Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

ट्रेनों का सफर, ज़िन्दगी का सफर, रेलफैन दोनों में माहिर

Search Forum
Post PNR

GBRA/Gobra (4 PFs)
गोबरा
গোবরা


Track: Quadruple Electric-Line

Show ALL Trains
Number of Platforms: 4
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
Gym St, Dankuni, Station Pally, Dist - Hooghly
State: West Bengal
Elevation: 6 m above sea level
Type: Regular
Category: n/a
Zone: ER/Eastern
Division: Howrah
No Recent News for GBRA/Gobra
Nearby Stations in the News

0 Follows
Rating: 2.2/5 (8 votes)
cleanliness - average (1)
porters/escalators - average (1)
food - poor (1)
transportation - poor (1)
lodging - average (1)
railfanning - average (1)
sightseeing - good (1)
safety - poor (1)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Station Forum

Page#    Showing 31 to 35 of 90 blog entries  <<prev  next>>
Rail Fanning
92332 views
14

★★
Jun 22 2020 (20:09)   DKAE/Dankuni Junction (5 PFs)
SAPTARSHI^~
SAPTARSHI^~   26554 blog posts
Entry# 4655314            Tags   Past Edits
◾EDFC Plan over existing Howrah division, Eastern Railway◾
.
▪️The tracks of DFC passes through Hooghly and Barddhaman District over Howrah division.
▪️The proposed track of DN DFC takes off at Ch. 15.441 from DN HBC line of Howrah – Delhi
...
more...
Rajdhani route near Dankuni. The UP DFC takes off from proposed UP HBC2 Line of IR at chainage 16.241 near Dankuni. UP DFC runs parallel to and on "south side" of UP Howrah – Barddhaman Chord Line upto Gobra and at Km.18.048 (between Gobra & Janai Rd.), the UP DFC crosses the existing IR track to Down side. From here, the double line DFC alignment is running parallel to and on "north side" of existing IR tracks.
▪️A "Junction" station "New Dankuni" has been proposed at Ch. 23.684 km near Begumpur station, between Janai Rd. and Baruipara. For providing connectivity to SAIL & other sidings near Dankuni
▪️Existing Seoraphuli-Tarakeswar line passes over the existing HBC line by a flyover near Kamarkundu. DFC line, which runs parallel to DN HBC, is required to cross the embankment of Seoraphuli-Tarakeswar line. It has been decided to accomodate the DFC suitably, by lowering the RCC Box to provide the required vertical clearance.
▪️Another "crossing" station "New Jaugram" has been proposed in between Jaugram and Nabagram at Ch. 66.000 km.
▪️The DFC tracks traverses almost parallel to the HBC line upto Palla Road station at Ch. 77.572 km.
▪️ From Palla Road, the Up & Dn DFC tracks crosses the Howrah-Barddhaman Chord line with a flyover at Ch. 78.041 km and then runs parallel on the "South side" of the Howrah-Barddhaman chord line.
▪️This flyover has been proposed to avoid following constraints:- (i) Saktigarh, Junction of Main Line and Chord line (ii) Barddhaman Diesel Shed. (iii) Barddhaman RRI cabin. (iv) Barddhaman – Katwa BG line.
▪️A major constraint is Barddhaman Junction Station and adjoining structures. The modifications are as under:
(i) Dismantling of Good Shed of Bardhaman station and shifting the same to the down side. (ii) Dismantling Station building, GRP office, AEN office, Running room, IOW office & store, New booking office, MFC building, etc. and reconstruction of the same.
(iii) Converting the Home Platform No.1 of Barddhaman station to Island Platform. Dismantling Delhi end of Platform No.1 for 180m length & extending the same towards Howrah end to accommodate DFC alignment.
(iv) Extension /modification to existing FOB’s to provide connectivity to all platforms from newly constructed circulating area. Remodelling of circulating area.
▪️A "Junction" station "New Khana" has been proposed at Ch. 104.151 km near between Talit & Khana to provide connectivity to Sahebganj Loop.
.
*This is for information of Rail enthusiasts & may be modified by authority. Please confirm through official site.*

Translate to English
Translate to Hindi

More Posts
0
updating ...
10 wishes
Happy Journey Happy Journey Happy Journey ଶୁଭ ଯାତ୍ରା शुभ यात्रा Happy Journey Happy Journey Bon voyage ನಿಮ್ಮ ಪ್ರಯಾಣ ಸುಖಕರವಾಗಿರಲಿ Happy Journey
Short holiday trip back to home. Catching the Duronto this time.

13 Posts

FmtBlog
3327 views
0

Sep 06 2021 (17:38)
Dr.AtulSinha~   4238 blog posts
Re# 5060285-14            Tags  
Gobra  
@GBRA: Gobra &122 km/h MPS 🔥
Translate to English
Translate to Hindi

More Posts
General Travel
36590 views
0

Aug 14 2021 (12:14)   12312/Netaji Express | GBRA/Gobra (4 PFs) | HWH/WAP-7/30305
VIVIAN~
VIVIAN~   486 blog posts
Entry# 5041273            Tags   Past Edits
man cheats death in front of speeding wap-7 | 24 coach load | kalka - howrah mail rushes past gobra
link: click here
march - 2014 - location: gobra
12312 down kalka - howrah mail powered by howrah (hwh) based wap-7 # 30305 speeds through honking away as a man carelessly crosses the tracks cheating death .
Translate to English
Translate to Hindi
General Travel
21426 views
1

Jun 13 2021 (11:40)   12260/Bikaner - Sealdah AC Duronto Express | GBRA/Gobra (4 PFs)
VIVIAN~
VIVIAN~   486 blog posts
Entry# 4984414            Tags  
UNUSUAL DAY TIME FACEOFF !! | CNB WAP-4 SEALDAH DURONTO VS HWH WAP-4 SEALDAH - AJMER EXPRESS !!!!
link: click here
Rescheduled 12987 Sealdah - Ajmer Express powered by Howrah (HWH) based WAP-4 # 22585 accelerates hard and crosses a late running 12260 New Delhi - Sealdah Duronto Express powered by Kanpur (CNB) based WAP-4 # 22545.
Translate to English
Translate to Hindi
Rail Fanning
65591 views
35

★★★
Dec 19 2019 (02:05)   DKAE/Dankuni Junction (5 PFs) | HWH/WAP-5/30122
SAPTARSHI^~
SAPTARSHI^~   26554 blog posts
Entry# 4517400            Tags   Past Edits
"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.
Video click here
🔹Power Nominated - HWH WAP5 30122
🔹Date - 18.12.19
🔹Actual
...
more...
timings & speed "at stations" -
Dankuni.............d.13:34:58 0 kmph
Gobra.................p.13:36:28 130kmph
Janai Road........p.13:42:58 15 kmph
Begumpur..........p.13:48:55 85 kmph
Baruipara...........a.13:54:10 0 kmph
🔹Highest speed achieved - 142kmph
🔹 Physical condition of 4th line
Track fitness - Granted
OHE fitness - Granted
Signal - Not functional
Turnout with M/Line (Up HBC Line) - available at Baruipara
🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.
🔹Details of pictures
Pic 1-4 = at Gobra & Janai Rd. showing actual trial
Pic 5-6 = Notice of trial
Pic 7-10 = Primary track testing at Janai Rd. & Baruipara
🔹Status/Result of trial - Successful

Translate to English
Translate to Hindi

More Posts
Page#    Showing 31 to 35 of 90 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy