Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Tamilnadu Express: தமிழுக்கு அனைத்து இடமுண்டு, அதேபோல் தமிழ்நாடு அதிவிரைவு ரெயிலிற்கு அதிக முன்னுரிமையுண்டு. அதிவிரைவு இரயில்களுக்கு எல்லாம் முன்னோடி தலைவர் - Sakthivel Srinivasan

Search Trains
Post PNR




IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)
Availability Calendar
Search MAS to TATA
PDF Download

IMG62292-1422835/♥♥CHENNAI-TATANAGAR DURONTO (BI-WEEKLY VIA VISAKHAPATNAM)♥♥

MAS/MGR Chennai Central --> TATA/Tatanagar Junction

Sep 26 (16:26)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


The Shortest Route between MAS and TATA is 90 km (5%) shorter.
Travel Time: 22h 45m     3 halts
Distance: 1677 km     Avg Speed: 74 km/hr
Max Permissible Speed: n/a
Departs @ 09:00
MGR Chennai Central/MAS 
Platform# --
Sun
 
 
Wed
 
 
 
Arrives @ 07:45 +1 night
TATA/Tatanagar Jn 
Platform# --
 
Mon
 
 
Thu
 
 
Type: Duronto
Rake Zone: SR/Southern
Practical - Can Easily be Introduced by IR
0 Follows
10
Bedroll/Linen: Don't know change
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 H1
  3
 A1
  4
 A2
  5
 A3
  6
 A4
  7
 B1
  8
 B2
  9
 B3
 18
 S3
 17
 S2
 16
 S1
 15
 B8
 14
 B7
 13
 B6
 12
 PC
 11
 B5
 10
 B4
 19
 S4
 20
 S5
 21
 S6
 22
SLR
VSKP
RSA - Rake Sharing
SINGLE DEDICATED RAKE PM@MAS OEM@TATA
Loco/Rake Reversals
VSKP/Visakhapatnam Junction


Show ALL intermediate Stations

3 halts. 287 intermediate Stations between MGR Chennai Central and Tatanagar Junction
#1
0.0 km
/==/
Zone: SR
Speed: 76
Elev: 3m

09:00
Day: 1
431.3 km
75 intermediate stations
05:40
#2
431.3 km
/==/
Zone: SCR
Speed: 74
Elev: 19m
14:40
14:45
Day: 1
349.6 km
66 intermediate stations
04:45
#3
780.8 km
/==/
Zone: ECoR
Speed: 81
Elev: 6m
19:30
19:40
Day: 1
Rake Reversal (the train reverses direction)
Loco Changed to Visakhapatnam WAP-7
Xing with 20809/Nagawali Express | Sun
444.3 km
66 intermediate stations
05:30
#4
1225.1 km
/==/
Zone: ECoR
Speed: 75
Elev: 33m
01:10
01:15
Day: 2
452.0 km
77 intermediate stations
06:30
#5
1677.1 km
%≡≡%
Zone: SER

Elev: 159m
07:45

Day: 2
Return @ 10.45 AM and arrives MAS@ 11.00 AM Next Day


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy