12410 GONDWANA Express Departing From TILDA-NEORA, तिल्दा-नेवरा से प्रस्थान करती गोंडवाना एक्सप्रेसYoutube link:click here12410 Hazrat Nizamuddin Raigarh Gondwana Express Departing From Tilda-Neora Railway Station After Getting Delayed By More Than 3 Hours.
12410 GONDWANA Express Departing From TILDA-NEORA, तिल्दा-नेवरा से प्रस्थान करती गोंडवाना एक्सप्रेसYoutube link:click here12410 Hazrat Nizamuddin Raigarh Gondwana Express Departing From Tilda-Neora Railway Station After Getting Delayed By More Than 3 Hours.
Gap between coach and PF at BSP, even the height was low
×
20518 views
0
1 km from @MTJ 9m late@MTJ: Mathura Jn &49 km/h
xing with #12410: Hazrat Nizamuddin Raigarh Gondwana Express
×
18426/Durg - Puri Express
DURG/Durg Junction
BRC/WAP-7/30502
52763 views
4
30502 Fortune Livery Vadodara WAP7 with 18426 Durg - Puri express ready for departure from Durg junction. There was a HOG port cable problem as the HOG cable was not working due to which train is running with back EOG on. This loco came with Gandhidham - Puri SF express from Ahmedabad till Titlagarh junction yesterday and as the train is having loco change and on same day morning grom TIG junction BRC WAP7 took charge of 18425 Puri - Durg express till Durg station.
• Mega Offlink #37201 Pranav Jewellery Advertised RPM WAP-7 hauling 12410 Hazrat-Nizamuddin⇌Raigarh Gondwana Express arrived at Durg jn with a delayed by 53 mins. 🚂🚃
• Mega Offlink #37201 Pranav Jewellery Advertised RPM WAP-7 hauling 12410 Hazrat-Nizamuddin⇌Raigarh Gondwana Express arrived at Durg jn with a delayed by 53 mins. 🚂🚃
• Mega Offlink #37201 Pranav Jewellery Advertised RPM WAP-7 hauling 12410 Hazrat-Nizamuddin⇌Raigarh Gondwana Express arrived at Durg jn with a delayed by 53 mins. 🚂🚃
• Mega Offlink #37201 Pranav Jewellery Advertised RPM WAP-7 hauling 12410 Hazrat-Nizamuddin⇌Raigarh Gondwana Express arrived at Durg jn with a delayed by 53 mins. 🚂🚃
• Mega Offlink #37201 Pranav Jewellery Advertised RPM WAP-7 hauling 12410 Hazrat-Nizamuddin⇌Raigarh Gondwana Express arrived at Durg jn with a delayed by 53 mins. 🚂🚃
• Mega Offlink #37201 Pranav Jewellery Advertised RPM WAP-7 hauling 12410 Hazrat-Nizamuddin⇌Raigarh Gondwana Express arrived at Durg jn with a delayed by 53 mins. 🚂🚃
×
17885 views
0
1 km from @BFP 2m late@BFP: Billoch Pura &120 km/h Overtook #12410: Hazrat Nizamuddin Raigarh Gondwana Express at Bilochpura Agra .
Two LHB Rakes On Puri Station!!1.12815-.Annadvihar-Puri Express(Left)(Nandankannan Express via adra)2.18426-Puri-Durg Intercity Express(via cuttack)(RIght)
Video Link - click here.12410 Hazrat Nizamuddin - Raigarh Gondwana Express departing Vidisha and Crossing 12192 Jabalpur - Hazrat Nizamuddin Shridham Express.
×
18426/Durg - Puri Express
BPHB/Bhilai Power House
SRC/WAP-7/37010
54052 views
7
Offlink 37010 SRC WAP7 with Durg - Puri express. Actually i got some information about the HOG failure of 37010 Locomotive but i found that the hog connection is perfect and no any failure in the Locomotive. 37010 SRC WAP7 which came with Ispat was putted in Puri Durg express from Titlagarh.
×
18426/Durg - Puri Express
BPHB/Bhilai Power House
SRC/WAP-7/37010
54052 views
7
Offlink 37010 SRC WAP7 with Durg - Puri express. Actually i got some information about the HOG failure of 37010 Locomotive but i found that the hog connection is perfect and no any failure in the Locomotive. 37010 SRC WAP7 which came with Ispat was putted in Puri Durg express from Titlagarh.
×
18426/Durg - Puri Express
BPHB/Bhilai Power House
SRC/WAP-7/37010
54052 views
7
Offlink 37010 SRC WAP7 with Durg - Puri express. Actually i got some information about the HOG failure of 37010 Locomotive but i found that the hog connection is perfect and no any failure in the Locomotive. 37010 SRC WAP7 which came with Ispat was putted in Puri Durg express from Titlagarh.
×
18426/Durg - Puri Express
BPHB/Bhilai Power House
SRC/WAP-7/37010
54052 views
7
Offlink 37010 SRC WAP7 with Durg - Puri express. Actually i got some information about the HOG failure of 37010 Locomotive but i found that the hog connection is perfect and no any failure in the Locomotive. 37010 SRC WAP7 which came with Ispat was putted in Puri Durg express from Titlagarh.
×
18426/Durg - Puri Express
BPHB/Bhilai Power House
SRC/WAP-7/37010
54052 views
7
Offlink 37010 SRC WAP7 with Durg - Puri express. Actually i got some information about the HOG failure of 37010 Locomotive but i found that the hog connection is perfect and no any failure in the Locomotive. 37010 SRC WAP7 which came with Ispat was putted in Puri Durg express from Titlagarh.
×
18426/Durg - Puri Express
BQR/Bhilai Nagar
BRC/WAP-7/37595
38320 views
3
37595 BRC WAP7 (Faiveley LX3600 Single Arm Rapid Transit HR Pantograph) with 18426 Durg - Puri express.Date of capture: 16 January 2021place: Bhilai Nagar (SECR Zone)
×
18426/Durg - Puri Express
DURG/Durg Junction
BRC/WAP-7/37595
38962 views
3
37595 BRC WAP7 with Faiveley LX3600 Single Arm Rapid Transit HR Pantograph taken charge of 18426 Durg - Puri express from durg today.
×
18426/Durg - Puri Express
DURG/Durg Junction
BRC/WAP-7/37595
38962 views
3
37595 BRC WAP7 with Faiveley LX3600 Single Arm Rapid Transit HR Pantograph taken charge of 18426 Durg - Puri express from durg today.
×
18426/Durg - Puri Express
DURG/Durg Junction
BRC/WAP-7/37595
38962 views
3
37595 BRC WAP7 with Faiveley LX3600 Single Arm Rapid Transit HR Pantograph taken charge of 18426 Durg - Puri express from durg today.
×
18426/Durg - Puri Express
DURG/Durg Junction
BRC/WAP-7/37595
38962 views
3
37595 BRC WAP7 with Faiveley LX3600 Single Arm Rapid Transit HR Pantograph taken charge of 18426 Durg - Puri express from durg today.
×
18426/Durg - Puri Express
DURG/Durg Junction
BRC/WAP-7/37595
38962 views
3
37595 BRC WAP7 with Faiveley LX3600 Single Arm Rapid Transit HR Pantograph taken charge of 18426 Durg - Puri express from durg today.
Those old ICF days 4/10/2019 picOfflink SER SRC WAP 4 22864 stylishly curves in to Raipur Jn with NR 12410 Hazrat Nizammuddin (H.NZM)- Raigarh (RIG) Gondwana Superfast ExpressRaipur Jn (R), South East Central Railway (SECR)
×
18237/Chhattisgarh Express
NITR/NSCB Itwari Junction (Nagpur)
703072 views
31
Current status and deadline of Dalli Rajhara - Rowghat section and Rowghat - Jagdalpur section new railway line has been transferred to CPIO/Construction department.Current survey status and estimated cost of Balaghat bypass for avoid loco reversal at Balaghat for Katangi/Tirodi/Itwari bound trains and Gondia bypass for avoid loco reversal at Gondia for Durg/Raipur/Bilaspur bound trains has been transferred to CPIO/Construction department.Coaching Depot and Washing Pitline work at Itwari has been physically completed.Information regarding consideration of Ambikapur - Delhi new train via which route has been transferred to Operating department of SEC Railway/Bilaspur Division.There is no proposal regarding introduction of new train...
×
18237/Chhattisgarh Express
NITR/NSCB Itwari Junction (Nagpur)
703072 views
31
Current status and deadline of Dalli Rajhara - Rowghat section and Rowghat - Jagdalpur section new railway line has been transferred to CPIO/Construction department.Current survey status and estimated cost of Balaghat bypass for avoid loco reversal at Balaghat for Katangi/Tirodi/Itwari bound trains and Gondia bypass for avoid loco reversal at Gondia for Durg/Raipur/Bilaspur bound trains has been transferred to CPIO/Construction department.Coaching Depot and Washing Pitline work at Itwari has been physically completed.Information regarding consideration of Ambikapur - Delhi new train via which route has been transferred to Operating department of SEC Railway/Bilaspur Division.There is no proposal regarding introduction of new train...
12409/10 RIG gondwana had 139% occupancy and 99% earning in the period 1-4-19 to 31-3-20 ...12405/6 BSL gondwana had 126% occupancy and 86% earning in the period 1-4-19 to 31-3-20 ...14264/14263 Patalkot Express had 161% occupancy and 90% earning in the period 1-4-19 to 31-3-20 .
12409/10 RIG gondwana had 139% occupancy and 99% earning in the period 1-4-19 to 31-3-20 ...12405/6 BSL gondwana had 126% occupancy and 86% earning in the period 1-4-19 to 31-3-20 ...14264/14263 Patalkot Express had 161% occupancy and 90% earning in the period 1-4-19 to 31-3-20 .
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.