Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Uttarbanga Exp: উত্তরের আত্মার আত্মীয় - Avinaba Bose

Search Gallery
Post PNR
Description/Uses/Merits of this ΣChain
via chennai

8162/Σ navjeevan link express ΣChain


Created: Sep 03 2012 (00:22) by Paralleluniverse~

Change Departure Station:
Change Arrival Station:

02
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 51 to 75 of 298 Pic/Video Blogs  <<prev  next>>

12601/MGR Chennai Central - Mangaluru Central Mail


20447 views
1

Pic 1 is summary of: Pic 2-Madras Rail 1861, Pic 3/4-Madras Rail 1864, Pic 5/6/7- MAS-Beypore/NGT 1868Beypore Mail started as GD (1,2 Class Attached/Detached at SA). Ord Dep MAS at 6:15 & CBE Dep at 7:30 Dep served as only Ordinary Mail Service till 1865. Past JTJ-BNC connection, GD was converted into Ordinary (not till 1864) with multi through Coach as illustrated in Pic 1.1. MAS-CBE/Beypore: Detach "HX Through" at AJJ, Detach "SBC Through" at JTJ, Attach "SBC-CBE Island Through" at JTJ, Attach 3 Cl at SA, Detach "NGT Through" at ED (Island Forerunner was attached to SBC Mail Forerunner in...
×

12601/MGR Chennai Central - Mangaluru Central Mail


20447 views
1

Pic 1 is summary of: Pic 2-Madras Rail 1861, Pic 3/4-Madras Rail 1864, Pic 5/6/7- MAS-Beypore/NGT 1868Beypore Mail started as GD (1,2 Class Attached/Detached at SA). Ord Dep MAS at 6:15 & CBE Dep at 7:30 Dep served as only Ordinary Mail Service till 1865. Past JTJ-BNC connection, GD was converted into Ordinary (not till 1864) with multi through Coach as illustrated in Pic 1.1. MAS-CBE/Beypore: Detach "HX Through" at AJJ, Detach "SBC Through" at JTJ, Attach "SBC-CBE Island Through" at JTJ, Attach 3 Cl at SA, Detach "NGT Through" at ED (Island Forerunner was attached to SBC Mail Forerunner in...
×

12601/MGR Chennai Central - Mangaluru Central Mail


20447 views
1

Pic 1 is summary of: Pic 2-Madras Rail 1861, Pic 3/4-Madras Rail 1864, Pic 5/6/7- MAS-Beypore/NGT 1868Beypore Mail started as GD (1,2 Class Attached/Detached at SA). Ord Dep MAS at 6:15 & CBE Dep at 7:30 Dep served as only Ordinary Mail Service till 1865. Past JTJ-BNC connection, GD was converted into Ordinary (not till 1864) with multi through Coach as illustrated in Pic 1.1. MAS-CBE/Beypore: Detach "HX Through" at AJJ, Detach "SBC Through" at JTJ, Attach "SBC-CBE Island Through" at JTJ, Attach 3 Cl at SA, Detach "NGT Through" at ED (Island Forerunner was attached to SBC Mail Forerunner in...
×

12601/MGR Chennai Central - Mangaluru Central Mail


20447 views
1

Pic 1 is summary of: Pic 2-Madras Rail 1861, Pic 3/4-Madras Rail 1864, Pic 5/6/7- MAS-Beypore/NGT 1868Beypore Mail started as GD (1,2 Class Attached/Detached at SA). Ord Dep MAS at 6:15 & CBE Dep at 7:30 Dep served as only Ordinary Mail Service till 1865. Past JTJ-BNC connection, GD was converted into Ordinary (not till 1864) with multi through Coach as illustrated in Pic 1.1. MAS-CBE/Beypore: Detach "HX Through" at AJJ, Detach "SBC Through" at JTJ, Attach "SBC-CBE Island Through" at JTJ, Attach 3 Cl at SA, Detach "NGT Through" at ED (Island Forerunner was attached to SBC Mail Forerunner in...
×

12601/MGR Chennai Central - Mangaluru Central Mail


20447 views
1

Pic 1 is summary of: Pic 2-Madras Rail 1861, Pic 3/4-Madras Rail 1864, Pic 5/6/7- MAS-Beypore/NGT 1868Beypore Mail started as GD (1,2 Class Attached/Detached at SA). Ord Dep MAS at 6:15 & CBE Dep at 7:30 Dep served as only Ordinary Mail Service till 1865. Past JTJ-BNC connection, GD was converted into Ordinary (not till 1864) with multi through Coach as illustrated in Pic 1.1. MAS-CBE/Beypore: Detach "HX Through" at AJJ, Detach "SBC Through" at JTJ, Attach "SBC-CBE Island Through" at JTJ, Attach 3 Cl at SA, Detach "NGT Through" at ED (Island Forerunner was attached to SBC Mail Forerunner in...
×

12601/MGR Chennai Central - Mangaluru Central Mail


20447 views
1

Pic 1 is summary of: Pic 2-Madras Rail 1861, Pic 3/4-Madras Rail 1864, Pic 5/6/7- MAS-Beypore/NGT 1868Beypore Mail started as GD (1,2 Class Attached/Detached at SA). Ord Dep MAS at 6:15 & CBE Dep at 7:30 Dep served as only Ordinary Mail Service till 1865. Past JTJ-BNC connection, GD was converted into Ordinary (not till 1864) with multi through Coach as illustrated in Pic 1.1. MAS-CBE/Beypore: Detach "HX Through" at AJJ, Detach "SBC Through" at JTJ, Attach "SBC-CBE Island Through" at JTJ, Attach 3 Cl at SA, Detach "NGT Through" at ED (Island Forerunner was attached to SBC Mail Forerunner in...
×

12601/MGR Chennai Central - Mangaluru Central Mail


19229 views
1

13 Mail to 13 Malabar Exp to 19 Madras Cochin Exp.As per schedule i don't have slightest doubt that Mangalore Mail been the last of the stock, emerged out anytime past June 1944. 13 Malabar Express become 19 Madras Cochin Exp & new connection named 1 MAS-MAQ Mail emerged out.I request you to kindly provide any evidence to counter failing which Inaugural Date of MAQ Mail will be corrected. Malabar Exp/TVC Mail will be tackled separately.
×

12601/MGR Chennai Central - Mangaluru Central Mail


22221 views
2

click here Post by Mr. DSP Anirudh aka TheMadrasMail . Pic 1: April 14 1862: Governer Special Train MAS-Beypore click here May 12 1862: SGE-PTJ Section open. 30 June 1862: 312 Miles Open for Traffic (MAS-CBE:301 Miles, MAS-Beypore: 407 Miles)Pic 2-3: Dec 1864: One MAS-CBE train reach CBE at Night & PTJ-Beypore departs morning from PTJ!! No through Train/Coach in MAS-Baypore!!Pic 4-5: 1875 No Mail Service in MAS-SBC/Beypore Section (MAS-Bombay Mail pioneered Mail Service in MR). 1889 Mail exist (Beypore-CLT opened in 5 March 1888)I need to understand if Line Opening day is marked as opening day for Mail or...
×

12601/MGR Chennai Central - Mangaluru Central Mail


22221 views
2

click here Post by Mr. DSP Anirudh aka TheMadrasMail . Pic 1: April 14 1862: Governer Special Train MAS-Beypore click here May 12 1862: SGE-PTJ Section open. 30 June 1862: 312 Miles Open for Traffic (MAS-CBE:301 Miles, MAS-Beypore: 407 Miles)Pic 2-3: Dec 1864: One MAS-CBE train reach CBE at Night & PTJ-Beypore departs morning from PTJ!! No through Train/Coach in MAS-Baypore!!Pic 4-5: 1875 No Mail Service in MAS-SBC/Beypore Section (MAS-Bombay Mail pioneered Mail Service in MR). 1889 Mail exist (Beypore-CLT opened in 5 March 1888)I need to understand if Line Opening day is marked as opening day for Mail or...
×

12601/MGR Chennai Central - Mangaluru Central Mail


22221 views
2

click here Post by Mr. DSP Anirudh aka TheMadrasMail . Pic 1: April 14 1862: Governer Special Train MAS-Beypore click here May 12 1862: SGE-PTJ Section open. 30 June 1862: 312 Miles Open for Traffic (MAS-CBE:301 Miles, MAS-Beypore: 407 Miles)Pic 2-3: Dec 1864: One MAS-CBE train reach CBE at Night & PTJ-Beypore departs morning from PTJ!! No through Train/Coach in MAS-Baypore!!Pic 4-5: 1875 No Mail Service in MAS-SBC/Beypore Section (MAS-Bombay Mail pioneered Mail Service in MR). 1889 Mail exist (Beypore-CLT opened in 5 March 1888)I need to understand if Line Opening day is marked as opening day for Mail or...
×

12601/MGR Chennai Central - Mangaluru Central Mail


22221 views
2

click here Post by Mr. DSP Anirudh aka TheMadrasMail . Pic 1: April 14 1862: Governer Special Train MAS-Beypore click here May 12 1862: SGE-PTJ Section open. 30 June 1862: 312 Miles Open for Traffic (MAS-CBE:301 Miles, MAS-Beypore: 407 Miles)Pic 2-3: Dec 1864: One MAS-CBE train reach CBE at Night & PTJ-Beypore departs morning from PTJ!! No through Train/Coach in MAS-Baypore!!Pic 4-5: 1875 No Mail Service in MAS-SBC/Beypore Section (MAS-Bombay Mail pioneered Mail Service in MR). 1889 Mail exist (Beypore-CLT opened in 5 March 1888)I need to understand if Line Opening day is marked as opening day for Mail or...
×

12601/MGR Chennai Central - Mangaluru Central Mail


150538 views
3

May 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!I show you non existence of Mail or Interclass Fare in Madras Railway when almost every Network had it in 1884!!If...
×

12601/MGR Chennai Central - Mangaluru Central Mail


150538 views
3

May 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!I show you non existence of Mail or Interclass Fare in Madras Railway when almost every Network had it in 1884!!If...
×

12601/MGR Chennai Central - Mangaluru Central Mail


150538 views
3

May 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!I show you non existence of Mail or Interclass Fare in Madras Railway when almost every Network had it in 1884!!If...
×

12601/MGR Chennai Central - Mangaluru Central Mail


150538 views
3

May 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!I show you non existence of Mail or Interclass Fare in Madras Railway when almost every Network had it in 1884!!If...
×

12601/MGR Chennai Central - Mangaluru Central Mail


150538 views
3

May 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!I show you non existence of Mail or Interclass Fare in Madras Railway when almost every Network had it in 1884!!If...
×

12601/MGR Chennai Central - Mangaluru Central Mail


150538 views
3

May 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!I show you non existence of Mail or Interclass Fare in Madras Railway when almost every Network had it in 1884!!If...
×

12601/MGR Chennai Central - Mangaluru Central Mail


150538 views
3

May 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!I show you non existence of Mail or Interclass Fare in Madras Railway when almost every Network had it in 1884!!If...
×

12601/MGR Chennai Central - Mangaluru Central Mail


150538 views
3

May 12 1862. Inaugural run. How? Till 30th June 1862 Madras Railway was 312 Miles, 90 Miles short of MAS-Beypore & 238 Miles shy of MAQ (Finished in 1907)!!I hope its not a presumption and there must be some train's TT as back up which you link as progression of 46 long years gap of non existence of Through Train/Coach & Rail Network!! click here Tells in 1888 at 18:00 some train DEP MAS which was forerunner to 1 MAS-MAQ Mail!!I show you non existence of Mail or Interclass Fare in Madras Railway when almost every Network had it in 1884!!If...
×

22626/KSR Bengaluru - MGR Chennai Central Double Decker Express

MAS/MGR Chennai Central


116995 views
4

Sep 2014A Quick trip to Chennai in 2014 saw me take the AC Double Decker Express. As we departed Perambur, a Vellore bound MEMU held us up at Vyasarpadi for want of a clear path; Mangaluru bound Mail crossed near Basin Bridge trip shed and finally, as we slithered into pf-2A, the Alappuzha Express was ready to depart from pf-3.Hope you enjoy this short clip.
×

12655/Navjeevan SF Express

JU/Jodhpur


205231 views
1

Yeh Sahi Hai KYa???
×

12655/Navjeevan SF Express

ADI/Ahmedabad Junction


105070 views
0

Again Navjeevan Exp extension demand to JU, BME, JSM What is your opinion? 🤔Posted thru Follow my Trip
×

12655/Navjeevan SF Express

JU/Jodhpur


50115 views
1

×

12655/Navjeevan SF Express

JU/Jodhpur


370770 views
12

Demand for extension of trains
×

12601/MGR Chennai Central - Mangaluru Central Mail

PAZ/Payangadi

RPM/WAP-7/30751


58264 views
18

Happy bday One mail...😘😍Legendary 12601 Chennai Central- Manglore Central SuperFast Mail led by RPM WAP7 #30751 slows down for its scheduled halt at Payangadi.
×

12601/MGR Chennai Central - Mangaluru Central Mail


87175 views
1

MAS-MAQ Mail & MAQ-MAS WestCoast SF New #Small_TB !
×

12655/Navjeevan SF Express

ADI/Ahmedabad Junction


30950 views
2

Tejas Effect Speedup of Navjeevan
×

12723/Telangana Express

PDPL/Peddapalli Junction


78949 views
1

Peddapelli got stoppages for Telangana, Navajeevan, Nagpur Expresses
×

12723/Telangana Express

PDPL/Peddapalli Junction


78949 views
1

Peddapelli got stoppages for Telangana, Navajeevan, Nagpur Expresses
×

12723/Telangana Express

PDPL/Peddapalli Junction


78949 views
1

Peddapelli got stoppages for Telangana, Navajeevan, Nagpur Expresses
×

12601/MGR Chennai Central - Mangaluru Central Mail

ELM/Ezhimala

RPM/WAP-7/30420


31078 views
18

Legendary 12601 Chennai Central-Manglore Central SuperFast Mail led by Customary link RPM WAP7 #30420
×

12655/Navjeevan SF Express

MAS/MGR Chennai Central

ED/WAP-4/22268


41922 views
19

SR Erode ED WAP-4 #22268 Lead By Taken Arrived 10 Mins Late Running On Standing PF No. 10 MAS.. With12655 ADI-MAS Navjeevan SF Express #TB..))
×

12655/Navjeevan SF Express

MAS/MGR Chennai Central

ED/WAP-4/22268


41922 views
19

SR Erode ED WAP-4 #22268 Lead By Taken Arrived 10 Mins Late Running On Standing PF No. 10 MAS.. With12655 ADI-MAS Navjeevan SF Express #TB..))
×

12655/Navjeevan SF Express

MAS/MGR Chennai Central

ED/WAP-4/22268


41922 views
19

SR Erode ED WAP-4 #22268 Lead By Taken Arrived 10 Mins Late Running On Standing PF No. 10 MAS.. With12655 ADI-MAS Navjeevan SF Express #TB..))
×

12655/Navjeevan SF Express

MAS/MGR Chennai Central

ED/WAP-4/22268


41922 views
19

SR Erode ED WAP-4 #22268 Lead By Taken Arrived 10 Mins Late Running On Standing PF No. 10 MAS.. With12655 ADI-MAS Navjeevan SF Express #TB..))
×

12655/Navjeevan SF Express

MAS/MGR Chennai Central

ED/WAP-4/22268


41922 views
19

SR Erode ED WAP-4 #22268 Lead By Taken Arrived 10 Mins Late Running On Standing PF No. 10 MAS.. With12655 ADI-MAS Navjeevan SF Express #TB..))
×

12655/Navjeevan SF Express

MAS/MGR Chennai Central

ED/WAP-4/22268


41922 views
19

SR Erode ED WAP-4 #22268 Lead By Taken Arrived 10 Mins Late Running On Standing PF No. 10 MAS.. With12655 ADI-MAS Navjeevan SF Express #TB..))
×

12655/Navjeevan SF Express

MAS/MGR Chennai Central

ED/WAP-4/22268


41922 views
19

SR Erode ED WAP-4 #22268 Lead By Taken Arrived 10 Mins Late Running On Standing PF No. 10 MAS.. With12655 ADI-MAS Navjeevan SF Express #TB..))
×

12655/Navjeevan SF Express

MAS/MGR Chennai Central

ED/WAP-4/22268


41922 views
19

SR Erode ED WAP-4 #22268 Lead By Taken Arrived 10 Mins Late Running On Standing PF No. 10 MAS.. With12655 ADI-MAS Navjeevan SF Express #TB..))
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy