Will be a good alternate to sheshadri express

26500/Σ YPR-BVRT CHAIN ΣChain


Created: Nov 24 2022 (13:52) by saikarthik148~

Change Departure Station:
Change Arrival Station:

00
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 51 to 75 of 202 Pic/Video Blogs  <<prev  next>>

17212/Kondaveedu Express

NDL/Nandyal Junction


21403 views
14

17212 - Yeswantpur - Machilipatnam Kondaveedu Express was spotted at Nandyal Junction on #April11th2019⏺️This train was hauled by WAP-4/BZA - #WAP4BZA⏺️Small TBsPictures source: Self
×

17212/Kondaveedu Express

NDL/Nandyal Junction


21403 views
14

17212 - Yeswantpur - Machilipatnam Kondaveedu Express was spotted at Nandyal Junction on #April11th2019⏺️This train was hauled by WAP-4/BZA - #WAP4BZA⏺️Small TBsPictures source: Self
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)

NZB/Nizamabad Junction


11331 views
0

Late running Nagarsol Narsapur Express roaring on Nizamabad Secunderabad section.
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


16437 views
0

Doubling works after bza carving in to bvrt loop
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


16437 views
0

Doubling works after bza carving in to bvrt loop
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


16437 views
0

Doubling works after bza carving in to bvrt loop
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


16437 views
0

Doubling works after bza carving in to bvrt loop
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


14876 views
0

Same loco came all the way coupled other side
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


16465 views
0

Ratnachal WAP7
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


8293 views
0

#TB 99 made coach and worst
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


12986 views
0

large TB
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


8899 views
2

#TB update for 17255/56, 17213/14, 17231/32
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


8663 views
0

SC SKZR. Ice pm at sc
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


8663 views
0

SC SKZR. Ice pm at sc
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


8547 views
3

GY WDP 4D 40118 in charge from SC to BZA
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


8777 views
0

Trip Start Date: Tue Mar 19, 2019.
×

17231/Narasapur - Nagarsol Express (Via Guntur)


40820 views
1

#TB Source WhatsApp Group
×

17212/Kondaveedu Express


17376 views
2

#TBupdate Pic Source : Self.
×

17212/Kondaveedu Express

MKL/Makalidurga


5314 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


5314 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


5314 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


11173 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11173 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11173 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11173 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11173 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11173 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11173 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11173 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


8603 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8603 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8603 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8603 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8603 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8603 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


3986 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3986 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3986 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3986 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3986 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


3986 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61694 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express


2782 views
1

Departed...ET 22883 P4
×

17212/Kondaveedu Express


2128 views
0

18464 Prashanti with 22323 OR BZA
×

17212/Kondaveedu Express

YPR/Yesvantpur Junction


5775 views
8

at yesvantpur
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


16147 views
0

Gnt sc SF 12705 with 17 made coach of lhb..on pf 7
×

12788/Nagarsol - Narasapur Superfast Express (Via Warangal)


4499 views
3

Gy WDP 4d 40133 Leading with 17214 nsl ns exp taking curve after departing Nanded.
×

17212/Kondaveedu Express

ORH/Oddarahalli

BZA/WAP-4/22592


14719 views
19

BZA WAP-4 22592 cruising through mainline of Oddarahalli with 17212 Yeshvantapur - Machilipatnam Kondaveedu Express...
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy