Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Just PNR - Post PNRs, Predict PNRs, Stats, ...

RailFanning is an art-form; RailFans are the paints - Ayush Kumar Singh

Search Trains
Post PNR
IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)
Availability Calendar
Search CSTM to RMM
PDF Download

IMG21663-315324/♥♥Mumbai CSMT-Rameshwaram Superfast via Tirupati♥♥
     

CSTM/Mumbai CSM Terminus --> RMM/Rameswaram

IMAGINARY Train.
Ankit Naphade~
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Compare with the Shortest Route between Mumbai CSM Terminus and Rameswaram.
Travel Time: 34h 0m     21 halts
Distance: 1905 km     Avg Speed: 56 km/hr
Max Permissible Speed: n/a
Departs @ 09:00
Mumbai CSM Terminus/CSTM 
Platform# --
Sun
 
 
Wed
 
 
Sat
Arrives @ 19:00 +1 night
RMM/Rameswaram 
Platform# --
Sun
Mon
 
 
Thu
 
 
Type: SuperFast
Rake Zone: CR/Central
Practical - Will be Popular for Tourism
Will be a hit train which will connect Mumbai-Pune-Solapur with Tirupati Pilgrimage, Trichy, Madurai and Rameshwaram Pilgrimage. Also can benefit a little for Chennai pax. No suck link though its needed.
0 Follows
022
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 B1
  4
 B2
  5
 B3
  6
 B4
  7
 H1
  8
 A1
  9
 A2
 18
 S7
 17
 S6
 16
 S5
 15
 S4
 14
 S3
 13
 S2
 12
 S1
 11
 PC
 10
 A3
 19
 S8
 20
 S9
 21
 GS
 22
EOG
RSA - Rake Sharing

Show ALL intermediate Stations

21 halts. 290 intermediate Stations between Mumbai CSM Terminus and Rameswaram
#1
0.0 km
/==/
Zone: CR
Speed: 42
Elev: 14m

09:00
Day: 1
9.0 km
10 intermediate stations
00:13
#2
9.0 km
/==/
Zone: CR
Speed: 63
Elev: 7m
09:13
09:15
Day: 1
24.3 km
12 intermediate stations
00:23
#3
33.3 km
/==/
Zone: CR
Speed: 49
Elev: 11m
09:38
09:40
Day: 1
Xing with 02124/Deccan Queen SF Special | Sun,Wed,Sat
Xing with 12124/Deccan Queen | Sun,Wed,Sat
18.1 km
9 intermediate stations
00:22
#4
51.5 km
/==/
Zone: CR
Speed: 75
10:02
10:05
Day: 1
46.5 km
9 intermediate stations
00:37
#5
98.0 km
/==/
Zone: CR
Speed: 39
Elev: 56m
10:42
10:45
Day: 1
Technical Halt Bankers attachment
27.8 km
5 intermediate stations
00:43
#6
125.8 km
/==/
Zone: CR
Speed: 64
Elev: 623m
11:28
11:30
Day: 1
Technical Halt Bankers detachment
Xing with 51318/Pune - Panvel Passenger | Sun,Wed,Sat
63.7 km
17 intermediate stations
01:00
#7
189.5 km
/==/
Zone: CR
Speed: 72
12:30
12:40
Day: 1
Loco change from Electric to Diesel
75.5 km
15 intermediate stations
01:03
#8
265.0 km
/==/
Zone: CR
Speed: 68
13:43
13:45
Day: 1
187.0 km
22 intermediate stations
02:45
#9
451.9 km
%==%
Zone: CR
Speed: 68
Elev: 461m
16:30
16:40
Day: 1
102.0 km
0 intermediate stations
01:30
#10
553.9 km
Zone: CR
Speed: 68
18:10
18:14
Day: 1
40.8 km
0 intermediate stations
00:36
#11
594.7 km
Zone: CR
Speed: 72
18:50
19:00
Day: 1
Loco change from Diesel to Electric
107.6 km
13 intermediate stations
01:30
#12
702.3 km
/==/
Zone: SCR
Speed: 58
Elev: 407m
20:30
20:35
Day: 1
121.8 km
15 intermediate stations
02:05
#13
824.0 km
/==/
Zone: SCR
Speed: 58
22:40
22:50
Day: 1
310.1 km
42 intermediate stations
05:20
#14
1134.1 km
/==/
Zone: SCR
Speed: 29
Elev: 115m
04:10
04:15
Day: 2
Xing with 12625/Kerala Express | Sun,Mon,Thu
9.8 km
1 intermediate stations
00:20
#15
1143.9 km
/==/
Zone: SCR
Speed: 60
Elev: 151m
04:35
04:50
Day: 2
Xing with 02625/Kerala Special | Sun,Mon,Thu
104.7 km
13 intermediate stations
01:45
#16
1248.7 km
/--/
Zone: SR
Speed: 54
Elev: 215m
06:35
06:40
Day: 2
160.7 km
22 intermediate stations
03:00
#17
1409.3 km
/--/
Zone: SR
Speed: 63
Elev: 45m
09:40
09:45
Day: 2
178.1 km
31 intermediate stations
02:50
#18
1587.4 km
/==/
Zone: SR
Speed: 79
12:35
12:45
Day: 2
94.3 km
10 intermediate stations
01:12
#19
1681.7 km
/==/
Zone: SR
Speed: 62
13:57
14:00
Day: 2
62.3 km
9 intermediate stations
01:00
#20
1744.0 km
/==/
Zone: SR
Speed: 60
15:00
15:10
Day: 2
Loco change from Electric to Diesel
47.8 km
5 intermediate stations
00:48
#21
1791.8 km
%--%
Zone: SR
Speed: 55
15:58
16:00
Day: 2
59.7 km
3 intermediate stations
01:05
#22
1851.5 km
%--%
Zone: SR
Speed: 28
Elev: 10m
17:05
17:07
Day: 2
53.6 km
6 intermediate stations
01:53
#23
1905.0 km
|--|
Zone: SR

19:00

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy