Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

NTES is the salt of Railfanning. IRI is the sugar. - Kirti Solanki

Search Gallery
Post PNR
Description/Uses/Merits of this ΣChain
CONNECTING TRAIN

24118/Σ BOMBAY-GADAG-ARSIKERE EXPRESS ΣChain


Created: Mar 08 2018 (18:49) by mohammed

Change Departure Station:
Change Arrival Station:

00
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 101 to 125 of 279 Pic/Video Blogs  <<prev  next>>

16536/Gol Gumbaz Express

SUR/Solapur


20224 views
11

Radium based brand new train boards for Mysore Express.Mysore Division always provides clean and clear TBs.Yesterday arrived 45 mins before time at Hotgi, after Nagarcoil - Mumbai & Chennai - Ahemadabad overtook at Hotgi this train arrived Solapur on PF2.
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


14955 views
9

Pic 1 - The submerged part of Bagalkot city. It was submerged during the floods and the backwaters of R. Krishna submerged some part of the city. People were rehabilitated to the new part called Navanagar, which recently got a station too.-The train reached BGK at around 9:20. 25 mins before time. Then the most unusual thing happened; it left before time at 9:40, 10 mins BT!Water filling is done at BJP, not here.-The speed after BGK was given 75. On the right the new line to Khajjidoni ran parallel till Navanagar halt. This line is connected to only...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


12966 views
10

BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.-The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.-Wandal seems to be the ballast depot on this line.-BSRX - Basavana Bagewadi town is some 20 Kms from...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


9010 views
13

Kudgi-This is one of the most interesting stations I have seen.The way they have overcome the non-availability of land by constructing the operations building on top of stilts with a railway line passing under it.-The line to the plant comes on the left where some new work is going on. Then comes the operations building with many loops for freights. The signalling is done from the top.Then there is a loop for passing. Imported WDP4 with GG is seen taking the mainline and crosses.-Then comes the actual station. Well, not exactly a station. Just a small ticket counter on...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


11788 views
11

Till Vijayapura there is just land levelling and few Kms of track laid. After the station there is an old fort like wall, then other impediments which will take time and MNL - JML section which is target for this year, is doubtful. And No work was seen in this section.-Many stations have got 2nd PF, some of which are in pics and I saw, which I have updated. Once they lay track, then the old PF line needs to be replaced too. So will take time. Some station buildings were under construction.-Doni river Pillars are done. -The train easily...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


10310 views
9

Nimbal - Vijayapura Outer.--Till Minchnal doubling is completed. After that only inbetween for a small distance track has been laid. Rest just ballast has been spread or sleepers placed.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


8071 views
12

Indi Road--This is one of the best developments due to doubling - that this taluk's station has got a new life. 3 high level PFs and the home PF being extended. The flyover over the station was nearing completion with the launching of girders by 2 massive cranes. Was taking the SB pics so couldn't take better pics.A P-Way maintenance vehicle can be seen.Hope the Mumbai train gets a halt in the future.-@ Moderator,Please come up with a better mechanism. Effort is taken to keep seeing on either side of the track to see new PFs and noted...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


3500 views
12

Hotgi to Indi Road outer.--The first two pics are the Hotgi bypass line coming from Kalaburagi end and joining the line towards Gadag. It's a single line.-There is a line coming from Kalaburagi side which directly goes to Hotgi plant under the Hotgi Gadag line. The bridge end can be seen in pic 3.-All the stations have new PF being built with 2 mainlines and also the station building under construction. Land levelling is done at most parts, but since the target is not this year, no work is done.-LachyanAt Lachyan too, you can see the 2 PFs are...
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

IDR/Indi Road


119771 views
30

Gadag - Hotgi Doubling updates.--Bhima River bridge-The approach and after the bridge, the land levelling work is done. The pillars of the bridge have been constructed. Girders launching - the toughest part - is yet to start.From the size it looks like it will be a double line bridge.Some work is going on at one end, but since this section is not for this year not much pace.-There are other works related to stations going on in this section, which I will post in subsequent blogs.-
×

11139/Mumbai CSMT - Hosapete SF Express

GDG/Gadag Junction


19661 views
16

Mumbai CSMT - Gadag (Mini Siddheshwar) Express will be getting LHB coaches w.e.f. 10 Sep 2018.
×

11139/Mumbai CSMT - Hosapete SF Express

SUR/Solapur


25277 views
18

With 11139 Mumbai Csmt -Solapur -Bijapur-Gadag Express Rake Coach Resting Yard At Solapur Station.. Gold Pic Taking ..
×

11139/Mumbai CSMT - Hosapete SF Express

SUR/Solapur


25277 views
18

With 11139 Mumbai Csmt -Solapur -Bijapur-Gadag Express Rake Coach Resting Yard At Solapur Station.. Gold Pic Taking ..
×

11139/Mumbai CSMT - Hosapete SF Express

SUR/Solapur


25277 views
18

With 11139 Mumbai Csmt -Solapur -Bijapur-Gadag Express Rake Coach Resting Yard At Solapur Station.. Gold Pic Taking ..
×

11139/Mumbai CSMT - Hosapete SF Express

SUR/Solapur


25277 views
18

With 11139 Mumbai Csmt -Solapur -Bijapur-Gadag Express Rake Coach Resting Yard At Solapur Station.. Gold Pic Taking ..
×

16536/Gol Gumbaz Express

HHL/Hirehalli

UBL/WDP-4/20009


18307 views
6

UBL WDP-4 20009 cruising towards Dobbspet with 16536 Solapur - Mysore Golgumbaz Express...
×

16536/Gol Gumbaz Express

YPR/Yesvantpur Junction


24876 views
10

In the past.. Press Release by CR for inaugural run of GolGumbaj Express.Why it is slowed down by 2 hrs 30 mins as compared to 2009 TT. Ideally it should be speeded after 9 years of service.
×

17326/Vishwamanava Express

NYH/Nayandahalli


30653 views
2

Gol Gumbaz Meet VISHWAMANAVA EXPRESS While Skipping Nayandahalli & Jnana Bharati Halt.Video Link: click here
×

11139/Mumbai CSMT - Hosapete SF Express


7186 views
3

New paper coverage for 11139/11140 new direct train to Mumbai from Gadag, Bagalkot & Vijayapur
×

11139/Mumbai CSMT - Hosapete SF Express


7186 views
3

New paper coverage for 11139/11140 new direct train to Mumbai from Gadag, Bagalkot & Vijayapur
×

11139/Mumbai CSMT - Hosapete SF Express


7186 views
3

New paper coverage for 11139/11140 new direct train to Mumbai from Gadag, Bagalkot & Vijayapur
×

11139/Mumbai CSMT - Hosapete SF Express

BJP/Vijayapura (Bijapur)


13185 views
8

Newly extended train at Vijayapura.Link : click hereCredits to Mr. Ashok Hallur.
×

11139/Mumbai CSMT - Hosapete SF Express


14895 views
8

Name board of 11139/11140
×

11139/Mumbai CSMT - Hosapete SF Express

GDG/Gadag Junction


5675 views
2

Extension
×

11139/Mumbai CSMT - Hosapete SF Express

GDG/Gadag Junction


5675 views
2

Extension
×

11140/Hosapete - Mumbai CSMT SF Express

GDG/Gadag Junction


39526 views
17

Solapur Division sent proposal to add extra 6 coaches to Gadag - Mumbai Express permanently. This will really helps to all passengers. Increase in number of coaches will be decided based on platform availability at CSTM.Source - Divya Marathi, Solapur
×

11139/Mumbai CSMT - Hosapete SF Express

GDG/Gadag Junction


11207 views
2

Updated TT
×

11139/Mumbai CSMT - Hosapete SF Express

GDG/Gadag Junction


21276 views
5

New Train - 11139 / 11140 - Gadag Jn. - Mumbai CSTM - Gadag Via Bagalkot with effect from 16.05.2018 / 17.05.2018. Official press release awaited. Source: click here
×

11139/Mumbai CSMT - Hosapete SF Express

GDG/Gadag Junction


21276 views
5

New Train - 11139 / 11140 - Gadag Jn. - Mumbai CSTM - Gadag Via Bagalkot with effect from 16.05.2018 / 17.05.2018. Official press release awaited. Source: click here
×

22139X/Mumbai CSMT - Solapur SF Express


16964 views
0

Look at the copy of extension..
×

22139X/Mumbai CSMT - Solapur SF Express

GDG/Gadag Junction


12721 views
1

From 16.5.2018 22139/40 & 11139/40 2 in 1 train Mini Siddeswara and Mini Mini Siddeswara will be running
×

22139X/Mumbai CSMT - Solapur SF Express

GDG/Gadag Junction


39164 views
21

This train's extension (to Gadag) notification is gonna be issued shortly.Source:click hereclick here click hereAlso ref: /blog/post/3181497 Notification from SWR: click here
×

22139X/Mumbai CSMT - Solapur SF Express

GDG/Gadag Junction


39164 views
21

This train's extension (to Gadag) notification is gonna be issued shortly.Source:click hereclick here click hereAlso ref: /blog/post/3181497 Notification from SWR: click here
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy