Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

नहीं कोई गम, रेलवे से हैं हम - Aman

Search Gallery
Post PNR


Large Station Board;
Entry# 974655-0
Small Station Board;
Entry# 5115243-1

BJE/Bhojudih Junction (2 PFs)
भोजूडीह जंक्शन
ভোজুডী জংশন

Track: Double Electric-Line

Updated: Mar 14 2023 (14:27)


Bhojudih Junction (BJE) is a railway station located in Santaldih, Bokaro district, Jharkhand, with two platforms. It's a bustling hub connecting various parts of the state and is known for its proximity to the scenic Bokaro Steel City. The station offers basic amenities like waiting rooms and refreshment stalls, perfect for a quick stopover or a relaxing break during your journey.

Tourism

Maa Durga Temple: A revered temple dedicated to Goddess Durga, known for its peaceful ambiance.
Hanuman Temple: A temple dedicated to Lord Hanuman, offering a serene environment for prayer.
Shiva Temple: A temple dedicated to Lord Shiva, attracting devotees from nearby areas.
Jagannath Temple: A temple dedicated to Lord Jagannath, known for its vibrant festivals.
Jain Temple: A peaceful Jain temple, showcasing intricate carvings and a calm atmosphere.

Food

The Dhaba: A popular spot for delicious vegetarian thalis and snacks.
Bhojudih Snacks: Known for its variety of vegetarian street food and snacks.
The Veg Kitchen: A vegetarian restaurant offering a wide selection of dishes.
Swastik Restaurant: A pure vegetarian restaurant serving traditional Indian dishes.
The Vegetarian Hut: A small and cozy eatery with delicious vegetarian options.
Number of Platforms: 2
Number of Halting Trains: 22
Number of Originating Trains: 4
Number of Terminating Trains: 4

Station Address

Santaldih Road, Bhojudih, District - Bokaro. Pincode - 828303.
State: Jharkhand
Elevation: 152 m above sea level
Type: Junction
Category: NSG-6
Zone: SER/South Eastern
Division: Adra
No Recent News for BJE/Bhojudih Junction
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips


Picture & Video Gallery

Page#    Showing 11 to 15 of 57 Pic/Video Blogs  <<prev  next>>

SNTD/Santaldih


308862 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


308862 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


308862 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


308862 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


308862 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


308862 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


308862 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

SNTD/Santaldih


308862 views
5

New Coal washery work in full swing by RITES.LTD on behalf of BCCL behind the existing Bhojudih Coal Washery (BCW) at Santaldih. It will also have modification and dismantling in existing BCW siding with 250 KV electrification. It has twin single line from Santaldih named North Road and South Road out of which South Road is electrified but is unfit for operation due to wagon derailment from last 6-8 months and BCCL is also not worried about that. After inauguration of new Washery we can aspect traffic in this washery as it was before in 2014-15.
×

ANR/Anara


348822 views
5

Track upgradation work in full swing over Adra Division. Workers working round the clock with modern machines in Anara Sleeper Assembly Unit between line no. 6 Down and Community Hall, Anara to supply the assembled sleepers to the site of work.Site of Work:-Santaldih (SNTD)-Rukni (RUI) Down LineTalgoria (TLE) for doubling of BJE-BKSC section.If you know any further works of track upgradation going on over Adra Division please reply.
×

ANR/Anara


348822 views
5

Track upgradation work in full swing over Adra Division. Workers working round the clock with modern machines in Anara Sleeper Assembly Unit between line no. 6 Down and Community Hall, Anara to supply the assembled sleepers to the site of work.Site of Work:-Santaldih (SNTD)-Rukni (RUI) Down LineTalgoria (TLE) for doubling of BJE-BKSC section.If you know any further works of track upgradation going on over Adra Division please reply.
×

SNTD/Santaldih


89840 views
4

Girder Launching of new Foot Over Bridge at Santaldih (SNTD) completed on 29.01.2023. For the work 140T Break Down Crane named "Garuda" of ART/ADRA was brought along with Tower Car of Adra, Purulia and Bhojudih for OHE works.
×

SNTD/Santaldih


89840 views
4

Girder Launching of new Foot Over Bridge at Santaldih (SNTD) completed on 29.01.2023. For the work 140T Break Down Crane named "Garuda" of ART/ADRA was brought along with Tower Car of Adra, Purulia and Bhojudih for OHE works.
×

SNTD/Santaldih


89840 views
4

Girder Launching of new Foot Over Bridge at Santaldih (SNTD) completed on 29.01.2023. For the work 140T Break Down Crane named "Garuda" of ART/ADRA was brought along with Tower Car of Adra, Purulia and Bhojudih for OHE works.
×

SNTD/Santaldih


89840 views
4

Girder Launching of new Foot Over Bridge at Santaldih (SNTD) completed on 29.01.2023. For the work 140T Break Down Crane named "Garuda" of ART/ADRA was brought along with Tower Car of Adra, Purulia and Bhojudih for OHE works.
×

08677/Bishnupur - Dhanbad MEMU Special

VSU/Bishnupur Junction


88006 views
16

First run of 08677/78 Bishnupur Dhanbad Bankura MEMU Special . This train was suspended from Lockdown 2020. After 2.5 years This train back in wheels. BEML made 3Phase MEMU's First run in ADRA Division also.
×

08677/Bishnupur - Dhanbad MEMU Special

VSU/Bishnupur Junction


88006 views
16

First run of 08677/78 Bishnupur Dhanbad Bankura MEMU Special . This train was suspended from Lockdown 2020. After 2.5 years This train back in wheels. BEML made 3Phase MEMU's First run in ADRA Division also.
×

08677/Bishnupur - Dhanbad MEMU Special

VSU/Bishnupur Junction


88006 views
16

First run of 08677/78 Bishnupur Dhanbad Bankura MEMU Special . This train was suspended from Lockdown 2020. After 2.5 years This train back in wheels. BEML made 3Phase MEMU's First run in ADRA Division also.
×

08677/Bishnupur - Dhanbad MEMU Special

VSU/Bishnupur Junction


88006 views
16

First run of 08677/78 Bishnupur Dhanbad Bankura MEMU Special . This train was suspended from Lockdown 2020. After 2.5 years This train back in wheels. BEML made 3Phase MEMU's First run in ADRA Division also.
×

08677/Bishnupur - Dhanbad MEMU Special

VSU/Bishnupur Junction


88006 views
16

First run of 08677/78 Bishnupur Dhanbad Bankura MEMU Special . This train was suspended from Lockdown 2020. After 2.5 years This train back in wheels. BEML made 3Phase MEMU's First run in ADRA Division also.
×

08677/Bishnupur - Dhanbad MEMU Special

VSU/Bishnupur Junction


88006 views
16

First run of 08677/78 Bishnupur Dhanbad Bankura MEMU Special . This train was suspended from Lockdown 2020. After 2.5 years This train back in wheels. BEML made 3Phase MEMU's First run in ADRA Division also.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy