Kolkata Metro: The only Metro of IR. কলকাতা মেট্রো : তিলোত্তমার জীবন রেখা ।। - PPG Search PNRs
Main
PNR #Follows
Recent Refreshes
Recent Refresh Requests
Blank PNRs
New PNRs
Recent Predictions
Recent Stampings
Surprises
Past Un-Stamped
Today's PNRs
Today's Un-Stamped
Tomorrow's PNRs
Tomorrow's Un-Stamped
Please wait...
PNR: 472-xxxxxxx
Journey: Sun Jul 07, 2024
Departure: TBM/Tambaram @ 21:00
PF#: 7
Arrival: PKT/Pattukottai @ 03:23 +1 night
PF#: 2
Distance: 371 km / 765 km
Travel Time: 6h 23m 6 halts
Class: Sleeper - SL |
Charting: < 17:00
Latest Status as of: Jun 30 (15:58)
Passenger 1:
RAC: RAC:66 (Booking Status:
WL:79:GN )
Total Fare: 265 Chart NOT Prepared refreshed by: 2182678/Harsha_12627^~ Show Full PNR Status History (6 statuses) Status as of: Jun 30 (15:58)
Passenger 1:
RAC: RAC:66 (Booking Status:
WL:79:GN )
Total Fare: 265 Chart NOT Prepared refreshed by: 2182678/Harsha_12627^~ Status as of: Jun 29 (08:13)
Passenger 1:
RAC: RAC:67 (Booking Status:
WL:79:GN )
Total Fare: 265 Chart NOT Prepared refreshed by: 2182678/Harsha_12627^~ Status as of: Jun 27 (22:35)
Passenger 1:
RAC: RAC:69 (Booking Status:
WL:79:GN )
Total Fare: 265 Chart NOT Prepared refreshed by: 1243573/Siddharth98^~ Status as of: Jun 26 (19:26)
Passenger 1:
RAC: RAC:71 (Booking Status:
WL:79:GN )
Total Fare: 265 Chart NOT Prepared refreshed by: 456446/PankajMishra^~ Status as of: Jun 25 (18:58)
Passenger 1:
RAC: RAC:71 (Booking Status:
WL:79:GN )
Total Fare: 265 Chart NOT Prepared refreshed by: 2086033/PurushottamExpress^~ Status as of: Jun 25 (18:57)
Travel Time:
6h 23m 6 halts Distance: 371 km Avg Speed: 58 km/hr Type: SuperFast
Rake Zone: SR/Southern
Latest News (You need to double-check/verify this info yourself) 🔹Train no. 20683/Tambaram - Sengottai SF Express (PT) leaving Tambaram at 21.00 hrs on 22nd, 25th and 27th February 2024 will be diverted to run via Virudunagar, Rajapalayam, Tenkasi skipping stoppages at Tirunelveli, Cheranmahadevi, Ambasamudram and Pavurchutram.Wed Feb 21, 2024 (10:53AM)
News History Coach Composition ; 5 – SL, 5 – 3E, 2 – 2A, 3 – GS, 2 – Generator Car ; Total 17 LHB CoachesThu Apr 06, 2023 (08:12PM)
Coach Composition : 5 – SL, 3 – 3E, 2 – 2A, 3 – GS, 2 – Generator Car ; Total 17 CoachesThu Apr 06, 2023 (06:25PM)
Rating: 4.5 /5 (5 votes)
cleanliness - excellent (1)
u/r coach - excellent (1)
railfanning - excellent (1)
Bedroll/Linen :
NOT Available change Inaugural Run Sat Apr 08, 2023
Pantry/Catering ✕ Pantry Car
✓ On-board Catering ✓ E-Catering
E-Catering available at TBM, VPT & TEN only.
LHB Rake
Rake/Coach Position RSA - Rake Sharing Single Dedicated LHB Rake. PM - TBM CDO.
6 halts. 71 intermediate Stations between Tambaram and Pattukottai
134.0 km
28 intermediate stations
01:58
42.7 km
7 intermediate stations
00:40
79.6 km
14 intermediate stations
01:27
38.7 km
7 intermediate stations
00:40
Loco Change From Electric to Diesel
26.0 km
6 intermediate stations
00:29
23.2 km
2 intermediate stations
00:23
26.6 km
1 intermediate stations
00:28
45.8 km
3 intermediate stations
00:48
27.3 km
3 intermediate stations
00:44
105.9 km
11 intermediate stations
01:44
21.9 km
1 intermediate stations
00:28
113.6 km
12 intermediate stations
01:35
19.1 km
2 intermediate stations
00:17
11.0 km
2 intermediate stations
00:07
Experimental Halt W.E.F 10/03/2024.
4.4 km
0 intermediate stations
00:05
27.2 km
5 intermediate stations
00:19
10.5 km
1 intermediate stations
00:18
7.9 km
0 intermediate stations
00:40
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.