Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Rockfort Express: திருச்சி அவனது கோட்டை, இரவில் சென்னை வரை வேட்டை, அவன் தான் மலைக்கோட்டை. - Vijay Baradwaj

Search Gallery
Post PNR
Large Station Board;
Entry# 1504931-0
Large Station Board;
Entry# 1836991-0

OBR/Obra Dam (2 PFs)
ओबरा डैम
اوبرا ڈیم


Track: Double Electric-Line

Updated: Jul 20 2020 (19:23) by Pran22^~
Show ALL Trains
Number of Platforms: 2
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
Power House Road, Obra
State: Uttar Pradesh
Elevation: 209 m above sea level
Type: Regular
Category: n/a
Zone: ECR/East Central
Division: Dhanbad
No Recent News for OBR/Obra Dam
Nearby Stations in the News

0 Follows
Rating: 3.0/5 (16 votes)
cleanliness - average (2)
porters/escalators - average (2)
food - average (2)
transportation - average (2)
lodging - average (2)
railfanning - excellent (2)
sightseeing - good (2)
safety - average (2)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 6 to 10 of 49 Pic/Video Blogs  <<prev  next>>

15073/Singrauli - Tanakpur Triveni Express

CPU/Chopan

IZN/WAP-4


282896 views
1

Obra Dam-salaibanwa Dubling
×

01447COV/Shaktipunj Special

CPU/Chopan


308608 views
15

In view of non - interlocked work at Chopan(CPU) in connection with commissioning of EI in Dhanbad division. Pre NI from 18.07.21 to 26.07.21 & 27.07.21. Following trains shall be diverted as per the details given below:-
×

03350/Patna - Singrauli Special

OBR/Obra Dam


53279 views
4

During recent visit to my hometown singrauli, i got to see the massive scale construction and earthwork regarding yard remodelling and Turntable construction work at obra dam railway station in Dhanbad division of East Central Railway. The too much earthwork may be a sign of construction of a loco shed possibly as the section is electrified completely.
×

OBR/Obra Dam


26957 views
8

Green Goblin roaming around Obra Dam railway station...Trains from Garhwa and Singrauli side will bypass Chopan Jn till March 7th 2020 due to non-interlocking work starting today.Location: Obra Dam, Chopan Jn - Singrauli Jn section, Sonebhadra, UPDate: 1st March 2019
×

OBR/Obra Dam


26957 views
8

Green Goblin roaming around Obra Dam railway station...Trains from Garhwa and Singrauli side will bypass Chopan Jn till March 7th 2020 due to non-interlocking work starting today.Location: Obra Dam, Chopan Jn - Singrauli Jn section, Sonebhadra, UPDate: 1st March 2019
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×

KRLR/Karaila Road Junction


32024 views
8

Jan 21 2020 : Singrauli (SGRL)- Chopan(CPU) doubling and electrification update.Earth work being done between OBRA and SGRL at good speed. Sleeper placement at some places. Bridges under construction. Holes for electric traction already constructed also for down line with placement of poles at some places.Beyond KarailaRoad (KRLR) work is 70% done. Last two photos show the line between KRLR and SGRL, since the passenger train (15076) is heading towards ANPR-SKTN.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy