Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

शिव की जटाओं से बहती है शिव गंगा - Divyanshu

Search Gallery
Post PNR
Description/Uses/Merits of this ΣChain
Tri-weekly

11757/Σ Puttaparthy Howrah ΣChain


Created: Dec 16 2012 (22:14) by Siddharth S^~

Change Departure Station:
Change Arrival Station:

11
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 51 to 75 of 278 Pic/Video Blogs  <<prev  next>>

17212/Kondaveedu Express


17383 views
2

#TBupdate Pic Source : Self.
×

12727/Visakhapatnam - Hyderabad Godavari SF Express

BZA/Vijayawada Junction


88286 views
9

Vijayawada Jn has become more conjested these days. Hence some trains should be diverted from this stationHere is my solutions1. Every train coming from/to VSKP side and going to/coming from WL has to stop 5 min in gunadala and 2 min in rayanapadu or a new station should be constructed (named "VIJAYAWADA CITY" ) just after vijayawada north cabin(as shown in pic)[as said by one member)2. Trains coming from/to MAS going towards/coming from VSKP should totally by pass BZA station and stop at a new station called "KEDARESHWAR PET" which should be constructed (as shown in pic) 3. A new line...
×

12727/Visakhapatnam - Hyderabad Godavari SF Express

BZA/Vijayawada Junction


88286 views
9

Vijayawada Jn has become more conjested these days. Hence some trains should be diverted from this stationHere is my solutions1. Every train coming from/to VSKP side and going to/coming from WL has to stop 5 min in gunadala and 2 min in rayanapadu or a new station should be constructed (named "VIJAYAWADA CITY" ) just after vijayawada north cabin(as shown in pic)[as said by one member)2. Trains coming from/to MAS going towards/coming from VSKP should totally by pass BZA station and stop at a new station called "KEDARESHWAR PET" which should be constructed (as shown in pic) 3. A new line...
×

20805/Andhra Pradesh Express

SLO/Samalkot Junction


72507 views
4

Watch" East Godavari Samalkot Junction Trains And Station View...click here To Watch.
×

20805/Andhra Pradesh Express

SLO/Samalkot Junction


72507 views
4

Watch" East Godavari Samalkot Junction Trains And Station View...click here To Watch.
×

20805/Andhra Pradesh Express

SLO/Samalkot Junction


72507 views
4

Watch" East Godavari Samalkot Junction Trains And Station View...click here To Watch.
×

20805/Andhra Pradesh Express

SLO/Samalkot Junction


72507 views
4

Watch" East Godavari Samalkot Junction Trains And Station View...click here To Watch.
×

20805/Andhra Pradesh Express

SLO/Samalkot Junction


72507 views
4

Watch" East Godavari Samalkot Junction Trains And Station View...click here To Watch.
×

20805/Andhra Pradesh Express

SLO/Samalkot Junction


72507 views
4

Watch" East Godavari Samalkot Junction Trains And Station View...click here To Watch.
×

20805/Andhra Pradesh Express

SLO/Samalkot Junction


72507 views
4

Watch" East Godavari Samalkot Junction Trains And Station View...click here To Watch.
×

17212/Kondaveedu Express

MKL/Makalidurga


5325 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


5325 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


5325 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


11182 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11182 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11182 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11182 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11182 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11182 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11182 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11182 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


8607 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8607 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8607 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8607 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8607 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8607 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


3997 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3997 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3997 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3997 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3997 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3997 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61715 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express


2792 views
1

Departed...ET 22883 P4
×

17212/Kondaveedu Express


2143 views
0

18464 Prashanti with 22323 OR BZA
×

12840/MGR Chennai Central - Howrah Mail


15758 views
1

Blast from past-pure bliss WAP4 actions of rescheduled trains post Jnaneswari Express tragedy.Early morning actions at one of the most sought after spot in Howrah Kharagpur section of South Eastern Railways.Trains spotted were:12840 Chennai Howrah Mail12838 Puri Howrah Express12834 Howrah Ahmedabad Express12152 Howrah LTT Samarsata Express12906 Howrah Porbander Express12130 Howrah Pune Azad Hind Express.
×

12840/MGR Chennai Central - Howrah Mail


15758 views
1

Blast from past-pure bliss WAP4 actions of rescheduled trains post Jnaneswari Express tragedy.Early morning actions at one of the most sought after spot in Howrah Kharagpur section of South Eastern Railways.Trains spotted were:12840 Chennai Howrah Mail12838 Puri Howrah Express12834 Howrah Ahmedabad Express12152 Howrah LTT Samarsata Express12906 Howrah Porbander Express12130 Howrah Pune Azad Hind Express.
×

12840/MGR Chennai Central - Howrah Mail

GVN/Godavari

LGD/WAP-4/22516


18353 views
7

12840 Chennai Central - Howrah Mail with LGD WAP4 22516 slowly exiting Godavari Arch bridge to make an unscheduled halt at Godavari station..
×

17212/Kondaveedu Express

YPR/Yesvantpur Junction


5784 views
8

at yesvantpur
×

12840/MGR Chennai Central - Howrah Mail

KVR/Kovvur

LGD/WAP-7/30583


61046 views
10

Three in ONE..The legendary 12840 MAS HWH Superfast Mail with LGD WAP7 30583 Overtaking BZA-RJY MEMU and crossing RJY-NS DEMU at Kovvur station on Eluru-Rajahmundry section of BZA division..
×

17212/Kondaveedu Express

ORH/Oddarahalli

BZA/WAP-4/22592


14728 views
19

BZA WAP-4 22592 cruising through mainline of Oddarahalli with 17212 Yeshvantapur - Machilipatnam Kondaveedu Express...
×

12840/MGR Chennai Central - Howrah Mail

MAS/MGR Chennai Central

LGD/WAP-7/30587


18590 views
6

Presenting life line of Madras-Howrah trunk route LGD WAP 7,30587 getting coupled with 12840 Madras-Howrah Mail,The train is having distinction of getting diesel loco for the first time in IR.
×

12840/MGR Chennai Central - Howrah Mail

MAS/MGR Chennai Central

LGD/WAP-7/30587


18590 views
6

Presenting life line of Madras-Howrah trunk route LGD WAP 7,30587 getting coupled with 12840 Madras-Howrah Mail,The train is having distinction of getting diesel loco for the first time in IR.
×

12840/MGR Chennai Central - Howrah Mail

MAS/MGR Chennai Central

LGD/WAP-7/30587


18590 views
6

Presenting life line of Madras-Howrah trunk route LGD WAP 7,30587 getting coupled with 12840 Madras-Howrah Mail,The train is having distinction of getting diesel loco for the first time in IR.
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12101/Jnaneswari Express

HWH/Howrah Junction


43224 views
31

EARLY MORNING CAPTURE AT HOWRAH Got an opportunity to capture some of the early morning arrivals at Howrah Pic 1 to 5 - Jnanshwari super delux arrived on pf 20 with Howrah p4 in the lead. Interestingly the front EOG was attached in reverse position, i.e., the vestibule was facing the locoPic 6,7 - Vishakapatnam Red beast 22992 brought Chennai Howrah Mail aka Madras mail on pf 23 at 4.15 with a delay of 15minsPic 8,9,10 - Another red beast, this time of Santragachhi shed, placed itself on pf 17 after completing its duty with Puri Howrah superfast ...
×

12840/MGR Chennai Central - Howrah Mail

RJY/Rajahmundry


14810 views
0

BZA RJY done in 2hrs 15mins with 3 halts overtook Circar at NDD excellent run.Due to slow schedule compare to other trains had to wait at RJY for 14mins
×

12840/MGR Chennai Central - Howrah Mail

RJY/Rajahmundry


14810 views
0

BZA RJY done in 2hrs 15mins with 3 halts overtook Circar at NDD excellent run.Due to slow schedule compare to other trains had to wait at RJY for 14mins
×

17212/Kondaveedu Express

YNK/Yelahanka Junction

GY/WDP-4D/40112


12887 views
12

BACK WITH DIESEL Loco Link Today -Gooty WDP4D Hauling Kondaveedu Express!! Video Link: click here
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy