Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

अपनी संपूर्ण क्रांति, राजधानी से कम है के 🔥- Arjun Rai

Search Gallery
Post PNR
Description/Uses/Merits of this ΣChain
Pretty Good Conenctivity Buffer is less but the first train is very punctual. Best alternate for HYB Express Especially for weekends

11961/Σ MAS-RU-SC Penta Weekly Connection ΣChain


Created: Dec 21 2012 (14:42) by ItsMePK^~

Change Departure Station:
Change Arrival Station:

01
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 1 to 25 of 83 Pic/Video Blogs  next>>

17230/Sabari Express

SC/Secunderabad Junction


103250 views
7

17229/30 Secunderabad Trivandrum Ctrl Sabari Express will be running with LHB coaches soon. SCR has alloted 5 LHB set of rakes to 12763/64 and 12731/32 Tirupati Secunderabad SF and Padmavathi SF Exp for conversion. Official notification will be released soon. Rake Sharing Arrangement (RSA) will be existed same and timings will be same.ARP is under suspension i.e 03/10/2024 from, there is a chance of getting LHB earlier too.
×

12797/Venkatadri SF Express

KCG/Kacheguda


150450 views
13

49 𝐲𝐞𝐚𝐫𝐬 𝐬𝐩𝐥 𝐠𝐢𝐟𝐭 𝐟𝐫𝐨𝐦 𝐒𝐂𝐑 𝐭𝐨 𝐕𝐞𝐧𝐤𝐚𝐭𝐚𝐝𝐫𝐢 𝐒𝐅 𝐄𝐱𝐩12797/98 are under suspension from "18𝐭𝐡 𝐒𝐞𝐩𝐭 2024" and expected to run with LHB Coaches the prestigious train of SCR is finally to be LHB
×

12797/Venkatadri SF Express

KCG/Kacheguda


150450 views
13

49 𝐲𝐞𝐚𝐫𝐬 𝐬𝐩𝐥 𝐠𝐢𝐟𝐭 𝐟𝐫𝐨𝐦 𝐒𝐂𝐑 𝐭𝐨 𝐕𝐞𝐧𝐤𝐚𝐭𝐚𝐝𝐫𝐢 𝐒𝐅 𝐄𝐱𝐩12797/98 are under suspension from "18𝐭𝐡 𝐒𝐞𝐩𝐭 2024" and expected to run with LHB Coaches the prestigious train of SCR is finally to be LHB
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42379 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

17230/Sabari Express

SC/Secunderabad Junction


284464 views
6

Finally LHB for sabari with same RSA and Speedup is expected..!
×

SC/Secunderabad Junction


204101 views
5

Updated TT For 12734 LPI TPTY Narayanadri Exp to depart LPI 1 hr late (i.e- 18:25) W.E.F- 16/12/23 because of less layover time at LPI of its RSA with Devagiri Exp.12764 Padmavathi express slowed by 20 min to reach TPTY- 07:15SC-MUGR-SC to follow same RSA pattern Simhapuri To run with Revised CC W.E.F 13th Dec 2023Falaknuma 1st LHB run with New RSA with the Revised and updated CC W.E.F 15th Dec 2023IDK why SCR is so lazy in releasing the PRs now Ajanta express PR is not issued yet ,need to wait till 15th or 16th for its Terminal...
×

SC/Secunderabad Junction


204101 views
5

Updated TT For 12734 LPI TPTY Narayanadri Exp to depart LPI 1 hr late (i.e- 18:25) W.E.F- 16/12/23 because of less layover time at LPI of its RSA with Devagiri Exp.12764 Padmavathi express slowed by 20 min to reach TPTY- 07:15SC-MUGR-SC to follow same RSA pattern Simhapuri To run with Revised CC W.E.F 13th Dec 2023Falaknuma 1st LHB run with New RSA with the Revised and updated CC W.E.F 15th Dec 2023IDK why SCR is so lazy in releasing the PRs now Ajanta express PR is not issued yet ,need to wait till 15th or 16th for its Terminal...
×

12763/Padmavathi SF Express

TPTY/Tirupati


37587 views
0

I got this inf from. Pic
×

12763/Padmavathi SF Express

MDR/Madhira


36523 views
1

Additional stoppage
×

23263 views
0

@TNP   15m late@BBQ: Basin Bridge Jn &23 km/h Crossed Basin bridge Parallel Race With #16053: MGR Chennai Ctrl Tirupati Express
×

38849 views
2

@SC   2h 39m late@SC: Secunderabad Jn &1 km/h My Valentine #12763: Padmavathi SF Express
×

24498 views
1

@BZA   n/a@BZA: Vijayawada Jn &0 km/h #12763: Padmavathi SF Express
×

24498 views
1

@BZA   n/a@BZA: Vijayawada Jn &0 km/h #12763: Padmavathi SF Express
×

24498 views
1

@BZA   n/a@BZA: Vijayawada Jn &0 km/h #12763: Padmavathi SF Express
×

24498 views
1

@BZA   n/a@BZA: Vijayawada Jn &0 km/h #12763: Padmavathi SF Express
×

24498 views
1

@BZA   n/a@BZA: Vijayawada Jn &0 km/h #12763: Padmavathi SF Express
×

16053/MGR Chennai Central - Tirupati Express

KOTR/Korattur

AJJ/WAP-4/22654


60473 views
21

Melodiously Honking AJJ WAP4 Powers Chennai Tirupati Express [4K]-AJJ WAP4 22654 goes on a rampage through Korattur with the Tirupati bound 16053 Chennai Central Tirupati Express.-Date: 10th November 2022.-To Subscribe-click here
×

17209/Seshadri Express

TPTY/Tirupati


168683 views
6

Special Trains between Kakinada Town – Tirupati - Secunderabad
×

12733/Narayanadri SF Express

SC/Secunderabad Junction


66955 views
7

Special Train Between SC TPTY SCNS SC One way Special
×

12733/Narayanadri SF Express

SC/Secunderabad Junction


66955 views
7

Special Train Between SC TPTY SCNS SC One way Special
×

23218 views
1

@RU   n/a@RU: Renigunta Jn &1 km/h Captured my Bae, #12763: Padmavathi SF Express with $WAP-7+LGD 30258.
×

23218 views
1

@RU   n/a@RU: Renigunta Jn &1 km/h Captured my Bae, #12763: Padmavathi SF Express with $WAP-7+LGD 30258.
×

23218 views
1

@RU   n/a@RU: Renigunta Jn &1 km/h Captured my Bae, #12763: Padmavathi SF Express with $WAP-7+LGD 30258.
×

67505 views
2

@MAS   18m early@MAS: MGR Chennai Ctrl &0 km/h #16053: MGR Chennai Ctrl Tirupati Express Our loco 😍 AJJ WAP-4 ❤️
×

70213 views
1

@MAS   42m early@MAS: MGR Chennai Ctrl &0 km/h #16053: MGR Chennai Ctrl Tirupati Express Our train 🚂🚃😇
×

16053/MGR Chennai Central - Tirupati Express


27649 views
1

Present seat availability
×

12763/Padmavathi SF Express


40840 views
2

Train Board
×

12763/Padmavathi SF Express


40840 views
2

Train Board
×

12763/Padmavathi SF Express

TPTY/Tirupati

SRC/WAP-4/22637


35470 views
7

📸🚄✈️🔥"𝗦𝗔𝗬𝗔𝗡𝗧𝗔-𝗣𝗛𝗢𝗧𝗢 & 𝗘𝗗𝗜𝗧𝗢𝗚𝗥𝗔𝗣𝗛𝗬"🔥✈️🚄📸 𝕆𝕟 𝕃𝕖𝕗𝕥 𝕊𝕚𝕕𝕖'𝕊ℝℂ 𝕎𝔸ℙ 𝟜#𝟚𝟚𝟞𝟛𝟟' 𝕎𝕚𝕥𝕙 "𝟚𝟚𝟠𝟝𝟞 𝕋𝕀ℝ𝕌ℙ𝔸𝕋𝕀 𝕄𝔸𝕀ℕ (𝕋ℙ𝕋𝕐)- 𝕊𝔸ℕ𝕋ℝ𝔸𝔾𝔸ℂℍ𝕀 (𝕊ℝℂ) 𝕎𝔼𝔼𝕂𝕃𝕐 𝕊.𝔽. 𝔼𝕏ℙℝ𝔼𝕊𝕊." 𝕆𝕟 ℝ𝕚𝕘𝕙𝕥 𝕊𝕚𝕕𝕖'𝔹ℤ𝔸 𝕎𝔸ℙ 𝟜#𝟚𝟚𝟟𝟜𝟟' 𝕎𝕚𝕥𝕙 "𝟙𝟚𝟟𝟞𝟛 𝕋𝕀ℝ𝕌ℙ𝔸𝕋𝕀 𝕄𝔸𝕀ℕ (𝕋ℙ𝕋𝕐)-𝕊𝔼ℂ𝕌ℕ𝔻𝔼ℝ𝔸𝔹𝔸𝔻 𝕁ℕ.(𝕊ℂ) ℙ𝔸𝔻𝕄𝔸𝕍𝔸𝕋𝕀 𝕊.𝔽. 𝔼𝕏ℙℝ𝔼𝕊𝕊."
×

12763/Padmavathi SF Express

SC/Secunderabad Junction


27238 views
2

At SECUNDERABAD JN.
×

12763/Padmavathi SF Express


23252 views
0

Bang before time at Gudur junction
×

16053/MGR Chennai Central - Tirupati Express

TRL/Tiruvallur


27871 views
12

16053 MGR Chennai Central - Tirupati Express Entered Standing PF No. 6 Departure Tiruvallur..
×

16053/MGR Chennai Central - Tirupati Express

TRL/Tiruvallur


27871 views
12

16053 MGR Chennai Central - Tirupati Express Entered Standing PF No. 6 Departure Tiruvallur..
×

16053/MGR Chennai Central - Tirupati Express

TRL/Tiruvallur


27871 views
12

16053 MGR Chennai Central - Tirupati Express Entered Standing PF No. 6 Departure Tiruvallur..
×

16053/MGR Chennai Central - Tirupati Express

TRL/Tiruvallur


27871 views
12

16053 MGR Chennai Central - Tirupati Express Entered Standing PF No. 6 Departure Tiruvallur..
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy