Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Just PNR - Post PNRs, Predict PNRs, Stats, ...

22626 SBC-MAS Double Decker - எப்பவுமே டாப் டக்கர் - Vijay Baradwaj

Search News
Post PNR
Large Station Board;
Entry# 1166933-0

PDPK/Padmapukur (2 PFs)
পদ্মপুকুর     पद्मपुकुर

Track: Double Electric-Line

Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
Curry road , Shibpur , Dist - Howrah
State: West Bengal
add/change address
Elevation: 5 m above sea level
Zone: SER/South Eastern
Division: Kharagpur
No Recent News for PDPK/Padmapukur
Nearby Stations in the News

0 Follows
Rating: 2.0/5 (16 votes)
cleanliness - average (2)
porters/escalators - poor (2)
food - poor (2)
transportation - good (2)
lodging - poor (2)
railfanning - average (2)
sightseeing - average (2)
safety - poor (2)

Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Station News

Page#    Showing 1 to 1 of 1 News Items  
Jul 25 2018 (14:07) Mumbai’s Lower Parel bridge to be shut for 2 years (m.hindustantimes.com)
Major Accidents/Disruptions
WR/Western
0 Followers
42843 views

News Entry# 347536  Blog Entry# 3657723   
  Past Edits
Jul 25 2018 (14:07)
Station Tag: Currey Road/CRD added by गोंय संपर्क क्रांती~/1606548

Jul 25 2018 (14:07)
Station Tag: Padmapukur/PDPK added by गोंय संपर्क क्रांती~/1606548

Jul 25 2018 (14:07)
Station Tag: Lower Parel/PL added by गोंय संपर्क क्रांती~/1606548

Jul 25 2018 (14:07)
Station Tag: Lower Parel/PL added by गोंय संपर्क क्रांती~/1606548
Posted by: SK_DR~ 33 news posts
Western Railway and BMC fight over who will dismantle the 100-year-old RoB, rebuild it.
Commuters who get on or off at Lower Parel or Currey Road train stations are likely to face months of inconvenience now that the 100-year-old Delisle Bridge – better known as the Lower Parel rail overbridge (RoB) – has been shut down for repairs. Consultants to the Brihanmumbai Municipal Corporation (BMC) and Western Railway (WR) say the project will take up to two years to complete.
At a meeting held on Monday, consultants revealed to the BMC and WR
...
more...
that given the existing condition of the Lower Parel RoB, its reconstruction is likely to take approximately two years.
“The bridge will take quite some time for construction. During the meeting, it was evident that as the bridge is 100 years old, it requires special attention even during dismantling. The dismantling process will take nearly three months and then the reconstruction work would take one year,” said a senior WR official who did not want to be named.
The BMC and WR are also fighting over who is responsible for dismantling and reconstructing the bridge.
“We have requested the BMC to construct the bridge,” said the WR official. The railways have written to chief of BMC Ajoy Mehta, saying BMC should construct the RoB.
However, civic officials say the RoB is not BMC’s responsibility. “We do not have the expertise to construct the bridge and even if we aim to do it, we will have to go to the railways for every small permission. This is an unnecessary blame game. It is a railways bridge and should be constructed by them,” said a senior civic official.
A meeting is expected to be organised between WR and corporators to settle the issue. If no decision is reached, the railways may approach chief minister Devendra Fadnavis.
For now, those who want to enter and exit Lower Parel and Currey Road stations must use the foot overbridges (FoB), but local say that the Dadar end of the FoB also needs immediate attention. “The cement from the FoB has been falling and the structure is weak,” said Tanaji Maqdum, a resident of Lower Parel. On Tuesday, the exits out of Lower Parel and Currey Road railway stations witnessed dangerous levels of congestion. While preparations had been made to divert road traffic, there were no plans to manage the crowds of pedestrians coming out of the stations.
WR has also received requests from local politicians and commuters to open the pedestrian portion of the RoB so that it’s easier for people to go to the station. “We have received requests to start the pedestrian portion of the RoB, however, no decision has been taken yet,” said Sanjya Mishra, divisional railway manager, WR.
tags
Page#    Showing 1 to 1 of 1 News Items  

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy