Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

WAM 4 - Father of the Nation for RailFans - Vikas Kumar

Search Forum
Post PNR

KGPW/Kharagpur Workshop
खड़गपुर कारख़ाना
খড়গপুর কারখানা


Track: Triple Electric-Line

Updated: Jul 01 2020 (21:24) by SUPERMAN^~
Show ALL Trains
Number of Platforms: n/a
Number of Halting Trains: 1
Number of Originating Trains: 0
Number of Terminating Trains: 0
Unnamed Road, New Settlement, Kharagpur, Dist - Paschim Medinipur
State: West Bengal
Elevation: n/a
Type: Workshop
Category: n/a
Zone: SER/South Eastern
Division: Kharagpur
No Recent News for KGPW/Kharagpur Workshop
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Station Forum

Page#    Showing 31 to 35 of 41 blog entries  <<prev  next>>
General Travel
8310 views
2

Jan 08 2020 (11:05)   KGPW/Kharagpur Workshop
ahm33966~   4374 blog posts
Entry# 4534385            Tags   Past Edits
SER tender - private agencies in rail Workshops also
Translate to English
Translate to Hindi
General Travel
15402 views
4

Oct 01 2020 (13:20)   KGPW/Kharagpur Workshop
IlovemyINDIA~   2584 blog posts
Entry# 4730589            Tags   Past Edits
‘Every 3rd diesel loco failed in 180 days of overhauling : CAG

641 DIESEL LOCOS AND 293 ELECTRIC LOCOS FAILED WITHIN 180 DAYS OF POH.
In its latest audit report, the comptroller and auditor general of India has found that within 180 days of periodic overhauling (POH), every third diesel and every sixth electric locomotive engine failed to perform during train operations.
The
...
more...
audit was conducted for the period between 2012 and 2017, and it revealed that defective material, faulty equipment and poor inspection were the main reasons for the failure of locomotives.
In six diesel loco workshops (DLWS), 37% (641 of 1,715) engines failed within 180 days of their POH. In six electric loco workshops (ELWS), 18% (293 of 1,647) locos failed within 180 days of their POH.
The rate of failure was more than 50% for diesel locomotives overhauled in Eastern Railway (ER), North Western Railway (NWR) and South Eastern Railway (SER).
For instance, ER Jamalpur DLWS reported 57% loco failure, while SER Kharagpur DLWS reported 52% loco failure in 180 days. For electric locos, ER Kanchrapara workshop reported 37% and Northern Railway Lucknow workshop reported 35% failure. CAG claimed that defective material, faulty equipment and poor inspection were the main reasons for failure as cited by the railway zones.
The audit further observed that of the total 10,391 diesel and 6,190 electric loco failures during the review period, 5,363 and 2,800 failures (52% 45%) respectively, were after their scheduled maintenance by loco sheds. More than 60% failures were in just 10 loco sheds.


“These were on account of defective material. High value items such as crankshafts, engine blocks, power assembly, traction motors, alternators, under gears, transformers and turbo super chargers failed within warranty period. The rate of such failure increased by 62% and 58% for diesel and electric locos respectively in 2016-17 as compared to 2012-13. This indicated poor material management,” said CAG.
In its review of records of unscheduled repairs at the selected 16 diesel loco sheds and 12 electric loco sheds, CAG noticed that 17,530 such repairs for diesel and 22,078 for electric were undertaken during 2012-17.
Source : TOI

Translate to English
Translate to Hindi

More Posts
General Travel
13339 views
2

Jul 17 2020 (19:21)   KGPW/Kharagpur Workshop
ahm33966~   4374 blog posts
Entry# 4670902            Tags  
Another SER Utkrist rake rolled out of Kharagpur workshop after POH, Many other coaches are being Utkrist converted in Kharagpur Workshop.
Photos credit is Internet
Translate to English
Translate to Hindi
General Travel
21875 views
5

Jul 13 2020 (10:11)   KGPW/Kharagpur Workshop
ahm33966~   4374 blog posts
Entry# 4668045            Tags  
First Utkrist Rake of SER Flagged off from KHARAGPUR WORKSHOP after Lockdown.
Photo credit: My friend
Translate to English
Translate to Hindi

More Posts
General Travel
18446 views
4

Jul 01 2020 (21:22)   KGPW/Kharagpur Workshop
ahm33966~   4374 blog posts
Entry# 4660593            Tags  
Kharagpur workshop yesterday turned out the 3PH EMU MEDHA rake after POH for the 1st time till now.
Translate to English
Translate to Hindi

More Posts
Page#    Showing 31 to 35 of 41 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy