Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

TKD WDP-4B "प्रतीक" - रंग ऐसा कि हर किसी को प्यार हो जाए - Anubhav Kashyap

Search Forum
Post PNR

26901/Σ Gorakhpur-Delhi chain ΣChain


Created: Sep 09 2023 (23:57) by guest

Description/Uses/Merits of this ΣChain
In case of no availability of ticket from gorakhpur to Delhi you can go to this system

01


ΣChain Blog

Page#    Showing 1 to 5 of 345 blog entries  next>>
Info Update
326969 views
2

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   530 blog posts
Entry# 6143019            Tags   Past Edits
2 compliments
Agree Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that i can save my post from getting archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can get see that whether this coach composition for train sets will become a successful idea or will become waste idea.

Translate to English
Translate to Hindi

More Posts
1 Followers
General Travel
53296 views
9

Jul 25 (18:02)   12529/Patliputra - Lucknow Jn. SF Express | GKP/Gorakhpur Junction (10 PFs)
Srijankumar
Srijankumar   40 blog posts
Entry# 6136081            Tags  

6 pics

Patliputra jn se gorakhpur jn tak
Kab chalegi new vande Bharat express
Is route par abhi 2 hi train chalti hai
Aur 1 special train hai patna jn se hi suru kar deta Indian railway......
Translate to English
Translate to Hindi
Imaginary
3892 views
4

Jul 18 (07:15)   IMG12529-2217118/♥♥Pataliputra Lucknow Jn. SF Express♥♥
Igobymanynames
Igobymanynames   53 img trains   8 popular
136 net green flags   3 green per Train
Entry# 6128516            Tags   Past Edits
Custom Ratings
Trying to improve 12529/30. So give it a good rating guys and lmk what y'all think !!!
Features:
*This new time table makes it the perfect overnight connection between Patna and Lucknow.
*No more weird arrival times at LJN.
*RSA
...
more...
with 15069/70 has been terminated.
*Frequency increased to daily.
*CC improved to include sleeper only coaches.
*Return train is a morning ICE btw LJN and PPTA without those weird timings.
This time table would surely improve the passenger experience and make it popular.
Click here: /train/232031
Tysm :D

Translate to English
Translate to Hindi

More Posts
General Travel
5975 views
0

Jul 18 (07:34)   12529/Patliputra - Lucknow Jn. SF Express | PPTA/Patliputra Junction (5 PFs)
Igobymanynames
Igobymanynames   237 blog posts
Entry# 6128524            Tags   Past Edits
Railways should imrpove the timings of 12529/30. It has some very weird timings. IMO the train should depart PPTA @ around 9 PM and arrive LJN @ around 6.30 AM. Return train should depart LJN and arrive PPTA around the same timings. Also, sleeper coaches must be included in the CC and the RSA must be cancelled. For more information, you can check out this time table I made. /train/232031 What do y'all think ??
Translate to English
Translate to Hindi
Rail Fanning
12543 views
1

Jul 16 (17:17)   12583/Lucknow Jn. - Anand Vihar Terminal AC Double Decker Express | ANVT/Anand Vihar Terminal (7 PFs)
GHAZIABAD_WAP7^~
GHAZIABAD_WAP7^~   9928 blog posts
Entry# 6127105            Tags  
LJN Double decker Arrived ANVT
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 345 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy