Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Uttarbanga Exp: উত্তরের আত্মার আত্মীয় - Avinaba Bose

Search Gallery
Post PNR

KGH/Kotegangur (1 PFs)
कोटे गंगूर
ಕೋಟೆ ಗಂಗೂರು


Track: Single Electric-Line

Show ALL Trains
Number of Platforms: 1
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
Kotegangur
State: Karnataka
Elevation: n/a
Type: Regular
Category: n/a
Zone: SWR/South Western
Division: Mysuru (Mysore)
No Recent News for KGH/Kotegangur
Nearby Stations in the News

0 Follows
Rating: 2.7/5 (6 votes)
cleanliness - poor (1)
porters/escalators - excellent (1)
food - n/a (0)
transportation - average (1)
lodging - n/a (0)
railfanning - poor (1)
sightseeing - average (1)
safety - good (1)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 1 to 5 of 16 Pic/Video Blogs  next>>

30489 views
0

@KGH   31m late@KGH: Kotegangur &10 km/h demolishing of old line is going on.
×

36731 views
1

1 km from @KGH   26m late@KGH: Kotegangur &12 km/h new track
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

KGH/Kotegangur


58545 views
5

Construction Work on New Terminal Of Shivamogga And Coching Depot At Kotegangur Has Already Began.Must Have Been Going On For Quite Some TimeA New Track Has Been Laid on a Elevation and Been CommissionedOld Track Dismantled, Old RUB Demolished ▫️Ground Work Going on in Full Swing▫️A New RUB is Being Constructed As seen in Pic 5▫️Pic 8 Construction Works On The Other Side of the Track. all Other Pics Facing Station Side ▫️On Board 16206 MYS TLGP ICE Passing Through The New Line At Around 20Kmph▫️Satellite Terminal, Coching Depot and a Goods Terminal Going To Come up At This Location ...
×

43780 views
1

@KGH   on time@KGH: Kotegangur &88 km/h Skipping 90 Kmph Drizzling 🌧️
×

KGH/Kotegangur


73340 views
1

development of coaching depot at koteganguru in mysuru division including civil,electrical and signal & telecom works between chainage 69170 and chainage 71620 in shivamogga- talaguppa section.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy