Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Antyodaya Express: The best a common man can get. - Vikas Kumar

Search Forum
Post PNR
Platform Pic; Small Station Board;
Entry# 3345462-0
Platform Pic; Large Station Board;
Entry# 4546425-0


DMH/Dauram Madhepura (2 PFs)
दौरम मधेपुरा
دؤرم مدھیپورا


Track: Single Electric-Line

Updated: Nov 25 2023 (19:15) by AbhinavKr^~
Show ALL Trains
Number of Platforms: 2
Number of Halting Trains: 20
Number of Originating Trains: 0
Number of Terminating Trains: 0
NH 107, Maheshkhunt-Madhepura-Purnia Rd, District -Madhepura, Pincode- 852113
State: Bihar
Elevation: 49 m above sea level
Type: Regular
Category: NSG-5
Zone: ECR/East Central
Division: Samastipur
No Recent News for DMH/Dauram Madhepura
Nearby Stations in the News

0 Follows
Rating: 3.8/5 (32 votes)
cleanliness - good (4)
porters/escalators - good (4)
food - good (4)
transportation - good (4)
lodging - good (4)
railfanning - good (4)
sightseeing - good (4)
safety - good (4)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Station Forum

Page#    Showing 36 to 40 of 132 blog entries  <<prev  next>>
Info Update
51591 views
69

★★★
May 18 2020 (23:40)   DDU/Pt. DD Upadhyaya Junction (Mughalsarai) (8 PFs) | SRE/WAG-12B/60027
KhagariaJn^~
KhagariaJn^~   63466 blog posts
Entry# 4630547            Tags   Past Edits
ELF Madhepura (Bihar) Made First WAG12B (12000 HP) loco operation started on DDU division today. The train departed from DDU with WAG/12B-60027 at 14:08 hrs in long haul formation for DDU-BRWD section of DDU and DHN divisions of ECR.

________________________________________________

The
...
more...
much-awaited WAG-12 locomotive has been commissioned into revenue service by the Indian Railways. A long-haul train was worked by this locomotive in Mughalsarai division. The locomotive has been allocated a block of road numbers starting from 60000 onwards.

Based on the Prima Kz8A platform, the Alstom manufactured locomotive is primarily meant for service on the Eastern Dedicated Freight Corridor (EDFC). However, with the DFC not commissioned fully yet, the WAG-12 will operate on the IR network.

WAG-12 has two variants; The first model was the WAG-12A, of which only one unit has been manufactured. This design experienced issues with ride quality, which resulted in major modifications to the suspension and the bogies.

The final design, now known as WAG-12B, has been approved by the Indian Railways. This design is now heading for serial production at the new factory set up at Madhepura in Bihar.

________________________________________________

⏩ Technical Specifications of the WAG-12B

🔹️ Axial Arrangement :- Bo-Bo (For each of two units)

🔹️ Number of Axles :- 8

🔹️ Mass of Locomotive :- 180 Tons [Upgradeable to 200 Tons]

🔹️ Length :- 19,200 mm per unit ; 38,400 mm total length

🔹️ Centre-To-Centre Distance Between Bogies :- 10,200 mm

🔹️ Maximum Speed :- 100 km/h [Upgradeable to 120 km/h]

🔹️ Continuous Speed :- 60 km/h

🔹️ Max Load Haulage :- 6,300 tons, 1:150 Gradient, 60 kph for 25 Ton Per Axle Variant

🔹️ OHE Voltage :- Nominal: 22.5 kV, 50 Hz

Maximum: 31 kV

Minimum: 17 kV

🔹️ Traction Power (Continuous Rating) :- 9,000 kW (12,069 hp approx)

🔹️bMax Starting TE at 25t Axle Load / 22.5t Axle Load :- 785 kN / 705 kN

🔹️ Braking Effort :- 563 kN

🔹️Max Braking Effort :- 79.315 kN per motor

🔹️ Stopping Distance :- 900 metres: 100 kph to 0 kph

🔹️ Remote Multiple Unit Operations :- Yes, 2 Locomotives

🔹️ Traction Motor :- Asynchronous, Nose Suspended

🔹️ Maximum RPM :- 2,711

________________________________________________

⏩ New Features on the WAG-12

1️⃣ Two units (A and B) permanently coupled to each other. Both units only have cabs on the outward-facing ends.

2️⃣ Both units will be controlled from the working cab.

3️⃣ While both units will be provided with one pantograph each. However, only one pantograph will be raised at a time and will feed power to both the units through a high-tension overhead link.

4️⃣ Both units have been provided with a toilet for the crew.

5️⃣ The units are connected to each other through a vestibule and gangway.

6️⃣ A major departure from existing designs of locomotives is that high voltage apparatus like the vacuum circuit breaker is now inside the body of the locomotive in a special cubicle. The roof of the locomotive is almost empty except for the pantograph.

7️⃣ This locomotive has a larger wheel diameter, compared to other freight locomotives in service on the IR.

8️⃣ This locomotive also features the much-awaited ‘Brake Blending’ facility. If regenerative braking (AKA electric or Electro-Dynamic brake) is applied and found insufficient, a proportionate quantum of the pneumatic brake is applied simultaneously by the locomotive.

9️⃣ To improve reliability, almost all hardware switches and controls are replicated on the DDU (Driver Display Unit). Thus, several functions can also be controlled using ‘Soft Keys’.

🔟 A dehumidifier for air intake ensures that only dry air is used for cooling and ventilation systems. This will improve equipment life and insulation.

1️⃣1️⃣ An automatic flap system regulates the entry of air into the locomotive’s ventilation system and ensures uniform flow in various conditions.

1️⃣2️⃣ Tube drive equipped with self-aligning roller bearings for better suspension.

________________________________________________

⏩ Differences Between WAG-12A and WAG-12B

Limitations of the original WAG-12 design resulted in modifications and the WAG-12B variant. Here are the key differences between both types.

(WAG 12 / WAG 12 B)

1️⃣ Total Length :- 35,000 mm / 38,400 mm

2️⃣ Bogie Design :- Flat solebar / Gooseneck or handlebar shaped solebar

3️⃣ Traction link coupling between the bogie and body :- Below the driving cab / Turned around and now provided in the middle of the body

4️⃣ Center to center distance between the bogies :- Lower (8,500 mm) / Higher (10,200 mm)

________________________________________________

Article Link :-

click here

________________________________________________

Picture Source :- click here

click here

/news/post/407830

click here

click here

/news/post/408571

click here
click here
Others are from Twitter Pvt.

Translate to English
Translate to Hindi

More Posts
General Travel
9101 views
0

Apr 19 2021 (22:34)   DMH/Dauram Madhepura (2 PFs)
RaghavBZU12621
RaghavBZU12621   386 blog posts
Entry# 4943439            Tags  
when will the new Passenger class locomotive from alstom turned out ?
Posted thru Follow my Trip
Translate to English
Translate to Hindi

More Posts
1 Followers
General Travel
239542 views
9

Apr 03 2021 (16:05)   15706/Champaran Humsafar Express | MFP/Muzaffarpur Junction (8 PFs)
MKS^~   24660 blog posts
Entry# 4928404            Tags   Past Edits
#BoardingData #EarningData
Top 5 Deboarding Halts of 15706 Champaran Humsafar during 1/4/2019 to 31/3/2020:-
1. Muzaffarpur Jn - 13,593
2. Bapudham Motihari - 12,426
3. Saharsa Jn - 10,090
4.
...
more...
Gorakhpur Jn - 8,361
5. Bettiah - 7,565

Top 5 Boarding Halts :-
1. Old Delhi Jn - 75,851
2. Aligarh Jn - 5,573
3. Lucknow Charbagh - 3,988
4. Kanpur Central - 2,640
5. Muzaffarpur Jn - 990

Data Compiled by Office of The Dy. CCM/HQ, NR, Baroda House, New Delhi.
15705 Boarding Data - /blog/post/4791723

Translate to English
Translate to Hindi

More Posts
General Travel
283241 views
15

★★
Nov 26 2020 (16:53)   15705/Champaran Humsafar Express | SHC/Saharsa Junction (5 PFs)
MKS^~   24660 blog posts
Entry# 4791723            Tags   Past Edits
#BoardingData #EarningData
15705 Champaran Humsafar Boarding Figures & Earning (in Rs.) from all halts during 1/4/2019 to 15/3/2020:-

Top 5 Boarding Halts :-
1. Saharsa Junction - 13,601
2.
...
more...
Muzaffarpur Junction - 6,701
3. Bapudham Motihari - 6,652
4. Gorakhpur Junction - 6,064
5. Purnea Junction - 5,945

Top 5 Earning Halts :-
1. Saharsa Junction - Rs 2,21,48,401
2. Muzaffarpur Junction - Rs 1,39,59,136
3. Bapudham Motihari - Rs 1,28,58,282
4. Purnea Junction - Rs 96,32,818
5. Gorakhpur Junction - Rs 95,29,340

Data compiled by CRIS during the period of 1/4/2019 to 15/3/2020 in all reserved classes combined.
15706 Boarding/Deboarding/Earning Data - /blog/post/4928404

Translate to English
Translate to Hindi

More Posts
Greetings
15711 views
11

Mar 11 2021 (20:01)   DMH/Dauram Madhepura (2 PFs)
KhagariaJn^~
KhagariaJn^~   63466 blog posts
Entry# 4904130            Tags  
1 compliments
Om Namah Shivaya 🙏
कर्ता करे न कर सके, शिव करे सो होय
तीन लोक नौ खंड में, महाकाल से बड़ा न कोय।

🚩 बोलो हर हर महादेव 🚩

सिंघेश्वरनाथ
...
more...
मन्दिर मधेपुरा

Translate to English
Translate to Hindi
Page#    Showing 36 to 40 of 132 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy