Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

12988 - बारह नौ सौ अठासी , इसके नखरे हैं नवाबी ! - Keshav Saxena

Search Gallery
Post PNR
Description/Uses/Merits of this ΣChain
Bi-weekly

9040/Σ YPR-DMM-KCG-NED-AMI ΣChain


Created: Sep 22 2012 (10:12) by SteveRLF~

Change Departure Station:
Change Arrival Station:

08
ΣChain Tabs:

Picture & Video Gallery

Page#    Showing 26 to 50 of 200 Pic/Video Blogs  <<prev  next>>

17211/Kondaveedu Express

BZA/Vijayawada Junction


47288 views
3

My recent trip, pics capture at BZA....
×

17211/Kondaveedu Express

BZA/Vijayawada Junction


47288 views
3

My recent trip, pics capture at BZA....
×

17211/Kondaveedu Express

BZA/Vijayawada Junction


47288 views
3

My recent trip, pics capture at BZA....
×

17212/Kondaveedu Express

NRT/Narasaraopet


10687 views
0

New TT from July 1st. Speedup by 20 minutes.Departure time change at MTM 15.35 instead of 15. 15No change in TT from GY to YPR.Thanks SCoR.
×

17212/Kondaveedu Express

NRT/Narasaraopet


10687 views
0

New TT from July 1st. Speedup by 20 minutes.Departure time change at MTM 15.35 instead of 15. 15No change in TT from GY to YPR.Thanks SCoR.
×

17212/Kondaveedu Express

NDL/Nandyal Junction


21435 views
14

17212 - Yeswantpur - Machilipatnam Kondaveedu Express was spotted at Nandyal Junction on #April11th2019⏺️This train was hauled by WAP-4/BZA - #WAP4BZA⏺️Small TBsPictures source: Self
×

17212/Kondaveedu Express

NDL/Nandyal Junction


21435 views
14

17212 - Yeswantpur - Machilipatnam Kondaveedu Express was spotted at Nandyal Junction on #April11th2019⏺️This train was hauled by WAP-4/BZA - #WAP4BZA⏺️Small TBsPictures source: Self
×

12765/Tirupati - Amravati SF Express

AK/Akola Junction

GY/WDP-4D/40186


79472 views
22

Tirupati-Amravati SF Express standing at Akola with GY WDP4D 40186 after a Loco Reversal. #TB
×

12765/Tirupati - Amravati SF Express

AK/Akola Junction

GY/WDP-4D/40186


79472 views
22

Tirupati-Amravati SF Express standing at Akola with GY WDP4D 40186 after a Loco Reversal. #TB
×

12765/Tirupati - Amravati SF Express

BSX/Basar

GY/WDP-4D/40315


17132 views
10

GY WDP-4D 40315 accelerating out of loopline, to skip Basar with 12765 Tirupati - Amravati Superfast Express...
×

17212/Kondaveedu Express


17405 views
2

#TBupdate Pic Source : Self.
×

17212/Kondaveedu Express

MKL/Makalidurga


5328 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


5328 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


5328 views
6

After Dhone till Nandyal I was able to make out some land levelling work is going on.-The YA new line joins just before the Nandyala Junction cabin. So from Nandyala Jn cabin to the station a new line is to be laid this year.There is nothing there or on the Kundu river after the cabin. But after the river some distance later, the track laying has been done and it continues till the station yard.-At Nandyal I saw the DHNE GNT passenger. Short-terminated I guess. Is getting WAP 7.KRNT DEMU which was supposed to be there was nowhere to be...
×

17212/Kondaveedu Express

MKL/Makalidurga


11188 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11188 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11188 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11188 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11188 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11188 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11188 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


11188 views
6

Train with green ads - must be TPTY - KRYP Pass short terminated at DMM.-DMM onwards just land levelled, no work going on. No target for this year.-Nearing Dhone I could make out in the dark some land levelling work has started.
×

17212/Kondaveedu Express

MKL/Makalidurga


8612 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8612 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8612 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8612 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8612 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


8612 views
9

No other work is being done on other stretches as there is no target for this year. HUP PF 1 is being broadened. HUP and PKD station buildings were beautified with paintings.
×

17212/Kondaveedu Express

MKL/Makalidurga


4000 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4000 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4000 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4000 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4000 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4000 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61750 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express


2793 views
1

Departed...ET 22883 P4
×

17212/Kondaveedu Express


2149 views
0

18464 Prashanti with 22323 OR BZA
×

17212/Kondaveedu Express

YPR/Yesvantpur Junction


5791 views
8

at yesvantpur
×

17212/Kondaveedu Express

ORH/Oddarahalli

BZA/WAP-4/22592


14751 views
19

BZA WAP-4 22592 cruising through mainline of Oddarahalli with 17212 Yeshvantapur - Machilipatnam Kondaveedu Express...
×

12765/Tirupati - Amravati SF Express


3436 views
3

Melghat tiger.
×

12765/Tirupati - Amravati SF Express


2972 views
0

Maximum speed in Amravati city.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy