posts

FmtBlog
14795 views
0

Aug 10 (17:46)
sky_shivam~
sky_shivam~   951 blog posts
Re# 6151920-47            Tags  
@BRKY: Boraki 3 km <--> 2 km @DER: Dadri   90km/h   4h 1m late
@DER: Dadri &112 km/h #12302: New Delhi - Howrah Rajdhani Express crossed
Translate to English
Translate to Hindi

More Posts
Info Update
1164756 views
2

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   566 blog posts
Entry# 6143019            Tags   Past Edits
2 compliments
Agree Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced wnd cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that my post don't get archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can see that whether this coach composition for train sets will become a successful idea or will become a flop idea.

Translate to English
Translate to Hindi

More Posts
Rail News
46490 views
0

IR Affairs
WR/Western
Aug 07 (19:23)   Vyara Railway Station Seeks Inclusion in Amrit Bharat Scheme, Demands New Train Services

Exynos9611~   19517 news posts
Entry# 6149429         Tags   Past Edits
રજૂઆત:વ્યારા સ્ટેશન પર સુવિધા વધારવા અને દસ ટ્રેનને સ્ટોપેજ કરવા રેલવે સલાહકાર સમિતિની રજૂઆત

The Vyara railway station in Tapi district, Gujarat, is seeking to be included in the Amrit Bharat Station scheme. Vyara BJP president Rajesh Rana and the Railway Advisory Committee members have requested improvements to the station, including CCTV cameras, expanded platform sheds, coach indicators, enhanced security, and the introduction of new...
more...
train services. They have also requested stops for specific trains at Vyara station, including the Amdavad-Bairawani Express (19483), Ajmer-Puri Superfast Express (20823), Amdavad-Prayagraj Superfast Express (22967), Udyogkarmi Express (12943), Udhana-Danapur Superfast Express (20933), Rameshwaram Express (16734), Prerna Express (22137), Malda Town Express (13426), Shalimar Express (12905), and Kavi Guru Express (12950). They also request the introduction of a daily train from Nandurbar to Ahmedabad and a new train service between Surat and Ayodhya.

Gujarat ke Tapi district mein Vyara railway station ko Amrit Bharat Station scheme mein include karne ki maang ki gayi hai. Vyara BJP president Rajesh Rana aur Railway Advisory Committee ke members ne station par suvidhaon mein badlaav ki maang ki hai, jaise ki CCTV cameras, bada platform sheds, coach indicators,...
more...
security improvement, aur nayi trains chalana. Unhone Vyara station par kuchh specific trains ko stop karne ki bhi maang ki hai, jaise ki Amdavad-Bairawani Express (19483), Ajmer-Puri Superfast Express (20823), Amdavad-Prayagraj Superfast Express (22967), Udyogkarmi Express (12943), Udhana-Danapur Superfast Express (20933), Rameshwaram Express (16734), Prerna Express (22137), Malda Town Express (13426), Shalimar Express (12905), aur Kavi Guru Express (12950). Unhone Nandurbar se Ahmedabad tak daily train aur Surat se Ayodhya tak new train service shuru karne ki bhi maang ki hai.
Page#    Showing 6 to 10 of 1886 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy