Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

कोशी की जीवन रेखा — मानसी सहरसा रेलखंड - Prabhat Sharan

Search Gallery
Post PNR
Description/Uses/Merits of this ΣChain
chain Connectivity B/W VSKP -SC

746/Σ Visakhapatnam-Secunderabad ΣChain


Created: Jan 05 2012 (21:13) by Amarnadh Varma~

Change Departure Station:
Change Arrival Station:

22
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 1 to 25 of 161 Pic/Video Blogs  next>>

17488/Tirumala Express


15782 views
6

Renumbering of Tirumala Express has been cancelled. Bus this was justified as train was transferred to ECoRHope so they cancel other renumbering too
×

17488/Tirumala Express

VSKP/Visakhapatnam Junction


20305 views
5

Renumbering of tirumala cancelled, sc cct kcg composition,, replacement of 2 ac coaches with general in jsme smvb jsme.
×

17488/Tirumala Express

VSKP/Visakhapatnam Junction


20305 views
5

Renumbering of tirumala cancelled, sc cct kcg composition,, replacement of 2 ac coaches with general in jsme smvb jsme.
×

17488/Tirumala Express

VSKP/Visakhapatnam Junction


20305 views
5

Renumbering of tirumala cancelled, sc cct kcg composition,, replacement of 2 ac coaches with general in jsme smvb jsme.
×

17488/Tirumala Express


12552 views
5

RENUMBERING OF TRAINS WITH EFFECT FROM 01.07.2024
×

17230/Sabari Express

SC/Secunderabad Junction


107230 views
7

17229/30 Secunderabad Trivandrum Ctrl Sabari Express will be running with LHB coaches soon. SCR has alloted 5 LHB set of rakes to 12763/64 and 12731/32 Tirupati Secunderabad SF and Padmavathi SF Exp for conversion. Official notification will be released soon. Rake Sharing Arrangement (RSA) will be existed same and timings will be same.ARP is under suspension i.e 03/10/2024 from, there is a chance of getting LHB earlier too.
×

12797/Venkatadri SF Express

KCG/Kacheguda


154586 views
13

49 𝐲𝐞𝐚𝐫𝐬 𝐬𝐩𝐥 𝐠𝐢𝐟𝐭 𝐟𝐫𝐨𝐦 𝐒𝐂𝐑 𝐭𝐨 𝐕𝐞𝐧𝐤𝐚𝐭𝐚𝐝𝐫𝐢 𝐒𝐅 𝐄𝐱𝐩12797/98 are under suspension from "18𝐭𝐡 𝐒𝐞𝐩𝐭 2024" and expected to run with LHB Coaches the prestigious train of SCR is finally to be LHB
×

12797/Venkatadri SF Express

KCG/Kacheguda


154586 views
13

49 𝐲𝐞𝐚𝐫𝐬 𝐬𝐩𝐥 𝐠𝐢𝐟𝐭 𝐟𝐫𝐨𝐦 𝐒𝐂𝐑 𝐭𝐨 𝐕𝐞𝐧𝐤𝐚𝐭𝐚𝐝𝐫𝐢 𝐒𝐅 𝐄𝐱𝐩12797/98 are under suspension from "18𝐭𝐡 𝐒𝐞𝐩𝐭 2024" and expected to run with LHB Coaches the prestigious train of SCR is finally to be LHB
×

17488/Tirumala Express


55636 views
3

Additional temporary postal accomodation and cancellation of trains.
×

17488/Tirumala Express


55636 views
3

Additional temporary postal accomodation and cancellation of trains.
×

17488/Tirumala Express


55636 views
3

Additional temporary postal accomodation and cancellation of trains.
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

12763/Padmavathi SF Express

CHZ/Charlapalli


42461 views
14

One Lhb sleeper coach earmarked for padmavati stabled at chz along with few lhb sleeper coaches earmarked for mahalakshmi exp, falaknuma exp. New platforms are commissioned at chz and all these pf have dead end towards sc side. Connections to pitlines and IOH shed are pending. Construction of station building takes some more time. Road connectivity is very poor to this new terminal congested roads and will be challenging how are they going to sort out this issue. Total 9 platforms out of which 2 are dedicated for mmts trains, 3 for trains having halts at chz towards sc /...
×

17230/Sabari Express

SC/Secunderabad Junction


285361 views
6

Finally LHB for sabari with same RSA and Speedup is expected..!
×

SC/Secunderabad Junction


204576 views
5

Updated TT For 12734 LPI TPTY Narayanadri Exp to depart LPI 1 hr late (i.e- 18:25) W.E.F- 16/12/23 because of less layover time at LPI of its RSA with Devagiri Exp.12764 Padmavathi express slowed by 20 min to reach TPTY- 07:15SC-MUGR-SC to follow same RSA pattern Simhapuri To run with Revised CC W.E.F 13th Dec 2023Falaknuma 1st LHB run with New RSA with the Revised and updated CC W.E.F 15th Dec 2023IDK why SCR is so lazy in releasing the PRs now Ajanta express PR is not issued yet ,need to wait till 15th or 16th for its Terminal...
×

SC/Secunderabad Junction


204576 views
5

Updated TT For 12734 LPI TPTY Narayanadri Exp to depart LPI 1 hr late (i.e- 18:25) W.E.F- 16/12/23 because of less layover time at LPI of its RSA with Devagiri Exp.12764 Padmavathi express slowed by 20 min to reach TPTY- 07:15SC-MUGR-SC to follow same RSA pattern Simhapuri To run with Revised CC W.E.F 13th Dec 2023Falaknuma 1st LHB run with New RSA with the Revised and updated CC W.E.F 15th Dec 2023IDK why SCR is so lazy in releasing the PRs now Ajanta express PR is not issued yet ,need to wait till 15th or 16th for its Terminal...
×

59404 views
0

@VSKP   5m early@VSKP: Visakhapatnam Jn &0 km/h #17488: Tirumala Express left pf 5
×

59404 views
0

@VSKP   5m early@VSKP: Visakhapatnam Jn &0 km/h #17488: Tirumala Express left pf 5
×

17488/Tirumala Express

RJY/Rajahmundry


68990 views
0

Rjy 1715/20 Vja 2015/25 as per irctc TT
×

17488/Tirumala Express

HX/Kadapa Junction (Cuddapah)


74823 views
0

Lallaguda/LGD WAP7 #30298 incharge of #17488 Visakhapatnam-Kadapa/VSKP-HX Tirumala Express shifting from down line to up i.e., from Platform 03 mainline to 01 of Loop line at its destination Kadapa/HX railway station on a lite downpour morning ♥️💫
×

12763/Padmavathi SF Express

TPTY/Tirupati


37625 views
0

I got this inf from. Pic
×

17488/Tirumala Express


60331 views
0

🚨Alert 🚨17488/87 Visakhapatnam - Tirupati - Cuddapah - Tirupati - Visakhapatnam Tirumala Express To Skip Stoppage At Tirupati Railway Station For 30 Days Passengers Kindly Plan Your Journey Accordingly Source: @Visakhapatnamjn
×

12763/Padmavathi SF Express

MDR/Madhira


36567 views
1

Additional stoppage
×

17644/Circar Express

NLR/Nellore


139035 views
3

Nellore Railway Station Upgradation Works Move on Brisk PaceFoundation & Concreting work on both East & West side of the station building is completed. Work for construction of Air Concourse & COP across all platforms is progressing swiftly.
×

17644/Circar Express

NLR/Nellore


139035 views
3

Nellore Railway Station Upgradation Works Move on Brisk PaceFoundation & Concreting work on both East & West side of the station building is completed. Work for construction of Air Concourse & COP across all platforms is progressing swiftly.
×

17644/Circar Express

NLR/Nellore


139035 views
3

Nellore Railway Station Upgradation Works Move on Brisk PaceFoundation & Concreting work on both East & West side of the station building is completed. Work for construction of Air Concourse & COP across all platforms is progressing swiftly.
×

17644/Circar Express

NLR/Nellore


139035 views
3

Nellore Railway Station Upgradation Works Move on Brisk PaceFoundation & Concreting work on both East & West side of the station building is completed. Work for construction of Air Concourse & COP across all platforms is progressing swiftly.
×

17488/Tirumala Express

HX/Kadapa Junction (Cuddapah)


73967 views
11

42 years to Vijayawada/BZA electric loco shed ♥️In frame Vijayawada/BZA WAP7 #30602 in zero velocity powered #17488 Visakhapatnam-Kadapa/VSKP-HX Tirumala Express at its Destination Kadapa/HX✨
×

17488/Tirumala Express


47416 views
1

Tirupati vellali ante mundu gurthocchedi Tirumala Express ne... 🥳🥳To mark the occasion @DRMWaltairECoR Anup Satpathy Ji decided to Permanently Augment the Legendary train with one First Class AC Coach. Train will now run with maximum capacity of 22 Coaches.Thank you DRM Sir.Credits : @visakhapatnamjn
×

17488/Tirumala Express


39236 views
1

Now avail the facility of FIRST AC Class in Korba Express & Tirumala Express.18518/17 VSKP-KRBA-VSKPfrom VSKP : 07/04/2023from KRBA : 08/04/202317488/87 VSKP-HX-VSKPfrom VSKP : 09/04/2023from HX : 10/04/2023Source: @Visakhapatnamjn
×

17488/Tirumala Express


45561 views
4

Permanent Augmentation
×

12270/Hazrat Nizamuddin - MGR Chennai Central Duronto Express

BZA/Vijayawada Junction


125536 views
11

Parallel Departure and overtake of 12270 Duranto Express by 17488 Tirumala Express from Vijaywada
×

12270/Hazrat Nizamuddin - MGR Chennai Central Duronto Express

BZA/Vijayawada Junction


125536 views
11

Parallel Departure and overtake of 12270 Duranto Express by 17488 Tirumala Express from Vijaywada
×

12270/Hazrat Nizamuddin - MGR Chennai Central Duronto Express

BZA/Vijayawada Junction


125536 views
11

Parallel Departure and overtake of 12270 Duranto Express by 17488 Tirumala Express from Vijaywada
×

12270/Hazrat Nizamuddin - MGR Chennai Central Duronto Express

BZA/Vijayawada Junction


125536 views
11

Parallel Departure and overtake of 12270 Duranto Express by 17488 Tirumala Express from Vijaywada
×

12270/Hazrat Nizamuddin - MGR Chennai Central Duronto Express

BZA/Vijayawada Junction


125536 views
11

Parallel Departure and overtake of 12270 Duranto Express by 17488 Tirumala Express from Vijaywada
×

38920 views
2

@SC   2h 39m late@SC: Secunderabad Jn &1 km/h My Valentine #12763: Padmavathi SF Express
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy