Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Who says South India does not have Gatimaan. It is called Vaigai Express. - Thamizh Maran

Search Gallery
Post PNR
Description/Uses/Merits of this ΣChain
Alternative chain linking Mumbai & Amritsar via ADI-AII-JP-RE-HSR-SAG

17473/Σ Mumbai-Amritsar Satnam Exp ΣChain


Created: Dec 05 2013 (14:16) by Raghu Chims

Change Departure Station:
Change Arrival Station:

14
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 76 to 100 of 178 Pic/Video Blogs  <<prev  next>>

14702/Amrapur Aravali Express


8292 views
4

Maval - Jethi
×

14702/Amrapur Aravali Express


25951 views
5

Non interlocking block . Ajmer divisionBetween (Palanpur - abu road)
×

14702/Amrapur Aravali Express


25951 views
5

Non interlocking block . Ajmer divisionBetween (Palanpur - abu road)
×

14702/Amrapur Aravali Express


25951 views
5

Non interlocking block . Ajmer divisionBetween (Palanpur - abu road)
×

14702/Amrapur Aravali Express

BHL/Bhilwara

BGKT/WDP-4B/20098


16060 views
14

19707/Amrapur Aravali Express at Bhilwara
×

14702/Amrapur Aravali Express

BHL/Bhilwara

BGKT/WDP-4B/20098


16060 views
14

19707/Amrapur Aravali Express at Bhilwara
×

14702/Amrapur Aravali Express

BHL/Bhilwara

BGKT/WDP-4B/20098


16060 views
14

19707/Amrapur Aravali Express at Bhilwara
×

14702/Amrapur Aravali Express

BHL/Bhilwara

BGKT/WDP-4B/20098


16060 views
14

19707/Amrapur Aravali Express at Bhilwara
×

14702/Amrapur Aravali Express

CTT/Chitrasani


104427 views
21

CHITRASANI a small station on (Palanpur - Abu Road) part.➡️Electrification is been done till Maval from Palanpur (excl) . which can be seen in pic 2,3 . Wiring was in progress on first loop . . ➡️Second loop will be directly connected to main line. (New double line)Before and aftee station Doubling was seen Track was layed , ..#AhmedabadAjmerDoubling#AhmedabadDelhiElectrification
×

14702/Amrapur Aravali Express

CTT/Chitrasani


104427 views
21

CHITRASANI a small station on (Palanpur - Abu Road) part.➡️Electrification is been done till Maval from Palanpur (excl) . which can be seen in pic 2,3 . Wiring was in progress on first loop . . ➡️Second loop will be directly connected to main line. (New double line)Before and aftee station Doubling was seen Track was layed , ..#AhmedabadAjmerDoubling#AhmedabadDelhiElectrification
×

14702/Amrapur Aravali Express

CTT/Chitrasani


104427 views
21

CHITRASANI a small station on (Palanpur - Abu Road) part.➡️Electrification is been done till Maval from Palanpur (excl) . which can be seen in pic 2,3 . Wiring was in progress on first loop . . ➡️Second loop will be directly connected to main line. (New double line)Before and aftee station Doubling was seen Track was layed , ..#AhmedabadAjmerDoubling#AhmedabadDelhiElectrification
×

14702/Amrapur Aravali Express

CTT/Chitrasani


104427 views
21

CHITRASANI a small station on (Palanpur - Abu Road) part.➡️Electrification is been done till Maval from Palanpur (excl) . which can be seen in pic 2,3 . Wiring was in progress on first loop . . ➡️Second loop will be directly connected to main line. (New double line)Before and aftee station Doubling was seen Track was layed , ..#AhmedabadAjmerDoubling#AhmedabadDelhiElectrification
×

14702/Amrapur Aravali Express

CTT/Chitrasani


104427 views
21

CHITRASANI a small station on (Palanpur - Abu Road) part.➡️Electrification is been done till Maval from Palanpur (excl) . which can be seen in pic 2,3 . Wiring was in progress on first loop . . ➡️Second loop will be directly connected to main line. (New double line)Before and aftee station Doubling was seen Track was layed , ..#AhmedabadAjmerDoubling#AhmedabadDelhiElectrification
×

14702/Amrapur Aravali Express


14968 views
7

ARAVALI EXP becomes the 1st choice of MUMBAI - VADODARA / AHMEDABAD . passengers .the screenshot pertains that On 110 seats Allotted to this PQWL Quota and booking raises to 147 . PQWL . and same scenario is of AC coaches ..Giving the AVG speed of 66km/h ⚡ (BVI - Ahemdabad) without SF surcharge ..
×

14702/Amrapur Aravali Express

BDTS/Mumbai Bandra Terminus


33935 views
19

19707-19708 Bandra Terminus-Jaipur Amrapur Aravali Express New Train Board Updated.Pic Clicked- SelfDate-16-07-2018 20:31
×

14702/Amrapur Aravali Express

BDTS/Mumbai Bandra Terminus


33935 views
19

19707-19708 Bandra Terminus-Jaipur Amrapur Aravali Express New Train Board Updated.Pic Clicked- SelfDate-16-07-2018 20:31
×

14702/Amrapur Aravali Express

BDTS/Mumbai Bandra Terminus


33935 views
19

19707-19708 Bandra Terminus-Jaipur Amrapur Aravali Express New Train Board Updated.Pic Clicked- SelfDate-16-07-2018 20:31
×

14702/Amrapur Aravali Express

BDTS/Mumbai Bandra Terminus


33935 views
19

19707-19708 Bandra Terminus-Jaipur Amrapur Aravali Express New Train Board Updated.Pic Clicked- SelfDate-16-07-2018 20:31
×

14702/Amrapur Aravali Express


9356 views
0

Amarapur aravali Exp At Surat.
×

14702/Amrapur Aravali Express

BVI/Borivali


170735 views
3

Food on call . At BORIVALI stsn Just call the. no . and the 🌯food will come on your train .Lunch and dinner are of good quality ,(not like of PC food of train) The price for single plate is ₹160 .it includes * Rice 🍚* Dal 🥗* sweet (gulab jamun) * Veg Sabji (2 units)🥗* chhapati (4 -6 units) 🌯* kacchori (2 units * Buttermilk 🥛* Salad 🍅* packet of pickle * sachet of Mukwaas. * Water (250 ml) sometimes ..💧
×

14702/Amrapur Aravali Express

BVI/Borivali


170735 views
3

Food on call . At BORIVALI stsn Just call the. no . and the 🌯food will come on your train .Lunch and dinner are of good quality ,(not like of PC food of train) The price for single plate is ₹160 .it includes * Rice 🍚* Dal 🥗* sweet (gulab jamun) * Veg Sabji (2 units)🥗* chhapati (4 -6 units) 🌯* kacchori (2 units * Buttermilk 🥛* Salad 🍅* packet of pickle * sachet of Mukwaas. * Water (250 ml) sometimes ..💧
×

14702/Amrapur Aravali Express

BNS/Banas

BGKT/WDP-4D/40184


17444 views
16

-------------------------------------------------- -------------------------------------------------- -------Yesteray I captured 19707 Amrapur Aravali Express curving at Banas Railway Station of AII Division, NWR with BGKT WDP 4D 40184-------------------------------------------------- -------------------------------------------------- -------Also Maula Ali (MLY) transferred ABR WDG 3A 14701 in orange livery running light towards ABR-------------------------------------------------- -------------------------------------------------- -------#sksfex
×

14702/Amrapur Aravali Express

BNS/Banas

BGKT/WDP-4D/40184


17444 views
16

-------------------------------------------------- -------------------------------------------------- -------Yesteray I captured 19707 Amrapur Aravali Express curving at Banas Railway Station of AII Division, NWR with BGKT WDP 4D 40184-------------------------------------------------- -------------------------------------------------- -------Also Maula Ali (MLY) transferred ABR WDG 3A 14701 in orange livery running light towards ABR-------------------------------------------------- -------------------------------------------------- -------#sksfex
×

14702/Amrapur Aravali Express

BNS/Banas

BGKT/WDP-4D/40184


17444 views
16

-------------------------------------------------- -------------------------------------------------- -------Yesteray I captured 19707 Amrapur Aravali Express curving at Banas Railway Station of AII Division, NWR with BGKT WDP 4D 40184-------------------------------------------------- -------------------------------------------------- -------Also Maula Ali (MLY) transferred ABR WDG 3A 14701 in orange livery running light towards ABR-------------------------------------------------- -------------------------------------------------- -------#sksfex
×

14702/Amrapur Aravali Express

BNS/Banas

BGKT/WDP-4D/40184


17444 views
16

-------------------------------------------------- -------------------------------------------------- -------Yesteray I captured 19707 Amrapur Aravali Express curving at Banas Railway Station of AII Division, NWR with BGKT WDP 4D 40184-------------------------------------------------- -------------------------------------------------- -------Also Maula Ali (MLY) transferred ABR WDG 3A 14701 in orange livery running light towards ABR-------------------------------------------------- -------------------------------------------------- -------#sksfex
×

14702/Amrapur Aravali Express

BNS/Banas

BGKT/WDP-4D/40184


17444 views
16

-------------------------------------------------- -------------------------------------------------- -------Yesteray I captured 19707 Amrapur Aravali Express curving at Banas Railway Station of AII Division, NWR with BGKT WDP 4D 40184-------------------------------------------------- -------------------------------------------------- -------Also Maula Ali (MLY) transferred ABR WDG 3A 14701 in orange livery running light towards ABR-------------------------------------------------- -------------------------------------------------- -------#sksfex
×

14702/Amrapur Aravali Express

BNS/Banas

BGKT/WDP-4D/40184


17444 views
16

-------------------------------------------------- -------------------------------------------------- -------Yesteray I captured 19707 Amrapur Aravali Express curving at Banas Railway Station of AII Division, NWR with BGKT WDP 4D 40184-------------------------------------------------- -------------------------------------------------- -------Also Maula Ali (MLY) transferred ABR WDG 3A 14701 in orange livery running light towards ABR-------------------------------------------------- -------------------------------------------------- -------#sksfex
×

14702/Amrapur Aravali Express


16008 views
9

19707-19708 Bandra Terminus - Jaipur Aravali Express Train Name Has Changed To Amrapur Aravali ExpressSource= #Twitter
×

14702/Amrapur Aravali Express

BDTS/Mumbai Bandra Terminus


23741 views
19

19707-08 Bandra Terminus - Jaipur Aravali Express Train Name Changed To Amrapur Aravali Express
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


17023 views
18

🔹 update of #WDFC and doubling { UNJHA - Sirohi Road }1. GL post UNJHA station2. RuB set up3. Flat Ground , ready for track laying4-5. OHE and wires at Chitrasani6-7. Direct layed track on transit with an Alco moving towards Palanpur side 8. Abu Road Pf#19. Bridge construction at Abu Road outer10. Luniyapura Bridge no. 793 (ABR) outer under construction11. Track layed between ABR outer bridge and Morthala outer bridge12. GL near Morthala 13-14 minor bridge construction15-17 intermediate track layed ,GL going on , JCB doing its Job18-24. Major Bridge construction at Morthala outer (full height)25. immediately...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express

SBIB/Sabarmati BG


37512 views
31

update of Ahmedabad - Mahesana #GC 1. old MG track at Sabarmati PF2. electrification done at SBI3-4. MG train5.laying of sleeper for BG track6-7. Mahesana - taranga hill Old MG train (MG track are still seen)8. BG sleeper laying Work in progress9-12. Ground levelling going on (ARAVALI exp on A Deep curve )13-14. BG track layed in Chandkhera rd - Khodiyar stretch15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)16. electrification @ Kalol OHE are not High rise.17. MG sleeper near Jhulasan , Pansar Station.18-22.GL Near Dangarwa (Pre and post station)23. scene near Dangarwa station24-26 Old MG...
×

14702/Amrapur Aravali Express


7089 views
4

#WDFC work in progress Post UNJHA , towards Ajmer side
×

14702/Amrapur Aravali Express


7089 views
4

#WDFC work in progress Post UNJHA , towards Ajmer side
×

14702/Amrapur Aravali Express


7089 views
4

#WDFC work in progress Post UNJHA , towards Ajmer side
×

14702/Amrapur Aravali Express


4257 views
0

Sabarmati vicinity
×

14702/Amrapur Aravali Express


4299 views
0

Ahmedabad jn pf#1
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy