Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Feeling bored in the Train - talk to a RailFan. You'll WISH the train gets late.

Search Forum
Post PNR
Large Station Board;
Entry# 933154-0
Large Station Board;
Entry# 1136156-0
Medium; Platform Pic; Large Station Board;
Entry# 3826302-0

TLH/Tilhar (3 PFs)
तिलहर
تلہر

Track: Double Electric-Line

Updated: Mar 01 (11:54)
Tilhar Railway Station (TLH) is located on the Lucknow-Bareilly line in Uttar Pradesh, India. It has three platforms and is situated off NH-30 on Station Road. The station is a popular stopover for travelers seeking budget-friendly lodging, delicious local vegetarian and non-vegetarian eateries, and exploring nearby temples and attractions.

Tourism

Shri Ram Mandir: A revered temple dedicated to Lord Rama.
Hanuman Mandir: A temple dedicated to Lord Hanuman.
Shaheed Smarak: A memorial dedicated to the martyrs of the Indian freedom struggle.
Tilhar Fort: A historical fort with architectural significance.
Bhimkund: A sacred pond associated with the epic Mahabharata.

Food

Shanti Sagar: A popular spot for vegetarian thalis and snacks.
Bikaner Sweets: A famous chain serving delicious sweets and snacks.
Haldiram's: Another well-known chain offering a variety of vegetarian options.
Govinda's: A vegetarian restaurant serving traditional Indian dishes.
The Vegetarian Kitchen: A local eatery offering a wide selection of vegetarian meals.
Number of Platforms: 3
Number of Halting Trains: 14
Number of Originating Trains: 0
Number of Terminating Trains: 0

Station Address

Off. NH 30, Station Road / Nigohi Road, Tilhar, District - Shahjahanpur - 242 307
State: Uttar Pradesh
Elevation: 157 m above sea level
Type: Regular
Category: NSG-5
Zone: NR/Northern
Division: Moradabad
No Recent News for TLH/Tilhar
Nearby Stations in the News

1 Follows
Rating: 4.5/5 (14 votes)
cleanliness - good (2)
porters/escalators - good (2)
food - good (1)
transportation - excellent (2)
lodging - good (1)
railfanning - excellent (2)
sightseeing - excellent (2)
safety - excellent (2)

Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Station Forum

Page#    Showing 11 to 15 of 16 blog entries  <<prev  next>>
1 Followers
Rail Fanning
31336 views
29

★★★
Jul 07 2015 (10:50)   15128/Kashi Vishwanath Express | PMR/Pitambarpur (3 PFs) | TKD/WDP-4B/40011
 
nitinbwrd~
nitinbwrd~   748 blog posts
Entry# 1534165            Tags   Past Edits
Never Before, Never Again; Garib Rath Express Crushes Same Train Twice At Full MPS - Indian Railways.....
A Story Beyond Belief....
Generally, People talk a lot of about the journeys that were exciting, thrilling, and well, the kind of stuff people usually associate with extreme rides. For me personally, reading about such journeys was one, and experiencing it was another. It all began, when my Friend Adithya planned to cover the MG section of NER, from Izzatnagar to Aishbagh with a couple of his friends, and I was also invited and accepted to
...
more...
go with willingness. After many twists and thirlling turns to the plot, the penultimate day arrived. The scene was like this, he was on his way to Delhi by the Karnataka Sampark Kranti express and thanks to woeful section controlling, it was more than 90 Mins late, and expected to reach Nizamuddin no earlier than 10:45. And hence I was to book his Tatkal ticket to accompany me to Lucknow the next day. Adithya suggested I try his ticket in the Saharsa Garib Rath, since there were more no. of seats available for Tatkal booking. But as luck would have it, the seats vanished before I could even sneeze, and then I shifted focus to the hero of this story – “Kashi Vishvanath Express” Saharsa Garibrath was the Anti-Hero of course. Be it luck or less demand, even at 12 Mins past 10 AM, seats were available in the Second AC of KV; as Kashi Vishvanath is called. With affirmation I booked his ticket,and it was decided that he would be traveling with me. I had a confirmed ticket in First AC of the same train with my family. The next day we landed in the New Delhi Railway Station at around 11:10, close to 25 Mins before departure time, Adithya speculated that the Garib Rath might have left already. Our Friends Dennis and Aditya Kaushal were there to see us off. It was only then that I checked to find out that the GR had not even reached New Delhi yet. As we kept chit-chatting away with time, Adithya went to talk to the TTE to check if he can join me in HA1 by paying the difference in fare. All was said and done, It was 11:25 Hrs, and we heard announcements of the Garib Rath Express being expected shortly on Platform No.15. We thought our departure would be delayed as the Garib Rath was a high priority train and would mostly be sent out ahead of us.11:35 Hrs, we were still not given the starter. The Kanpur Shatabdi played spoilsport this time, it was received in Platform No. 5 and that meant our switches were blocked till it entered. 11:40 Hrs, our train departed with a jerk, and Adithya as usual started recording the departure. He called me to the door to bid goodbye to friends and as we cautiously negotiated the switches and proceeded towards Shivaji Bridge, we received the shock of our lives, as the Garib Rath was still on Platform No 15 and hadn’t departed as yet. This only meant one thing, an Overtake was inevitable.
As our train cruised past Anand Vihar, Chander Nagar and Sahibabad, I found out that the Garib Rath had departed from NDLS @ 11:55, 45 Mins behind schedule and 15 Mins behind us. Adithya swore that the overtake might happen at Ghazibad itself,since we had a scheduled halt and the Garib Rath had a Non-Stop run till Moradabad Jn. But shocked again, we departed Ghaziabad after our 2 Min commercial halt. Then came our regular RF spots, Mehrauli skipped, Dasna skipped, Pilkuwa – Commercial halt; halted in mainline PF, 2 Mins, departed, all stations with loops were either skipped or we halted in the mainline. The only next possible spot for the inevitable ovetake was Hapur Jn. Being a Jn. and a loop-line halt, both of us assumed that the overtake would happen there mostly. But the GR didn’t manage to shorten the gap between us. In fact it had increased, by the time we departed Hapur, the GR was still in Pilkuwa. After crossing the Dibrugarh Rajdhani in Hapur,we raced towards Garhmukteswar and one by one all our regular RF spots were skipped brutally at MPS - Babugarh, Kuchesar Road, Simbhooli etc. Garhmukteswar city was our next halt, also a loop-line halt. But here too the GR was not close enough for an overtake and hence the controller decided to let us ahead. The Delhi bound Uttarakhand Sampark Kranti crossed us here. We had only 2 halts to go before Moradabad Jn. – Gajraula Jn. and Amroha. The overtake must happen in one of them, if not in any wayside station, for the GR’s very pride was at stake. Imagine, trailing a M/E till almost 150 Km with no halts. Finally, the overtake happened at Amroha. LDH WDM3A stamped its authority at MPS with the 18 coach GR. But the best was yet to come, best for us, worst for the GR. Thanks to some awful section controlling, we managed to catch up with the GR still stranded at Moradabad Jn. Our friend Zahaib who came to meet us, gave us the news that the GR was held up in PF No.4, since some other train had just departed from PF No.1 ahead of us, the same PF No.1 which we had entered. We received a fantastic surprise when we actually were given the starter ahead of the GR; GR Shocked, Controller Rocked.
We charged ahead towards Rampur Jn. Now, this was a first time either of us saw such a thing happening, both shocked and excited, we kept speculating as to where the next Overtake would happen. Despite many loop-line stations en-route, Kashi Vishwanath Express skipped all of them with authority. The new crew were in no mood to slow down and cracked at MPS wherever possible. Despite our 25 Mins delay, the GR was nowhere in sight to overtake us again and increase that delay of ours. Bareilly halt was negotiated at around quarter past 5. After we departed Bareilly; we tracked the GR to find out that it had arrived BE a few minutes after our departure. So we were sure that OT would happen sometime soon. And so it did, in our first commercial halt after Bareilly – Pitambarpur. Close to 7 Mins into our halt, neither the GR appeared nor did we get the starter. Our patient wait reached the 10th minute when the mainline starter and advanced starter went to green in a matter of seconds. The adrenaline rush peaked and our excitement levels knew no bounds. The 2 of us took our positions. And scaring away the un-expecting UR passengers, the rebuilt LDH Diesel Monster hunk once again charged past us at MPS with the Saharsa bound Garib Rath Express, the anti-hero finally had the last laugh, but undoubtedly the hero of this adventure was Kashi Vishwanath Express, which got priority over a premier class train not once but twice in the same route that too. After about 6 Mins of the GR’s re-overtake, we were given the starter, and Adithya and I rejoiced this adventurous ride all the way to Lucknow. It will remain a journey etched in our memory. Hope all of you who read this description find it just as exciting as we did when we experienced it live.
Click Here for HD Video :- click here

Translate to English
Translate to Hindi

More Posts
Rail Fanning
14370 views
4

Jun 15 2014 (21:20)   04662/MCTM Udhampur - Gorakhpur Special Fare Special | TLH/Tilhar (3 PFs)
 
Jayashree^
Jayashree^   56916 blog posts
Entry# 1136156            Tags   Past Edits
Tilhar ..SB..PF..Track..
Translate to English
Translate to Hindi

More Posts
Rail Fanning
10151 views
1

Dec 13 2013 (02:09)   TLH/Tilhar (3 PFs)
 
Saurabh
Saurabh   10920 blog posts
Entry# 933154            Tags  
Sb pic.
Source:click here
Translate to English
Translate to Hindi
General Travel
2544 views
0
Sep 21 2012 (15:33)   TLH/Tilhar (3 PFs)
 
guest   0 blog posts
Entry# 532066            Tags  
ed
Translate to English
Translate to Hindi
2555 views
0

Aug 18 2011 (23:20)   TLH/Tilhar (3 PFs)
 
Kaushlesh Sharma
Kaushlesh Sharma   1 blog posts
Entry# 222886            Tags  
Just i am going to submit the presentation in behalf of me and my friends who had remained the resident of Tilhar ( Station situated B/W Shahjahanpur and Bareilly in Moradabad divison in northern Railway ) , Now we are living due to jobs in Delhi-N.C.R. area .Scarcely we have to visit our native . I listen about you that You always solve the problems of peoples who reach to you .There are few little issues to you but it can solve our higher problems .
In the behalf of our problem , I want to share the condition of Tilhar Station . There are few points :-
1)-
...
more...
There are no arrangement of lighting after time of evening in absence of supply of electricity . Please provide resources as possible to have good facilities to passengers in view of security .
2)- There are Limitation of timing for Reservation facility (08:00 am to 14:00 pm ) as information provided. There is no provision of cancellation /Returning Tickets . it also remain closed at Sunday .
3)- The construction of platform No. 1 (Near East Cabin ) is pending from long duration , due to its , many times the passenger have to be faced great problems . You always focus on safety , but this problem here is facing by we passenger from long duration .
4)- There are no direct train in Evening from National Capitalism area or Moradabad Junction to Tilhar . We have to choose trains till Bareilly junction (56 km. from Tilhar ) and when we reach at Bareilly junction, there will no train for Tilhar after 20:45 pm to 03:30 Am .
The suggestible train for stopage at Tilhar station is 15274/15273 Satyagrah Express , because the timing of this train is suitable from both end . Because there are no train in Upside from 23:52 pm to 06:04 am for Bareilly or further stations from Tilhar .And when the stoppage of its may be possible at Bilpur , why not at Tilhar . I think the earning of Tilhar station has been increased after installing Reservation counter and become more increased after solving these little problems . Please consider this application as requesting letter. I hope for your positive action against this requested application .

Translate to English
Translate to Hindi
Page#    Showing 11 to 15 of 16 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy