Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

कोशी का प्रवेश द्वार — मानसी जं० - Prabhat Sharan

Search Gallery
Post PNR
Large Station Board;
Entry# 941652-0
Large Station Board;
Entry# 2076807-5
Large Station Board;
Entry# 2076807-5

SSPH/Satish Samanta P.H. (2 PFs)
सतीश सामंत हॉल्ट
সতীশ সামন্ত হল্ট


Track: Double Electric-Line

Show ALL Trains
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
Mahishadal Geonkhali Road , near Mahisadal Girls College , Dist - Purba Medinipur - 721628
State: West Bengal
Elevation: 8 m above sea level
Type: Regular
Category: n/a
Zone: SER/South Eastern
Division: Kharagpur
No Recent News for SSPH/Satish Samanta P.H.
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 1 to 5 of 11 Pic/Video Blogs  next>>

SSPH/Satish Samanta P.H.


93782 views
11

Current update on the ongoing doubling work at SSPH, after the last updates /blog/post/1606708 and /blog/post/1330465 . Great news, the 2nd line has been laid fully with all required electrification work. Now it is connected from both the sides, KSBP and MSDL. The new PF has been ready (almost ~ 95%)..All the pics were taken by my father today morning, when he went for a morning walk. He sent me those pics via whatsapp. Enjoy..All the 5 pics here show the newly built staircase, which will connect both the PFs with the road. In Pic 5, the complete status of the...
×

SSPH/Satish Samanta P.H.


93782 views
11

Current update on the ongoing doubling work at SSPH, after the last updates /blog/post/1606708 and /blog/post/1330465 . Great news, the 2nd line has been laid fully with all required electrification work. Now it is connected from both the sides, KSBP and MSDL. The new PF has been ready (almost ~ 95%)..All the pics were taken by my father today morning, when he went for a morning walk. He sent me those pics via whatsapp. Enjoy..All the 5 pics here show the newly built staircase, which will connect both the PFs with the road. In Pic 5, the complete status of the...
×

SSPH/Satish Samanta P.H.


93782 views
11

Current update on the ongoing doubling work at SSPH, after the last updates /blog/post/1606708 and /blog/post/1330465 . Great news, the 2nd line has been laid fully with all required electrification work. Now it is connected from both the sides, KSBP and MSDL. The new PF has been ready (almost ~ 95%)..All the pics were taken by my father today morning, when he went for a morning walk. He sent me those pics via whatsapp. Enjoy..All the 5 pics here show the newly built staircase, which will connect both the PFs with the road. In Pic 5, the complete status of the...
×

SSPH/Satish Samanta P.H.


93782 views
11

Current update on the ongoing doubling work at SSPH, after the last updates /blog/post/1606708 and /blog/post/1330465 . Great news, the 2nd line has been laid fully with all required electrification work. Now it is connected from both the sides, KSBP and MSDL. The new PF has been ready (almost ~ 95%)..All the pics were taken by my father today morning, when he went for a morning walk. He sent me those pics via whatsapp. Enjoy..All the 5 pics here show the newly built staircase, which will connect both the PFs with the road. In Pic 5, the complete status of the...
×

SSPH/Satish Samanta P.H.


93782 views
11

Current update on the ongoing doubling work at SSPH, after the last updates /blog/post/1606708 and /blog/post/1330465 . Great news, the 2nd line has been laid fully with all required electrification work. Now it is connected from both the sides, KSBP and MSDL. The new PF has been ready (almost ~ 95%)..All the pics were taken by my father today morning, when he went for a morning walk. He sent me those pics via whatsapp. Enjoy..All the 5 pics here show the newly built staircase, which will connect both the PFs with the road. In Pic 5, the complete status of the...
×

SSPH/Satish Samanta P.H.


80256 views
1

Just for record. The former ticket counter at Satish Samanta Halt (SSPH) station, in between PKU-HLZ in SER.This counter is no more, it has been demolished because of ongoing doubling work of the existing single electrified track.Source: Pic (1) click herePic (2) click hereThe doubling work is almost finished, only a small stretch (may be 2-3 kms) near the Hijli Tidal Canal is left.Photos can be found in this blog of mine: /blog/post/1606708
×

SSPH/Satish Samanta P.H.


80256 views
1

Just for record. The former ticket counter at Satish Samanta Halt (SSPH) station, in between PKU-HLZ in SER.This counter is no more, it has been demolished because of ongoing doubling work of the existing single electrified track.Source: Pic (1) click herePic (2) click hereThe doubling work is almost finished, only a small stretch (may be 2-3 kms) near the Hijli Tidal Canal is left.Photos can be found in this blog of mine: /blog/post/1606708
×

SSPH/Satish Samanta P.H.


108169 views
4

A few snaps taken at Satish Samanta Halt (SSPH) and in between SSPH - Mahishadal (MSDL) showing the doubling work status. Only a small stretch (near the Hijli Canal bridge) of ~ 2-3 kms is left. Rest of the part has already been doubled, and in working condition.Date: Oct 3, 2015
×

SSPH/Satish Samanta P.H.


108169 views
4

A few snaps taken at Satish Samanta Halt (SSPH) and in between SSPH - Mahishadal (MSDL) showing the doubling work status. Only a small stretch (near the Hijli Canal bridge) of ~ 2-3 kms is left. Rest of the part has already been doubled, and in working condition.Date: Oct 3, 2015
×

SSPH/Satish Samanta P.H.


108169 views
4

A few snaps taken at Satish Samanta Halt (SSPH) and in between SSPH - Mahishadal (MSDL) showing the doubling work status. Only a small stretch (near the Hijli Canal bridge) of ~ 2-3 kms is left. Rest of the part has already been doubled, and in working condition.Date: Oct 3, 2015
×

SSPH/Satish Samanta P.H.


108169 views
4

A few snaps taken at Satish Samanta Halt (SSPH) and in between SSPH - Mahishadal (MSDL) showing the doubling work status. Only a small stretch (near the Hijli Canal bridge) of ~ 2-3 kms is left. Rest of the part has already been doubled, and in working condition.Date: Oct 3, 2015
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy