Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Tamil Nadu Express - எங்கள் உயிர் துடிப்பு - Vijay Baradwaj

Search Gallery
Post PNR

PLAE/Palsit (3 PFs)
पालसिट
পালসিট

Track: Triple Electric-Line

Updated: Sep 14 2020 (22:27) by JoydeepRoy
Palsit Railway Station (PLAE) is a small station located on the Howrah-Bardhaman chord line in West Bengal, India. The station has three platforms and offers basic amenities like waiting rooms and ticket counters. Visitors can explore the nearby countryside, including villages and agricultural fields, offering a glimpse into rural Indian life.

Tourism

Kalna Kali Temple: A renowned temple dedicated to Goddess Kali, known for its intricate architecture.
Tarakeswar Temple: A famous Shiva temple located in the nearby town of Tarakeswar, attracting pilgrims from far and wide.
Jaleswar Temple: A beautiful Shiva temple with a unique water tank, located in the nearby village of Jaleswar.
Katwa Mosque: A historic mosque known for its grand architecture and intricate carvings.
Bardhaman Palace: A magnificent palace built in the 18th century, showcasing the rich history and culture of the region.

Food

Shanti Dhaba: Known for its delicious vegetarian thalis and snacks.
The Veg Corner: Offers a variety of vegetarian dishes, including South Indian specialties.
Palsit Biryani House: Famous for its flavorful vegetarian biryani and curries.
Amul Parlour: A popular spot for vegetarian snacks, ice cream, and beverages.
Govinda's: A pure vegetarian restaurant serving traditional Indian dishes.
Number of Platforms: 3
Number of Halting Trains: 1
Number of Originating Trains: 0
Number of Terminating Trains: 0

Station Address

Delhi Road, Palsit, Pincode - 713151 , Dist - Purba Bardhaman
State: West Bengal
Elevation: 28 m above sea level
Type: Regular
Category: n/a
Zone: ER/Eastern
Division: Howrah
No Recent News for PLAE/Palsit
Nearby Stations in the News

0 Follows
Rating: 3.6/5 (24 votes)
cleanliness - good (3)
porters/escalators - excellent (3)
food - average (3)
transportation - good (3)
lodging - average (3)
railfanning - good (3)
sightseeing - excellent (3)
safety - average (3)

Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 1 to 5 of 9 Pic/Video Blogs  next>>

31152/Barddhaman - Sealdah Local

PLAE/Palsit


68271 views
5

Barddhaman - Sealdah Local exiting Palsit. Here Down main line/up main line is Intermediate Block (denoted by IB) i.e SM controlled starter with telephone box at the foot of signal post),while Reverse line is flag/halt type and the signal is Permissive (denoted by P) i.e without SM control & behaving as Distant signal #emuER
×

13015/Howrah - Jamalpur Kavi Guru Express

DBP/Debipur


278421 views
1

CRS Inspection of section: RSLR-PLAE (new Up Main) & SKG-PLAE ( new Dn Main) on 16.09.22
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13020/Bagh Express

MUG/Magra


346202 views
18

Pics sent by Rahul bhai .
×

13031/Howrah - Jaynagar Express

RSLR/Rasulpur


223424 views
8

Palsit & Rasulpur station Board
×

13031/Howrah - Jaynagar Express

RSLR/Rasulpur


223424 views
8

Palsit & Rasulpur station Board
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


832480 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy