Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The purest enjoyment of life - be a RailFan.

Search PNRs
Post PNR

PNR: 890-xxxxxxx

PNR Forum Entry# 6057717
PREDICTIONS: confirm:7  rac:0  waitlist:0 
Journey: Sat Jun 01, 2024
Departure: VGLJ/VGL Jhansi Junction @ 01:03 PF#: 4
Arrival: CNB/Kanpur Central @ 04:40 PF#: 6
Distance: 220 km / 1424 km
Travel Time: 3h 37m  1 halts
Class: AC Economy 3-tier - 3E   |   Charting: < 17:00

Latest Status as of: Jun 01 (19:52)
Passenger 1: Cancelled: CAN (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart Prepared
refreshed by: 574484/Shalabh^~

Show Full PNR Status History (13 statuses)
Status as of: Jun 01 (19:52)
Passenger 1: Cancelled: CAN (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart Prepared
refreshed by: 574484/Shalabh^~

Status as of: May 28 (18:54)
Passenger 1: Cancelled: CAN (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 718732/Rai_abhi^~

Status as of: May 24 (18:55)
Passenger 1: Waiting: RLWL:10 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 574484/Shalabh^~

Status as of: May 22 (16:08)
Passenger 1: Waiting: RLWL:12 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1243573/Siddharth98^~

Status as of: May 22 (14:38)
Passenger 1: Waiting: RLWL:12 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1108853/Brandon12663^~

Status as of: May 20 (23:41)
Passenger 1: Waiting: RLWL:13 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1243573/Siddharth98^~

Status as of: May 18 (20:43)
Passenger 1: Waiting: RLWL:13 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1136519/BangaloreMail^~

Status as of: May 16 (22:59)
Passenger 1: Waiting: RLWL:13 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1243573/Siddharth98^~

Status as of: May 15 (22:41)
Passenger 1: Waiting: RLWL:14 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1243573/Siddharth98^~

Status as of: May 12 (09:52)
Passenger 1: Waiting: RLWL:14 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1136519/BangaloreMail^~

Status as of: May 11 (18:18)
Passenger 1: Waiting: RLWL:14 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1831952/Somanko_ELST^~

Status as of: May 09 (10:43)
Passenger 1: Waiting: RLWL:17 (Booking Status: RLWL:28:GN)
Total Fare:  555
Chart NOT Prepared
refreshed by: 1243573/Siddharth98^~

Status as of: May 09 (10:16)

Pushpak Express (PT)/12534
Other Trains in the News
This is the Shortest Route between VGLJ and CNB.
Travel Time: 3h 37m     1 halts
Distance: 220 km     Avg Speed: 61 km/hr
Max Permissible Speed: 130 km/hr between KNW/Khandwa Junction and VGLJ/VGL Jhansi Junction
Departs @ 01:03
VGL Jhansi Junction/VGLJ 
Platform# 4
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 04:40
CNB/Kanpur Ctrl 
Platform# 6
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: SuperFast
Rake Zone: NER/North Eastern
Latest News
(You need to double-check/verify this info yourself)
छत्रपति शिवाजी महाराज टर्मिनल से पहली व दो जून को चलने वाली 12534 छत्रपति शिवाजी महराज टर्मिनल-लखनऊ जंक्शन एक्सप्रेस दादर से चलाई जाएगी।
Fri May 17, 2024 (12:44PM)
News History
Trains will leave from Dadar o­n 20.11.2022 (Cancelled Between CSMT & Dadar).
Fri Nov 11, 2022 (02:40PM)
Will be regulated at Vaghli from 13:45 hrs to 14:45 hrs for JCO 12.01.2022
Wed Jan 12, 2022 (10:20AM)
LHB Rake w.e.f 01 - 11 - 2021 at CSMT end. Coach Composition (LHB Rake) :. H1-A1-A2-B1-B7-M1-M2-S1-S5-D1-D2-DLI. Total 20 coaches EOG(?)
Sun Oct 31, 2021 (09:23PM)
8 Follows
Rating: 4.2/5 (179 votes)
cleanliness - excellent (32)
punctuality - excellent (31)
food - good (27)
ticket avbl - average (30)
u/r coach - average (15)
railfanning - excellent (31)
safety - good (28)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Wed Apr 01, 1987
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is available at CSMT, KYN, IGP, NK, MMR, BSL, KNW,...
more...
ET, RKMP & BPL.
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 H1
  3
 A2
  4
 A1
  5
 M9
  6
 M8
  7
 M7
  8
 M6
  9
 M5
 18
 S2
 17
 S3
 16
 S4
 15
 S5
 14
 PC
 13
 M1
 12
 M2
 11
 M3
 10
 M4
 19
 S1
 20
 GS
 21
 GS
 22
SLR
RSA - Rake Sharing
No RSA. An ISO certified train.; 3 Rakes with PM @ LJN.

Show ALL intermediate Stations

1 halts. 29 intermediate Stations between VGL Jhansi Junction and Kanpur Central
#1
-1131.4 km
/==/
Zone: CR
PF# 15
Speed: 54
Elev: 14m

08:25
Day: 1
51.5 km
32 intermediate stations
00:47
#2
-1080.0 km
/==/
Zone: CR
PF# 4
Speed: 50
Elev: 9m
09:12
09:15
Day: 1
81.6 km
14 intermediate stations
01:37
#3
-998.4 km
/==/
Zone: CR
PF# 1
Speed: 76
Elev: 599m
10:52
10:57
Day: 1
Bankers detached
50.6 km
6 intermediate stations
00:40
#4
-947.8 km
/==/
Zone: CR
PF# 2
Speed: 83
Elev: 551m
11:37
11:40
Day: 1
73.0 km
8 intermediate stations
00:53
#5
-874.8 km
/==/
Zone: CR
PF# 2
Speed: 76
Elev: 558m
12:33
12:35
Day: 1
184.1 km
22 intermediate stations
02:25
#6
-690.7 km
/==/
Zone: CR
PF# 6
Speed: 63
Elev: 205m
15:00
15:05
Day: 1
123.6 km
19 intermediate stations
01:57
#7
-567.1 km
/==/
Zone: CR
PF# 2
Speed: 79
Elev: 302m
17:02
17:05
Day: 1
183.4 km
24 intermediate stations
02:20
#8
-383.7 km
/==/
Zone: WCR
PF# 1
Speed: 62
Elev: 329m
19:25
19:30
Day: 1
Xing with 12808/Samata Express | Mon,Tue,Thu,Fri,Sat
85.6 km
12 intermediate stations
01:23
#9
-298.1 km
/==/
Zone: WCR
PF# 3
Speed: 25
Elev: 496m
20:53
20:55
Day: 1
6.2 km
0 intermediate stations
00:15
#10
-291.8 km
/==/
Zone: WCR
PF# 2,3
Speed: 83
Elev: 405m
21:10
21:20
Day: 1
201.4 km
26 intermediate stations
02:26
#11
-90.4 km
/==/
Zone: NCR
PF# 3
Speed: 81
Elev: 369m
23:46
23:48
Day: 1
90.4 km
12 intermediate stations
01:07
#12
0.0 km
/==/
Zone: NCR
PF# 4
Speed: 91
Elev: 258m
00:55
01:03
Day: 2
113.9 km
11 intermediate stations
01:15
#13
113.9 km
/==/
Zone: NCR
PF# 1
Speed: 46
Elev: 141m
02:18
02:20
Day: 2
106.4 km
17 intermediate stations
02:20
#14
220.3 km
/==/
Zone: NCR
PF# 6
Speed: 40
Elev: 127m
04:40
04:50
Day: 2
17.6 km
2 intermediate stations
00:26
#15
237.8 km
/==/
Zone: NR
PF# 3
Speed: 29
Elev: 123m
05:16
05:18
Day: 2
54.4 km
9 intermediate stations
01:52
#16
292.3 km
/--/
Zone: NER
PF# 6

Elev: 121m
07:10

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy