Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Dadar/Pathankot Express - ਤੇਰੇ ਬਿਨ ਮਰ ਜਾਣਾ

Search Gallery
Post PNR
Large Station Board;
Entry# 1339912-0
Large Station Board;
Entry# 2054686-0
no description available
Entry# 5722756-0

BOI/Bainchi (5 PFs)
बैंची
বৈঁচি


Track: Triple Electric-Line

Updated: Jun 27 2023 (17:51) by rajkamal.sdah~
Show ALL Trains
Number of Platforms: 5
Number of Halting Trains: 4
Number of Originating Trains: 0
Number of Terminating Trains: 0
Station road , BOINCHI , Pin - 712134 , Dist- Hooghly
State: West Bengal
Elevation: 21 m above sea level
Type: Regular
Category: SG-3
Zone: ER/Eastern
Division: Howrah
No Recent News for BOI/Bainchi
Nearby Stations in the News

0 Follows
Rating: 2.7/5 (8 votes)
cleanliness - good (1)
porters/escalators - poor (1)
food - good (1)
transportation - poor (1)
lodging - poor (1)
railfanning - good (1)
sightseeing - average (1)
safety - good (1)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 6 to 10 of 17 Pic/Video Blogs  <<prev  next>>

03043 CS/Howrah - Raxaul Special

BOI/Bainchi


61058 views
2

Imagine a situation if your car is parked 70KM away from your home.Similarly I was surprised to spot the empty rake of Holi Special parked at Bainchi at HB Main which is 70KM away from it's base station HWH. I have no idea why the rake is parked so far. If anyone can put some light on it, would be useful.
×

03043 CS/Howrah - Raxaul Special

BOI/Bainchi


61058 views
2

Imagine a situation if your car is parked 70KM away from your home.Similarly I was surprised to spot the empty rake of Holi Special parked at Bainchi at HB Main which is 70KM away from it's base station HWH. I have no idea why the rake is parked so far. If anyone can put some light on it, would be useful.
×

03043 CS/Howrah - Raxaul Special

BOI/Bainchi


61058 views
2

Imagine a situation if your car is parked 70KM away from your home.Similarly I was surprised to spot the empty rake of Holi Special parked at Bainchi at HB Main which is 70KM away from it's base station HWH. I have no idea why the rake is parked so far. If anyone can put some light on it, would be useful.
×

13015/Howrah - Jamalpur Kavi Guru Express

DBP/Debipur


4064329 views
3

NOTICESEngineering/Other blocksHowrah Barddhaman Main Line HBM & Bandel-Naihati section including all lines & carshed of Bandelclick hereclick here Bandel Barddhaman mainline blocks
×

13015/Howrah - Jamalpur Kavi Guru Express

DBP/Debipur


4064329 views
3

NOTICESEngineering/Other blocksHowrah Barddhaman Main Line HBM & Bandel-Naihati section including all lines & carshed of Bandelclick hereclick here Bandel Barddhaman mainline blocks
×

13015/Howrah - Jamalpur Kavi Guru Express

DBP/Debipur


4064329 views
3

NOTICESEngineering/Other blocksHowrah Barddhaman Main Line HBM & Bandel-Naihati section including all lines & carshed of Bandelclick hereclick here Bandel Barddhaman mainline blocks
×

13015/Howrah - Jamalpur Kavi Guru Express

DBP/Debipur


4064329 views
3

NOTICESEngineering/Other blocksHowrah Barddhaman Main Line HBM & Bandel-Naihati section including all lines & carshed of Bandelclick hereclick here Bandel Barddhaman mainline blocks
×

13106/Ballia - Sealdah Express

DBP/Debipur


1062813 views
1

Power & Traffic Block for Commissioning of 3rd Line in Howrah-Barddhaman Main
×

13031/Howrah - Jaynagar Express

BOI/Bainchi


24842 views
9

Hwh Jyg Pass @BainchiWith Hwh P4+ Gd Wdm-3A
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


789432 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy