Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Once upon a time, there was a great king called Vikramaditya - the WAM-4 - Shashank

Search Gallery
Post PNR
Large Station Board;
Entry# 974655-0
Small Station Board;
Entry# 5115243-1

BJE/Bhojudih Junction (2 PFs)
भोजूडीह जंक्शन
ভোজুডী জংশন


Track: Double Electric-Line

Updated: Mar 14 2023 (14:27)
Show ALL Trains
Number of Platforms: 2
Number of Halting Trains: 22
Number of Originating Trains: 4
Number of Terminating Trains: 4
Santaldih Road, Bhojudih, District - Bokaro. Pincode - 828303.
State: Jharkhand
Elevation: 152 m above sea level
Type: Junction
Category: NSG-6
Zone: SER/South Eastern
Division: Adra
No Recent News for BJE/Bhojudih Junction
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 6 to 10 of 55 Pic/Video Blogs  <<prev  next>>

19414/Kolkata - Ahmedabad Weekly Express

KTH/Katrasgarh


1269796 views
8

Following stoppages approved
×

12815/Nandan Kanan Express

BJE/Bhojudih Junction


126912 views
5

New stops across stations likelyTinpahar, chandil, pokla, bhojudih, katrasgarh, garhwatown, khalari stations
×

DHN/Dhanbad Junction


415158 views
5

Rajya Sabha MP and one of the leader of Jharkhand movement, Shibu soren has met RM and demanded that the names of stations should be written in Bengali in the bengali dominated regions of Santhal Pargana, Manbhum, Singhbhum, Dhalbhum and Panchpargana of Jharkhand.
×

SNTD/Santaldih


267379 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


267379 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


267379 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


267379 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


267379 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


267379 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


267379 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


267379 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy