Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

Uttarbanga Exp: উত্তরের আত্মার আত্মীয় - Avinaba Bose

Search Gallery
Post PNR

GBRA/Gobra (4 PFs)
गोबरा
গোবরা


Track: Quadruple Electric-Line

Show ALL Trains
Number of Platforms: 4
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
Gym St, Dankuni, Station Pally, Dist - Hooghly
State: West Bengal
Elevation: 6 m above sea level
Type: Regular
Category: n/a
Zone: ER/Eastern
Division: Howrah
No Recent News for GBRA/Gobra
Nearby Stations in the News

0 Follows
Rating: 2.2/5 (8 votes)
cleanliness - average (1)
porters/escalators - average (1)
food - poor (1)
transportation - poor (1)
lodging - average (1)
railfanning - average (1)
sightseeing - good (1)
safety - poor (1)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 26 to 30 of 70 Pic/Video Blogs  <<prev  next>>

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction

HWH/WAP-5/30122


65571 views
35

"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.Video click here🔹Power Nominated - HWH WAP5 30122🔹Date - 18.12.19🔹Actual timings & speed "at stations" - Dankuni.............d.13:34:58 0 kmphGobra.................p.13:36:28 130kmphJanai Road........p.13:42:58 15 kmphBegumpur..........p.13:48:55 85 kmphBaruipara...........a.13:54:10 0 kmph🔹Highest speed achieved - 142kmph🔹 Physical condition of 4th lineTrack fitness - GrantedOHE fitness - GrantedSignal - Not functionalTurnout with M/Line (Up HBC Line) - available at Baruipara🔹TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.🔹Details of picturesPic 1-4 = at Gobra & Janai Rd. showing actual trialPic...
×

DKAE/Dankuni Junction


17486 views
2

Energization of "Dankuni-Baruipara 4th Line" of Howrah - Barddhaman Chord section
×

DKAE/Dankuni Junction


17486 views
2

Energization of "Dankuni-Baruipara 4th Line" of Howrah - Barddhaman Chord section
×

36811/Howrah - Barddhaman Local via-Chord Line

KQU/Kamarkundu


271956 views
8

First local of the day approaching Kamarkundu, while P.Way men taking a brief halt with Dynamic Tamping Express & awaiting clearance after a whole night work. #emuER
×

36811/Howrah - Barddhaman Local via-Chord Line

KQU/Kamarkundu


271956 views
8

First local of the day approaching Kamarkundu, while P.Way men taking a brief halt with Dynamic Tamping Express & awaiting clearance after a whole night work. #emuER
×

36811/Howrah - Barddhaman Local via-Chord Line

KQU/Kamarkundu


271956 views
8

First local of the day approaching Kamarkundu, while P.Way men taking a brief halt with Dynamic Tamping Express & awaiting clearance after a whole night work. #emuER
×

36811/Howrah - Barddhaman Local via-Chord Line

KQU/Kamarkundu


271956 views
8

First local of the day approaching Kamarkundu, while P.Way men taking a brief halt with Dynamic Tamping Express & awaiting clearance after a whole night work. #emuER
×

36811/Howrah - Barddhaman Local via-Chord Line

KQU/Kamarkundu


271956 views
8

First local of the day approaching Kamarkundu, while P.Way men taking a brief halt with Dynamic Tamping Express & awaiting clearance after a whole night work. #emuER
×

KQU/Kamarkundu

TATA/WAG-9/31476


128776 views
10

#MetroRailwayKolkata#MetroKamarkunduStation➡️The 5th ICF-Medha Metro Rake which is glitch-free compared to the previous ones.➡️After hours of waiting,it was possible to get this train passing through Chord line after traffic load was minimised (Date-26/02/19; Time-21:51 Hrs.)➡️Watch the metro smoothly passing the night stations.➡️Other pics taken at BARN loop (Date-27/02/19) ➡️Link for 3rd rake capture /blog/post/3353459 #mymemories #lifetimecapture
×

KQU/Kamarkundu

TATA/WAG-9/31476


128776 views
10

#MetroRailwayKolkata#MetroKamarkunduStation➡️The 5th ICF-Medha Metro Rake which is glitch-free compared to the previous ones.➡️After hours of waiting,it was possible to get this train passing through Chord line after traffic load was minimised (Date-26/02/19; Time-21:51 Hrs.)➡️Watch the metro smoothly passing the night stations.➡️Other pics taken at BARN loop (Date-27/02/19) ➡️Link for 3rd rake capture /blog/post/3353459 #mymemories #lifetimecapture
×

KQU/Kamarkundu

TATA/WAG-9/31476


128776 views
10

#MetroRailwayKolkata#MetroKamarkunduStation➡️The 5th ICF-Medha Metro Rake which is glitch-free compared to the previous ones.➡️After hours of waiting,it was possible to get this train passing through Chord line after traffic load was minimised (Date-26/02/19; Time-21:51 Hrs.)➡️Watch the metro smoothly passing the night stations.➡️Other pics taken at BARN loop (Date-27/02/19) ➡️Link for 3rd rake capture /blog/post/3353459 #mymemories #lifetimecapture
×

12988/Ajmer - Sealdah SF Express

GBRA/Gobra

HWH/WAP-4/22530


7788 views
0

Location: GobraTrain No- 12988 Ajmer - Sealdah SF Express cautiously crawls towards Dankuni Jn. powered by Howrah (HWH) based WAP-4 #22530
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy