Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Shiv Ganga doing MPS thru a Jn - on every RailFan's bucket list

Search Gallery
Post PNR
Description/Uses/Merits of this ΣChain
Bangalore Veraval Chain Via Pune

11473/Σ Bangalore Veraval Weekly Chain ΣChain


Created: Dec 04 2012 (15:46) by Saravana Yuvaraj~

Change Departure Station:
Change Arrival Station:

02
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 76 to 100 of 455 Pic/Video Blogs  <<prev  next>>

01301XD/Udyan Special

SBC/KSR Bengaluru City Junction (Bangalore)


70026 views
14

#ZBTT01301 Udyan Express speeded up by 1 hr01302 Udyan Express slowed down by 10 mins.01302 should be speed up between Wadi and CSMT. Too much slack given at WADI-KLBG, AKOR-SUR, SUR-KWV and URI-PA. Source - Railfan Akshay
×

11302/Udyan Express


36804 views
6

❤️❤️❤️ ICF Empty Uthkrist Rake Of Udyan Express Is Resting At KSR BENGALURU Railway Station After Completing It's Journey ❤️❤️❤️Train Board ( ICF )ICF RakePicture Credits - MyselfPictures Taken On 03 September 2019💛💛💛💛💛💛💛💛💛Posted thru Follow my Trip
×

01301XD/Udyan Special

SUR/Solapur


69052 views
4

Timings of 01301/02 Mumbai - Bangalore Udyan Express has been revised w.e.f. 18 July 2020.
×

01301XD/Udyan Special

SUR/Solapur


69052 views
4

Timings of 01301/02 Mumbai - Bangalore Udyan Express has been revised w.e.f. 18 July 2020.
×

01301XD/Udyan Special

SUR/Solapur


69052 views
4

Timings of 01301/02 Mumbai - Bangalore Udyan Express has been revised w.e.f. 18 July 2020.
×

11302/Udyan Express

WADI/Wadi Junction


49953 views
10

CR - SCR LHB Rakes#irailways
×

11302/Udyan Express

SBC/KSR Bengaluru City Junction (Bangalore)


31949 views
3

Lot of people are asking for faster connectivity from BengaluruWhich among these trains do u think needs to run on IR tracks URGENTLY from BENGALURU Sorry to have missed a few routesNote:Trains can also start from Mysuru and go Via BengaluruThanks
×

11302/Udyan Express

KWV/Kurduwadi Junction


73943 views
27

#PuneSolapurGulbargaDoubling #ElectrificationUpdatesDoubling of Bhigwan - Bhalawani section is progressing very slowly. But the electrification work is progressing at rapid speed. From Bhigwan to Madha we can see poles installed. Also wiring work started from Kurduwadi outer towards Bhigwan side. Wiring work is completed between Kurduwadi outer to Kem outer including Dhavlas Station. Kem & Bhalawani stations will be the next target for this month. By Dec 2020 Bhigwan - Kurduwadi - Miraj section will be electrified. In the last image, you can see construction of Daund Electric Loco Shed.
×

11302/Udyan Express

KWV/Kurduwadi Junction


73943 views
27

#PuneSolapurGulbargaDoubling #ElectrificationUpdatesDoubling of Bhigwan - Bhalawani section is progressing very slowly. But the electrification work is progressing at rapid speed. From Bhigwan to Madha we can see poles installed. Also wiring work started from Kurduwadi outer towards Bhigwan side. Wiring work is completed between Kurduwadi outer to Kem outer including Dhavlas Station. Kem & Bhalawani stations will be the next target for this month. By Dec 2020 Bhigwan - Kurduwadi - Miraj section will be electrified. In the last image, you can see construction of Daund Electric Loco Shed.
×

11302/Udyan Express

KWV/Kurduwadi Junction


73943 views
27

#PuneSolapurGulbargaDoubling #ElectrificationUpdatesDoubling of Bhigwan - Bhalawani section is progressing very slowly. But the electrification work is progressing at rapid speed. From Bhigwan to Madha we can see poles installed. Also wiring work started from Kurduwadi outer towards Bhigwan side. Wiring work is completed between Kurduwadi outer to Kem outer including Dhavlas Station. Kem & Bhalawani stations will be the next target for this month. By Dec 2020 Bhigwan - Kurduwadi - Miraj section will be electrified. In the last image, you can see construction of Daund Electric Loco Shed.
×

11302/Udyan Express

KWV/Kurduwadi Junction


73943 views
27

#PuneSolapurGulbargaDoubling #ElectrificationUpdatesDoubling of Bhigwan - Bhalawani section is progressing very slowly. But the electrification work is progressing at rapid speed. From Bhigwan to Madha we can see poles installed. Also wiring work started from Kurduwadi outer towards Bhigwan side. Wiring work is completed between Kurduwadi outer to Kem outer including Dhavlas Station. Kem & Bhalawani stations will be the next target for this month. By Dec 2020 Bhigwan - Kurduwadi - Miraj section will be electrified. In the last image, you can see construction of Daund Electric Loco Shed.
×

11302/Udyan Express

KWV/Kurduwadi Junction


73943 views
27

#PuneSolapurGulbargaDoubling #ElectrificationUpdatesDoubling of Bhigwan - Bhalawani section is progressing very slowly. But the electrification work is progressing at rapid speed. From Bhigwan to Madha we can see poles installed. Also wiring work started from Kurduwadi outer towards Bhigwan side. Wiring work is completed between Kurduwadi outer to Kem outer including Dhavlas Station. Kem & Bhalawani stations will be the next target for this month. By Dec 2020 Bhigwan - Kurduwadi - Miraj section will be electrified. In the last image, you can see construction of Daund Electric Loco Shed.
×

11302/Udyan Express

KWV/Kurduwadi Junction


73943 views
27

#PuneSolapurGulbargaDoubling #ElectrificationUpdatesDoubling of Bhigwan - Bhalawani section is progressing very slowly. But the electrification work is progressing at rapid speed. From Bhigwan to Madha we can see poles installed. Also wiring work started from Kurduwadi outer towards Bhigwan side. Wiring work is completed between Kurduwadi outer to Kem outer including Dhavlas Station. Kem & Bhalawani stations will be the next target for this month. By Dec 2020 Bhigwan - Kurduwadi - Miraj section will be electrified. In the last image, you can see construction of Daund Electric Loco Shed.
×

11302/Udyan Express

KWV/Kurduwadi Junction


73943 views
27

#PuneSolapurGulbargaDoubling #ElectrificationUpdatesDoubling of Bhigwan - Bhalawani section is progressing very slowly. But the electrification work is progressing at rapid speed. From Bhigwan to Madha we can see poles installed. Also wiring work started from Kurduwadi outer towards Bhigwan side. Wiring work is completed between Kurduwadi outer to Kem outer including Dhavlas Station. Kem & Bhalawani stations will be the next target for this month. By Dec 2020 Bhigwan - Kurduwadi - Miraj section will be electrified. In the last image, you can see construction of Daund Electric Loco Shed.
×

11302/Udyan Express


18593 views
10

Train board
×

11302/Udyan Express


18593 views
10

Train board
×

11302/Udyan Express

SUR/Solapur

GY/WDG-4/12562


19388 views
14

Video link:- click here11301/02 Mumbai CSMT - KSR Bengaluru - Mumbai CSMT Udyan Express and 12115/16 Mumbai CSMT - Solapur - Mumbai CSMT Siddheshwar Superfast Express upgraded to brand new Linke Hofmann Busch (LHB) rake.GY WDG4 Twin powered 11302 Udyan Express on its first LHB run departing Solapur Railway Station.Must watch. For more amazing videos Please Like, share and don't forget to Subscribe.
×

11302/Udyan Express

SUR/Solapur

GY/WDG-4/12562


19388 views
14

Video link:- click here11301/02 Mumbai CSMT - KSR Bengaluru - Mumbai CSMT Udyan Express and 12115/16 Mumbai CSMT - Solapur - Mumbai CSMT Siddheshwar Superfast Express upgraded to brand new Linke Hofmann Busch (LHB) rake.GY WDG4 Twin powered 11302 Udyan Express on its first LHB run departing Solapur Railway Station.Must watch. For more amazing videos Please Like, share and don't forget to Subscribe.
×

11301/Udyan Express


18389 views
26

UNEXPECTED SURPRISE!!!! UDYAN Got LHBfied Today!!!! Link is GY WDG4 Twins!!! Spotted at Pune Jn...
×

12116/Siddheshwar SF Express

SUR/Solapur


32019 views
23

Surprisingly Siddheshwar Express and Udyan Express will be getting LHB Coaches. In the 1st week of December, Siddheshwar Express will get it's 1st LHB rake.
×

11302/Udyan Express

MHLC/Monkey Hill Cabin


16381 views
26

This is why the Mumbai-Pune line is still down. Holes in tunnel due to boulder falls & landslides, displaced tracks and broken overhead wire poles.PC - Rajendra Sir .11302 Udyan Express is the first train which passed today on this line after a long break of week. As of now only below trains will be running on this route from today to 16 Aug till further advice..12164 Chennai - Dadar Express, 11020 Konark Express and 11302 Udyan Express are restored to run on proper route to Mumbai.While these return trains diverted via Kalyan, Manmad, Daund..Trains short terminated at Pune and originate...
×

11302/Udyan Express

MHLC/Monkey Hill Cabin


16381 views
26

This is why the Mumbai-Pune line is still down. Holes in tunnel due to boulder falls & landslides, displaced tracks and broken overhead wire poles.PC - Rajendra Sir .11302 Udyan Express is the first train which passed today on this line after a long break of week. As of now only below trains will be running on this route from today to 16 Aug till further advice..12164 Chennai - Dadar Express, 11020 Konark Express and 11302 Udyan Express are restored to run on proper route to Mumbai.While these return trains diverted via Kalyan, Manmad, Daund..Trains short terminated at Pune and originate...
×

11302/Udyan Express

MHLC/Monkey Hill Cabin


16381 views
26

This is why the Mumbai-Pune line is still down. Holes in tunnel due to boulder falls & landslides, displaced tracks and broken overhead wire poles.PC - Rajendra Sir .11302 Udyan Express is the first train which passed today on this line after a long break of week. As of now only below trains will be running on this route from today to 16 Aug till further advice..12164 Chennai - Dadar Express, 11020 Konark Express and 11302 Udyan Express are restored to run on proper route to Mumbai.While these return trains diverted via Kalyan, Manmad, Daund..Trains short terminated at Pune and originate...
×

11302/Udyan Express

MHLC/Monkey Hill Cabin


16381 views
26

This is why the Mumbai-Pune line is still down. Holes in tunnel due to boulder falls & landslides, displaced tracks and broken overhead wire poles.PC - Rajendra Sir .11302 Udyan Express is the first train which passed today on this line after a long break of week. As of now only below trains will be running on this route from today to 16 Aug till further advice..12164 Chennai - Dadar Express, 11020 Konark Express and 11302 Udyan Express are restored to run on proper route to Mumbai.While these return trains diverted via Kalyan, Manmad, Daund..Trains short terminated at Pune and originate...
×

11302/Udyan Express

MHLC/Monkey Hill Cabin


16381 views
26

This is why the Mumbai-Pune line is still down. Holes in tunnel due to boulder falls & landslides, displaced tracks and broken overhead wire poles.PC - Rajendra Sir .11302 Udyan Express is the first train which passed today on this line after a long break of week. As of now only below trains will be running on this route from today to 16 Aug till further advice..12164 Chennai - Dadar Express, 11020 Konark Express and 11302 Udyan Express are restored to run on proper route to Mumbai.While these return trains diverted via Kalyan, Manmad, Daund..Trains short terminated at Pune and originate...
×

11302/Udyan Express

MHLC/Monkey Hill Cabin


16381 views
26

This is why the Mumbai-Pune line is still down. Holes in tunnel due to boulder falls & landslides, displaced tracks and broken overhead wire poles.PC - Rajendra Sir .11302 Udyan Express is the first train which passed today on this line after a long break of week. As of now only below trains will be running on this route from today to 16 Aug till further advice..12164 Chennai - Dadar Express, 11020 Konark Express and 11302 Udyan Express are restored to run on proper route to Mumbai.While these return trains diverted via Kalyan, Manmad, Daund..Trains short terminated at Pune and originate...
×

11302/Udyan Express

MHLC/Monkey Hill Cabin


16381 views
26

This is why the Mumbai-Pune line is still down. Holes in tunnel due to boulder falls & landslides, displaced tracks and broken overhead wire poles.PC - Rajendra Sir .11302 Udyan Express is the first train which passed today on this line after a long break of week. As of now only below trains will be running on this route from today to 16 Aug till further advice..12164 Chennai - Dadar Express, 11020 Konark Express and 11302 Udyan Express are restored to run on proper route to Mumbai.While these return trains diverted via Kalyan, Manmad, Daund..Trains short terminated at Pune and originate...
×

11302/Udyan Express

MYS/Mysuru Junction (Mysore)


22571 views
1

Fyi
×

11302/Udyan Express

MYS/Mysuru Junction (Mysore)


40030 views
6

Mp mysuru's letter***Restoration of daily rail connectivity between Mysuru and Mangalore/Karwar. ***Proposal for extension of services of (link: click here T.No.11301/11302 Chhatrapati Sahu Maharaj Mumbai-KSR Bengaluru City Udyan daily Express to Mysuru.***Mysuru-Kushalnagar-New Broad Gauge Railway line project. It requires STATE govt’s full support.***Extending MEMU service to all 7 days of the week.***Provision of direct rail connectivity between Mysuru and South Kerala by extending the services of (link: click here T.No.16315/36 KSR Bengaluru City-Kochuveli-KSR Bengaluru City daily express to and from Mysuru.***Second Coaching Terminal at Naganahalli on the outskirts of Mysuru City to remove operational bottlenecks Ref: Union Budget 2018-19: Railways: Pink...
×

11302/Udyan Express

MYS/Mysuru Junction (Mysore)


40030 views
6

Mp mysuru's letter***Restoration of daily rail connectivity between Mysuru and Mangalore/Karwar. ***Proposal for extension of services of (link: click here T.No.11301/11302 Chhatrapati Sahu Maharaj Mumbai-KSR Bengaluru City Udyan daily Express to Mysuru.***Mysuru-Kushalnagar-New Broad Gauge Railway line project. It requires STATE govt’s full support.***Extending MEMU service to all 7 days of the week.***Provision of direct rail connectivity between Mysuru and South Kerala by extending the services of (link: click here T.No.16315/36 KSR Bengaluru City-Kochuveli-KSR Bengaluru City daily express to and from Mysuru.***Second Coaching Terminal at Naganahalli on the outskirts of Mysuru City to remove operational bottlenecks Ref: Union Budget 2018-19: Railways: Pink...
×

11302/Udyan Express

MYS/Mysuru Junction (Mysore)


40030 views
6

Mp mysuru's letter***Restoration of daily rail connectivity between Mysuru and Mangalore/Karwar. ***Proposal for extension of services of (link: click here T.No.11301/11302 Chhatrapati Sahu Maharaj Mumbai-KSR Bengaluru City Udyan daily Express to Mysuru.***Mysuru-Kushalnagar-New Broad Gauge Railway line project. It requires STATE govt’s full support.***Extending MEMU service to all 7 days of the week.***Provision of direct rail connectivity between Mysuru and South Kerala by extending the services of (link: click here T.No.16315/36 KSR Bengaluru City-Kochuveli-KSR Bengaluru City daily express to and from Mysuru.***Second Coaching Terminal at Naganahalli on the outskirts of Mysuru City to remove operational bottlenecks Ref: Union Budget 2018-19: Railways: Pink...
×

11302/Udyan Express

MYS/Mysuru Junction (Mysore)


40030 views
6

Mp mysuru's letter***Restoration of daily rail connectivity between Mysuru and Mangalore/Karwar. ***Proposal for extension of services of (link: click here T.No.11301/11302 Chhatrapati Sahu Maharaj Mumbai-KSR Bengaluru City Udyan daily Express to Mysuru.***Mysuru-Kushalnagar-New Broad Gauge Railway line project. It requires STATE govt’s full support.***Extending MEMU service to all 7 days of the week.***Provision of direct rail connectivity between Mysuru and South Kerala by extending the services of (link: click here T.No.16315/36 KSR Bengaluru City-Kochuveli-KSR Bengaluru City daily express to and from Mysuru.***Second Coaching Terminal at Naganahalli on the outskirts of Mysuru City to remove operational bottlenecks Ref: Union Budget 2018-19: Railways: Pink...
×

11302/Udyan Express

MYS/Mysuru Junction (Mysore)


40030 views
6

Mp mysuru's letter***Restoration of daily rail connectivity between Mysuru and Mangalore/Karwar. ***Proposal for extension of services of (link: click here T.No.11301/11302 Chhatrapati Sahu Maharaj Mumbai-KSR Bengaluru City Udyan daily Express to Mysuru.***Mysuru-Kushalnagar-New Broad Gauge Railway line project. It requires STATE govt’s full support.***Extending MEMU service to all 7 days of the week.***Provision of direct rail connectivity between Mysuru and South Kerala by extending the services of (link: click here T.No.16315/36 KSR Bengaluru City-Kochuveli-KSR Bengaluru City daily express to and from Mysuru.***Second Coaching Terminal at Naganahalli on the outskirts of Mysuru City to remove operational bottlenecks Ref: Union Budget 2018-19: Railways: Pink...
×

11302/Udyan Express

MYS/Mysuru Junction (Mysore)


40030 views
6

Mp mysuru's letter***Restoration of daily rail connectivity between Mysuru and Mangalore/Karwar. ***Proposal for extension of services of (link: click here T.No.11301/11302 Chhatrapati Sahu Maharaj Mumbai-KSR Bengaluru City Udyan daily Express to Mysuru.***Mysuru-Kushalnagar-New Broad Gauge Railway line project. It requires STATE govt’s full support.***Extending MEMU service to all 7 days of the week.***Provision of direct rail connectivity between Mysuru and South Kerala by extending the services of (link: click here T.No.16315/36 KSR Bengaluru City-Kochuveli-KSR Bengaluru City daily express to and from Mysuru.***Second Coaching Terminal at Naganahalli on the outskirts of Mysuru City to remove operational bottlenecks Ref: Union Budget 2018-19: Railways: Pink...
×

11301/Udyan Express

SUR/Solapur


49387 views
12

Central Railway has decided to increase coaches of Udyan, Siddheshwar & Hassan Express from 15 Oct 2019, so all 3 trains will be having 24 coaches. According to DRM Solapur, RB has granted permission to increase 1 AC 3-Tier coach in Siddheshwar (12115/16)/Udyan Express (11301/02) and one Sleeper coach is replaced by one general unreserved coach for the convenience of short distance traveling unreserved passengers. Also one AC 2-Tier will be added to Solapur - Hassan Express i.e. Yeshwantpur Superfast (11311/12) w.e.f. 15 Oct 2019.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy