FmT LIVE - Follow my Trip with me... LIVEрдЕрдкрдиреА рд╕рдВрдкреВрд░реНрдг рдХреНрд░рд╛рдВрддрд┐, рд░рд╛рдЬрдзрд╛рдиреА рд╕реЗ рдХрдо рд╣реИ рдХреЗ ЁЯФе- Arjun Rai
Close-up; Night Pic; Side View; Small TB; 2 AC; Outside of Train; Standing at Station; Standing;
18438⇒20838/Junagarh Road - Bhubaneswar Express рмЬрнБрмирм╛рмЧрмбрм╝ рм░рнЛрмбрм╝ - рмнрнБрммрмирнЗрм╢рнНрн▒рм░ рмПрмХрнНрм╕рмкрнНрм░рнЗрм╕ рдЬреБрдирд╛рдЧрдбрд╝ рд░реЛрдб - рднреБрд╡рдиреЗрд╢реНрд╡рд░ рдПрдХреНрд╕рдкреНрд░реЗрд╕
Nov 16 2021 (16:07)
Travel Time:
11h 50m 15 halts Distance: 655 km Avg Speed: 55 km/hr Max Permissible Speed: 110 km/hr
Type: SuperFast
Rake Zone: ECoR/East Coast
Latest News (You need to double-check/verify this info yourself) ЁЯУвтЪЯ JCO 03.12.2021 cancelled in view of Cyclone JawadThu Dec 02, 2021 (10:40AM)
Rating: 3.8 /5 (23 votes)
railfanning - excellent (4)
Inaugural Run Sat Aug 11, 2012
Pantry/Catering ✕ Pantry Car
✕ On-board Catering
✓ E-Catering
ICF Rake
Rake/Coach Position RSA - Rake Sharing 2 Dedicated Rakes. PM -- BBS.
Time-Table has Changed.
Show Changes Departure Time Changed. Arrival Time Changed. Speeded up by: 2h 25m. 15 halts. 84 intermediate Stations between Junagarh Road and Bhubaneswar
23.4 km
1 intermediate stations
00:34
43.7 km
3 intermediate stations
00:52
25.4 km
1 intermediate stations
00:22
16.8 km
1 intermediate stations
00:16
37.8 km
3 intermediate stations
00:55
46.8 km
5 intermediate stations
00:39
23.9 km
2 intermediate stations
00:24
54.3 km
6 intermediate stations
00:53
Loco Reversal (rake reversal - the train reverses direction)
Loco changes from Diesel to Electric
69.5 km
8 intermediate stations
00:55
73.0 km
8 intermediate stations
01:11
49.8 km
5 intermediate stations
00:34
24.6 km
2 intermediate stations
00:27
21.4 km
2 intermediate stations
00:15
54.7 km
7 intermediate stations
00:55
71.0 km
12 intermediate stations
01:07
19.1 km
3 intermediate stations
00:21
Scroll to Top
Scroll to Bottom