Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The train is a small world moving through a larger world - Niraj Kumar

Search Gallery
Post PNR

BSPX/Banspani (1 PFs)
बांशपानी
ବାଂଶପାଣି


Track: Double Electric-Line

Updated: Dec 31 2022 (06:57)
Show ALL Trains
Number of Platforms: 1
Number of Halting Trains: 10
Number of Originating Trains: 0
Number of Terminating Trains: 0
Joda-Bamebari State Expressway II, Station Road, Banspani Ward, Joda PIN -758034, Tel no - 06767 211130
State: Odisha
Elevation: 487 m above sea level
Type: Regular
Category: NSG-6
Zone: SER/South Eastern
Division: Chakradharpur
3 Travel Tips
No Recent News for BSPX/Banspani
Nearby Stations in the News

0 Follows
Rating: 3.9/5 (32 votes)
cleanliness - good (4)
porters/escalators - average (4)
food - average (4)
transportation - good (4)
lodging - excellent (4)
railfanning - excellent (4)
sightseeing - excellent (4)
safety - good (4)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 6 to 10 of 15 Pic/Video Blogs  <<prev  next>>

BSPX/Banspani

BZA/WAG-7/28405


35573 views
12

South Visitors loitering at Banspani. 1. 28426 BZA WAG 72. 28405 BZA WAG 73. 27593 KZJ WAG 74. 27429 KZJ WAG 7
×

BSPX/Banspani

BZA/WAG-7/28405


35573 views
12

South Visitors loitering at Banspani. 1. 28426 BZA WAG 72. 28405 BZA WAG 73. 27593 KZJ WAG 74. 27429 KZJ WAG 7
×

BSPX/Banspani

BZA/WAG-7/28405


35573 views
12

South Visitors loitering at Banspani. 1. 28426 BZA WAG 72. 28405 BZA WAG 73. 27593 KZJ WAG 74. 27429 KZJ WAG 7
×

BSPX/Banspani

BZA/WAG-7/28405


35573 views
12

South Visitors loitering at Banspani. 1. 28426 BZA WAG 72. 28405 BZA WAG 73. 27593 KZJ WAG 74. 27429 KZJ WAG 7
×

BSPX/Banspani

BZA/WAG-7/28405


35573 views
12

South Visitors loitering at Banspani. 1. 28426 BZA WAG 72. 28405 BZA WAG 73. 27593 KZJ WAG 74. 27429 KZJ WAG 7
×

BSPX/Banspani

BZA/WAG-7/28405


35573 views
12

South Visitors loitering at Banspani. 1. 28426 BZA WAG 72. 28405 BZA WAG 73. 27593 KZJ WAG 74. 27429 KZJ WAG 7
×

BSPX/Banspani

BZA/WAG-7/28405


35573 views
12

South Visitors loitering at Banspani. 1. 28426 BZA WAG 72. 28405 BZA WAG 73. 27593 KZJ WAG 74. 27429 KZJ WAG 7
×

BSPX/Banspani


130745 views
0

First time in the Iron Ore loding sector in IR, Pre-loading weighing system at Banspani and Noamundi sdg of CKP Div reduces post-loading detention of loaded rakes about 1hr 30minutes in comparison to previous system.This will increase rake availability for loading successively. click here
×

BSPX/Banspani


130745 views
0

First time in the Iron Ore loding sector in IR, Pre-loading weighing system at Banspani and Noamundi sdg of CKP Div reduces post-loading detention of loaded rakes about 1hr 30minutes in comparison to previous system.This will increase rake availability for loading successively. click here
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

20815/Tatanagar - Visakhapatnam SF Express

TATA/Tatanagar Junction

VSKP/WAP-4/22992


279745 views
17

Ok... The 2nd part of the pics of my trip on TATA-VSKP is here...1,2- SB of Maluka3 - Train standing on a curve ( the pic is wrongly oriented )4. BNDN WDM 3A doing shunting activities at Dangoposi5-7 - BIA WAG 7 waiting at a stabling line at Dangoposi8. SB of Dangoposi9. SB of Pada Pahar10. The line below the bridge goes to BARBIL/GUA..as we branch from that line at Pada Pahar11. Initiating a curve12. Mines section13. Sun setting as the reflection falls over the rails and a small pond by the tracks.14-15 Entering Banspani16-17. Bhusaval WAG 5 twins waiting for...
×

BSPX/Banspani


19676 views
0

PJNR-KDJR section of BSPX-JKPR route was successfully test with 120+ kmph recently. Indian Railways is on move. Thanks to Suresh Prabhu. Keep improving.
×

BSPX/Banspani


12250 views
0

Update the new pic of BSPX
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy