Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

कोशी की जीवन रेखा — मानसी सहरसा रेलखंड - Prabhat Sharan

Search Gallery
Post PNR

COA/Kakinada Port (3 PFs)
Local Name: Cocanada
काकिनाड़ा पोर्ट
కాకినాడ పోర్ట్


Track: Double Electric-Line

Updated: Jan 26 2023 (07:01) by guest
Show ALL Trains
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 7
Number of Terminating Trains: 7
Tilak Street, Kondayya Palem, Kakinada, District - Kakinada. Pin - 533001.
State: Andhra Pradesh
Elevation: 4 m above sea level
Type: Terminus
Category: NSG-4
Zone: SCR/South Central
Division: Vijayawada
No Recent News for COA/Kakinada Port
Nearby Stations in the News

0 Follows
Rating: 3.0/5 (45 votes)
cleanliness - good (6)
porters/escalators - average (5)
food - average (5)
transportation - average (6)
lodging - average (5)
railfanning - good (6)
sightseeing - good (6)
safety - average (6)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 1 to 5 of 185 Pic/Video Blogs  next>>

IMG21096-2098089/♥♥17206 - 27206 / Kakinada port - Sainagar Shirdi SF Express♥♥

COA/Kakinada Port


1136 views
#17206 = 27206
×

IMG21096-2098089/♥♥17206 - 27206 / Kakinada port - Sainagar Shirdi SF Express♥♥

COA/Kakinada Port


1136 views
#17206 = 27206
×

17644/Circar Express

COA/Kakinada Port


13663 views
4

BZA (Vijayawada) WAP4 25037 with 17644 Kakinada Port (COA) - Chengalpattu (CGL) Circar Express
×

17644/Circar Express

COA/Kakinada Port


13663 views
4

BZA (Vijayawada) WAP4 25037 with 17644 Kakinada Port (COA) - Chengalpattu (CGL) Circar Express
×

12737/Gowthami SF Express

COA/Kakinada Port


116513 views
18

Finally Narayanadri express save.Gowtami express new RSA with Devagiri express from Ex:- COA 20-JUNE-2024, Ex:- LPI 23-JUNE-2024 and now Narayanadri express runs as Independent rake. ZRUCC sir requests 12734 Narayanadri express runs in Old timings
×

12737/Gowthami SF Express

COA/Kakinada Port


116513 views
18

Finally Narayanadri express save.Gowtami express new RSA with Devagiri express from Ex:- COA 20-JUNE-2024, Ex:- LPI 23-JUNE-2024 and now Narayanadri express runs as Independent rake. ZRUCC sir requests 12734 Narayanadri express runs in Old timings
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

COA/Kakinada Port


13474 views
6

Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot 1. Two stabling lines with electrification works are final stage. 2. Electrification works going for all pitlines Future VB Sets 3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed. 4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length 5. Automatic Coach Washing unit installation works going on at Pitline No 3
×

CHZ/Charlapalli


50420 views
4

CHZ railway terminal works reached to its final stage inspection conducted GM Arun Jain
×

CHZ/Charlapalli


50420 views
4

CHZ railway terminal works reached to its final stage inspection conducted GM Arun Jain
×

CHZ/Charlapalli


50420 views
4

CHZ railway terminal works reached to its final stage inspection conducted GM Arun Jain
×

CHZ/Charlapalli


50420 views
4

CHZ railway terminal works reached to its final stage inspection conducted GM Arun Jain
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy