रेलफैनों को आता है ज़िन्दगी का मज़ा लेना Search PNRs
Main
PNR #Follows
Recent Refreshes
Recent Refresh Requests
Blank PNRs
New PNRs
Recent Predictions
Recent Stampings
Surprises
Past Un-Stamped
Today's PNRs
Today's Un-Stamped
Tomorrow's PNRs
Tomorrow's Un-Stamped
Please wait...
PNR: 281-xxxxxxx
Latest Status as of: Aug 17 2017 (01:06)
Passenger 1:
Confirmed: [MB] /MB (GN) (Booking Status:
Confirmed: [MB] )
Total Fare: 365 Chart PREPARED Show Full PNR Status History (2 statuses) Status as of: Aug 17 2017 (01:06)
Passenger 1:
Confirmed: S1/2 [MB] /MB (GN) (Booking Status:
Confirmed: S1/2 [MB] )
Total Fare: 365 Chart PREPARED Status as of: Aug 15 2017 (23:23)
Passenger 1:
Confirmed (GN) (Booking Status:
Confirmed: S1/2 [MB] )
Total Fare: 365 Chart NOT Prepared
Travel Time:
7h 50m 3 halts Distance: 479 km Avg Speed: 61 km/hr Max Permissible Speed: n/a
Type: COV-Reserved
Rake Zone: NR/Northern
Latest News (You need to double-check/verify this info yourself) Running As 04422Sun Oct 18, 2020 (08:21PM)
Bedroll/Linen :
Don't know change
Pantry/Catering ✕ Pantry Car ✕ On-board Catering ✕ E-Catering
ICF Rake
Rake/Coach Position
WARNING: Covid Special Trains are being phased out. Pl. double-check.
3 halts. 77 intermediate Stations between Anand Vihar Terminal and Lucknow Charbagh NR
12.6 km
1 intermediate stations
00:28
140.8 km
23 intermediate stations
01:55
90.3 km
15 intermediate stations
01:25
234.8 km
35 intermediate stations
03:53
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.