Page# Showing 76 to 100 of 160 Pic/Video Blogs <<prevnext>>
11107/Bundelkhand Express
ALD/Allahabad
25387 views
3
Railway never wants to finish work in time. Prg Station se Rambag ROB ke 200 metres west tak double line daal di gayi thi teen mahine pahle hi.But they are not starting work from this place to Ald station east place where Ald-Nyn NCR, Ald-Aly NER and Ald-Prg NR line meets.This remaining work is only 400 metres out of which 300 metres already has a old line (military siding) of british era, whose sleepers have entered/pressed in soil and tracks have rusted. The railway just have to replace sleepers and tracks in this 300 metres and no soil levelling required. Only...
×
11107/Bundelkhand Express
ALD/Allahabad
25387 views
3
Railway never wants to finish work in time. Prg Station se Rambag ROB ke 200 metres west tak double line daal di gayi thi teen mahine pahle hi.But they are not starting work from this place to Ald station east place where Ald-Nyn NCR, Ald-Aly NER and Ald-Prg NR line meets.This remaining work is only 400 metres out of which 300 metres already has a old line (military siding) of british era, whose sleepers have entered/pressed in soil and tracks have rusted. The railway just have to replace sleepers and tracks in this 300 metres and no soil levelling required. Only...
×
11107/Bundelkhand Express
ALD/Allahabad
25387 views
3
Railway never wants to finish work in time. Prg Station se Rambag ROB ke 200 metres west tak double line daal di gayi thi teen mahine pahle hi.But they are not starting work from this place to Ald station east place where Ald-Nyn NCR, Ald-Aly NER and Ald-Prg NR line meets.This remaining work is only 400 metres out of which 300 metres already has a old line (military siding) of british era, whose sleepers have entered/pressed in soil and tracks have rusted. The railway just have to replace sleepers and tracks in this 300 metres and no soil levelling required. Only...
×
11107/Bundelkhand Express
ALD/Allahabad
9040 views
5
Pic 1: Workers removing iron supports (patra balli) after construction of beam and side barrier at that place got over.Pic 2: Pole no. 145/11in north end to Pole No. 146/9 in south end, Bridge is approx 900 metres long.Pic 3: Chhapra LTT express going towards Prg side from Pfm side with WDP4D
×
11107/Bundelkhand Express
ALD/Allahabad
9040 views
5
Pic 1: Workers removing iron supports (patra balli) after construction of beam and side barrier at that place got over.Pic 2: Pole no. 145/11in north end to Pole No. 146/9 in south end, Bridge is approx 900 metres long.Pic 3: Chhapra LTT express going towards Prg side from Pfm side with WDP4D
×
11107/Bundelkhand Express
ALD/Allahabad
9040 views
5
Pic 1: Workers removing iron supports (patra balli) after construction of beam and side barrier at that place got over.Pic 2: Pole no. 145/11in north end to Pole No. 146/9 in south end, Bridge is approx 900 metres long.Pic 3: Chhapra LTT express going towards Prg side from Pfm side with WDP4D
×
11107/Bundelkhand Express
ALD/Allahabad
7409 views
8
Pic 1& 2: Such Gaps at 6-7 places, where one beam meet another, are being filledPic 2& 3: Jute gunny rolls (patsan ke borre) spread on newly constructed beam and wet with water for hardening and smoothening (taraai karte hue)Pic 4: After filling of gaps between adjacent beams, finally it looks like this
×
11107/Bundelkhand Express
ALD/Allahabad
7409 views
8
Pic 1& 2: Such Gaps at 6-7 places, where one beam meet another, are being filledPic 2& 3: Jute gunny rolls (patsan ke borre) spread on newly constructed beam and wet with water for hardening and smoothening (taraai karte hue)Pic 4: After filling of gaps between adjacent beams, finally it looks like this
×
11107/Bundelkhand Express
ALD/Allahabad
7409 views
8
Pic 1& 2: Such Gaps at 6-7 places, where one beam meet another, are being filledPic 2& 3: Jute gunny rolls (patsan ke borre) spread on newly constructed beam and wet with water for hardening and smoothening (taraai karte hue)Pic 4: After filling of gaps between adjacent beams, finally it looks like this
×
11107/Bundelkhand Express
ALD/Allahabad
7409 views
8
Pic 1& 2: Such Gaps at 6-7 places, where one beam meet another, are being filledPic 2& 3: Jute gunny rolls (patsan ke borre) spread on newly constructed beam and wet with water for hardening and smoothening (taraai karte hue)Pic 4: After filling of gaps between adjacent beams, finally it looks like this
×
11107/Bundelkhand Express
ALD/Allahabad
41616 views
17
Refer to blog post /blog/post/4259469 and my blog post /blog/post/3654115 I walked on ganga railway bridge (newly made one for doubling of Prayag-Phaphamau line) yesterday from south end (prg side) to north end (pfm side). I was surprised that from 04th March when kumbh mela ended, to 02 April, in less than one month, the remaining 04 beams is completed. Very fast work as 25 beams took more than two years. Now all 29 beams completed. Only gaps between some beams and side barriers at some places remains to be completed on the bridge. See picturesPic 1: View of bridge from...
×
11107/Bundelkhand Express
ALD/Allahabad
41616 views
17
Refer to blog post /blog/post/4259469 and my blog post /blog/post/3654115 I walked on ganga railway bridge (newly made one for doubling of Prayag-Phaphamau line) yesterday from south end (prg side) to north end (pfm side). I was surprised that from 04th March when kumbh mela ended, to 02 April, in less than one month, the remaining 04 beams is completed. Very fast work as 25 beams took more than two years. Now all 29 beams completed. Only gaps between some beams and side barriers at some places remains to be completed on the bridge. See picturesPic 1: View of bridge from...
×
11107/Bundelkhand Express
ALD/Allahabad
41616 views
17
Refer to blog post /blog/post/4259469 and my blog post /blog/post/3654115 I walked on ganga railway bridge (newly made one for doubling of Prayag-Phaphamau line) yesterday from south end (prg side) to north end (pfm side). I was surprised that from 04th March when kumbh mela ended, to 02 April, in less than one month, the remaining 04 beams is completed. Very fast work as 25 beams took more than two years. Now all 29 beams completed. Only gaps between some beams and side barriers at some places remains to be completed on the bridge. See picturesPic 1: View of bridge from...
×
11107/Bundelkhand Express
13950 views
0
×
11107/Bundelkhand Express
6321 views
0
Huge pax deboard at outer
×
11107/Bundelkhand Express
9280 views
2
×
11107/Bundelkhand Express
5727 views
1
Banda Electrification Update...
×
11107/Bundelkhand Express
6283 views
2
Good Quality Tea ☕️
×
11107/Bundelkhand Express
4333 views
3
My CoachNewly POHedSpecially from MLR Jhansi 😘😍
×
11107/Bundelkhand Express
4303 views
3
Coke Pio.. 🍻
×
11107/Bundelkhand Express
MUV/Manduadih
74824 views
11
Kamayani Exp and Bundelkhand Exp to run via MBS-ALY route and short terminated at MUV...Might be Vande Bharat effect 😇
×
12176/Gwalior - Howrah Chambal Express
ATE/Atarra
47759 views
6
When UP & DOWN Chambal Express have a meet up, 12176 Howrah bound Chambal SF Exp meets his Mathura bound brother 12177 Chambal SF Exp both in a single frame meeting each other @ Atarra of Jhansi ~ Manikpur section , Both were running behind their Schedules .. As We know that Chambal Express has been lhb'fied recently This is the first train of this section which is running with lhb rakes, Now Gwalior is also trying to lhbfy Bundelkhand Express ( An ISO certified train ) of this Section..
×
12176/Gwalior - Howrah Chambal Express
ATE/Atarra
47759 views
6
When UP & DOWN Chambal Express have a meet up, 12176 Howrah bound Chambal SF Exp meets his Mathura bound brother 12177 Chambal SF Exp both in a single frame meeting each other @ Atarra of Jhansi ~ Manikpur section , Both were running behind their Schedules .. As We know that Chambal Express has been lhb'fied recently This is the first train of this section which is running with lhb rakes, Now Gwalior is also trying to lhbfy Bundelkhand Express ( An ISO certified train ) of this Section..
×
12176/Gwalior - Howrah Chambal Express
ATE/Atarra
47759 views
6
When UP & DOWN Chambal Express have a meet up, 12176 Howrah bound Chambal SF Exp meets his Mathura bound brother 12177 Chambal SF Exp both in a single frame meeting each other @ Atarra of Jhansi ~ Manikpur section , Both were running behind their Schedules .. As We know that Chambal Express has been lhb'fied recently This is the first train of this section which is running with lhb rakes, Now Gwalior is also trying to lhbfy Bundelkhand Express ( An ISO certified train ) of this Section..
×
12176/Gwalior - Howrah Chambal Express
ATE/Atarra
47759 views
6
When UP & DOWN Chambal Express have a meet up, 12176 Howrah bound Chambal SF Exp meets his Mathura bound brother 12177 Chambal SF Exp both in a single frame meeting each other @ Atarra of Jhansi ~ Manikpur section , Both were running behind their Schedules .. As We know that Chambal Express has been lhb'fied recently This is the first train of this section which is running with lhb rakes, Now Gwalior is also trying to lhbfy Bundelkhand Express ( An ISO certified train ) of this Section..
×
19313/Indore - Patna Express (Via Sultanpur)
DDU/Pt. DD Upadhyaya Junction (Mughalsarai)
BZA/WAG-7/28372
31473 views
15
#RailfanningAtMughalsarai#RailfanningAtDDU 19313 Indore - Rajendra Nagar Terminal Express standing at PF3 of Mughalsaarai Jn with #offlink BZA WAG7 28372 in lead.Notice that TB only mentions 19321/22.#SidDNR
×
19313/Indore - Patna Express (Via Sultanpur)
DDU/Pt. DD Upadhyaya Junction (Mughalsarai)
BZA/WAG-7/28372
31473 views
15
#RailfanningAtMughalsarai#RailfanningAtDDU 19313 Indore - Rajendra Nagar Terminal Express standing at PF3 of Mughalsaarai Jn with #offlink BZA WAG7 28372 in lead.Notice that TB only mentions 19321/22.#SidDNR
*आज होगा भव्य शुभारंभ, मिलेगी कई ट्रेनों की सौगात, देखे रूट व समय सारिणी*👉 *नई ट्रेनें*1⃣ इंदौर- नई दिल्ली एक्सप्रेस वाया जयपुर2⃣ इंदौर- बीकानेर एक्सप्रेस3⃣ इंदौर- गांधीधाम एक्सप्रेस👉 *फेरा विस्तार*इंदौर- पटना एक्सप्रेस, नोटिफिकेशन हुआ जारी ।👉 *समय परिवर्तन*इंदौर- उदयपुर (वीर भूमि चित्तौड़गढ़ एक्सप्रेस)- प्रतिदिन अभी शुबह चलती है अब प्रतिदिन शाम को चलेगी ।
×
22163/Bhopal - Khajuraho Mahamana SF Express
INDB/Indore Junction
46549 views
4
इंदौर को मिली एक और ट्रेन- रेलमंत्री ने स्वंय दी जानकारी👉 फरवरी के पहले हफ्ते से शुरू होगी खजुराहो- इंदौर ट्रैन👉 यह है ट्रेन का प्रस्तावित रूट : फिलहाल शुरुआत दौर में यह एक्सप्रेस ट्रेन खजुराहो से रविवार, मंगलवार, शुक्रवार व शनिवार को रात 11:30 बजे चलेगी व छतरपुर, टीकमगढ़, ललितपुर, बीना, संत हिरदाराम नगर (बैरागढ़), उज्जैन होते हुए दोपहर 01:50 पर इंदौर पहुंचेगी व इंदौर से यह ट्रेन सोमवार, बुधवार, शनिवार व रविवार को दोपहर 03:55 पर चलेगी और सुबह 06:00 बजे खजुराहो पहुंचेगी। ...
×
11107/Bundelkhand Express
GWL/Gwalior Junction
VGLJ/WDP-4D
11391 views
2
Bundelkhand Express Ready To Depart Gwalior jn
×
11107/Bundelkhand Express
BSB/Varanasi Junction
20082 views
6
#RailfanningAtVaranasiTrain Board of 11107 Bundelkhand Express.#SidDNR
×
11107/Bundelkhand Express
8505 views
3
LHb in sooner time.
×
22911/Shipra Express
GWL/Gwalior Junction
69451 views
12
ग्वालियर- हावड़ा चंबल एक्सप्रेस जाएगी इंदौर,ग्वालियर- बरौनी एक्सप्रेस अब झाँसी- कानपुर नही सीधा इटावा होते हुए कानपुर जाएगी ।लोकसभा अध्यक्ष ने बोर्ड को प्रस्ताव दिया है कि ग्वालियर- हावड़ा एक्सप्रेस को इंदौर से चलाया जाए यानी ग्वालियर से इंदौर तक एक्सटेंशन दिया जाये वहीँ भिंड सांसद ने ग्वालियर- बरौनी एक्सप्रेस को वाया इटावा चलाने का प्रस्ताव दिया है ।
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
×
19313/Indore - Patna Express (Via Sultanpur)
INDB/Indore Junction
BRC/WAP-4E/22335
14538 views
6
Indore trip part 2, all pics clicked from a moving train and place is indore coaching yard1. wap4e BRC2. Indore patna train boards
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.