Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Just PNR - Post PNRs, Predict PNRs, Stats, ...

Purvanchal Express - Poorvottar ka Sikandar

Search Trains
Post PNR
Large TB;
Entry# 1696281-0
Medium; Side View; Small TB; Sleeper; Outside of Train;
Entry# 4103821-0


Availability Calendar
Search BSP to BKN
Return# 20471
PDF Download

14710⇒20472/Puri - Bikaner SF Express
ପୁରୀ - ବିକାନେର ସୁପରଫାଷ୍ଟ ଏକ୍ସପ୍ରେସ୍     पुरी - बीकानेर सुपरफास्ट एक्सप्रेस

BSP/Bilaspur Junction --> BKN/Bikaner Junction

Updated: Nov 16 2021 (17:05) by Brandon12663^~
Nov 16 2021 (17:05)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between BSP and BKN is 2 km (0%) shorter.
Travel Time: 27h 20m     19 halts
Distance: 1498 km     Avg Speed: 55 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 17:10
Bilaspur Junction/BSP 
Platform# 2
 
 
 
Wed
 
 
 
Arrives @ 20:30 +1 night
BKN/Bikaner Jn 
Platform# 5
 
 
 
 
Thu
 
 
Type: SuperFast
Rake Zone: NWR/North Western
Latest News
(You need to double-check/verify this info yourself)
गाडी संख्या 20471/20472 बीकानेर-पुरी-बीकानेर एक्सप्रेस में बीकानेर से दिनांक 05.06.22 से एवं पुरी से दिनांक 08.06.22 से 01 थर्ड एसी श्रेणी डिब्बे की स्थाई बढ़ोतरी की गई है। 📢बीकानेर से दिनांक 05.06.22 से 26.0622 तक एवं पुरी से दिनांक 08.06.22 से 29.06.22 तक 01 द्वितीय शयनयान श्रेणी डिब्बे की अस्थाई बढोतरी...
more...
की जा रही है।
Sat May 28, 2022 (10:10PM)
News History
गाडी संख्या 20471 / 20472 बीकानेर-पुरी-बीकानेर एक्सप्रेस में बीकानेर से दिनांक 05.06.22 से एवं पूरी से दिनांक 08.06.22 से 01 थर्ड एसी श्रेणी डिब्बे की स्थाई बढ़ोतरी की गई है।
Tue May 24, 2022 (09:13PM)
📢 दिनांक 06.04.2022 से 27.04.2022 तक पुरी से 1 तृतीय वातानुकूलित और 1 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Mon Apr 04, 2022 (03:34AM)
📢 दिनांक 09.03.2022 से 30.03.2022 तक पुरी से 1 द्वितीय साधारण और 2 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Thu Mar 03, 2022 (03:39AM)
📢 Due to traffic block for NI work in connection with doubling of Kota-Bina Section of WCR, JCO 23.02.2022 will be diverted via Bina Malkhedi-Bina-Sant Hirdaram Nagar-Kota...
Mon Feb 21, 2022 (03:52AM)
📢 JCO 09.02.2022 & 16.02.2022 is being Cancelled due to Pre Non Interlocking and Non Interlocking works for commissioning of 3rd line connectivity in Bilaspur Division of SECR...
Sun Feb 06, 2022 (03:53AM)
📢 दिनांक 09.02.2022 से 02.03.2022 तक पुरी से 1 द्वितीय साधारण और 2 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Wed Feb 02, 2022 (03:49AM)
JCO 02.02.2022 & 09.02.2022 is being Cancelled due to Pre Non Interlocking and Non Interlocking works for commissioning of 3rd line connectivity in Bilaspur Division of SECR...
Mon Jan 31, 2022 (03:31AM)
🚨 बिलासपुर मण्डल के जैतहरी-छुलहा रेलखण्ड पर थर्ड लाइन जोड़ने के लिए जैतहरी स्टेशन पर 23 से 31 तक प्री नान/नान इंटरलाकिंग का कार्य किया जाना है। इस कारण गाड़ी संख्या 20472 पुरी-बीकानेर साप्ताहिक एक्सप्रेस 26 जनवरी एवं 2 फरवरी 2022 को अपने प्रारंभिक स्टेशन से निरस्त रहेगी।
Fri Jan 21, 2022
...
more...
(10:16PM)
📢 Will remain cancelled on JCO 12/01/2022 & 19/01/2022 due to non interlocking work in connection with third line on Chhulha station of Bilaspur Division...
Tue Jan 11, 2022 (03:56AM)
🚨बिलासपुर रेल मंडल अंतर्गत रुपौंद-झलवारा सेक्शन को तीसरी लाइन से जोड़ने का निर्णय लिया है। अधोसंरचना विकास से जुड़ा यह कार्य 14 से 22 दिसंबर तक होगा। इस कारण 15 और 22 दिसंबर 2021 को 20472 पुरी - बीकानेर एक्सप्रेस रद्द रहेगी।
Sat Dec 11, 2021 (11:51AM)
📢 Cancelled on 08.12.2021 due to NI works at Belpahar
Thu Dec 02, 2021 (12:22PM)
0 Follows
Rating: 4.3/5 (49 votes)
cleanliness - good (9)
punctuality - excellent (9)
food - average (5)
ticket avbl - excellent (9)
railfanning - excellent (9)
safety - good (8)
Inaugural Run
Wed Apr 24, 2013
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 D1
  3
 D2
  4
 S1
  5
 S2
  6
 S3
  7
 S4
  8
 S5
  9
 S6
 18
 A1
 17
 B5
 16
 B4
 15
 B3
 14
 B2
 13
 B1
 12
BE1
 11
SE1
 10
 S7
 19
 D3
 20
 D4
 21
EOG
 SBP
RSA - Rake Sharing
No RSA. Single Dedicated Rake. PM - Bikaner

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
Departure Time Changed. Arrival Time Changed. Speeded up by: 1h 25m.
19 halts. 179 intermediate Stations between Bilaspur Junction and Bikaner Junction
#1
-591.8 km
/==/
Zone: ECoR
PF# 3
Speed: 58
Elev: 14m

06:35
Day: 1
43.8 km
9 intermediate stations
00:45
#2
-548.0 km
/==/
Zone: ECoR
PF# 3
Speed: 46
07:20
07:25
Day: 1
Overtakes 18448/Hirakhand Express | Wed
19.1 km
3 intermediate stations
00:25
#3
-528.9 km
/==/
Zone: ECoR
PF# 2
Speed: 74
Elev: 39m
07:50
07:55
Day: 1
61.5 km
12 intermediate stations
00:50
#4
-467.4 km
/==/
Zone: ECoR
PF# 1
Speed: 67
Elev: 61m
08:45
08:47
Day: 1
48.3 km
8 intermediate stations
00:43
#5
-419.1 km
/==/
Zone: ECoR
Speed: 31
09:30
09:32
Day: 1
12.0 km
0 intermediate stations
00:23
#6
-407.1 km
/==/
Zone: ECoR
Speed: 72
09:55
09:57
Day: 1
85.7 km
7 intermediate stations
01:11
#7
-321.4 km
/==/
Zone: ECoR
Speed: 66
Elev: 141m
11:08
11:10
Day: 1
71.2 km
6 intermediate stations
01:05
#8
-250.1 km
/==/
Zone: ECoR
Speed: 51
Elev: 160m
12:15
12:35
Day: 1
Loco Reversal (rake reversal - the train reverses direction)
46.6 km
6 intermediate stations
00:55
#9
-203.6 km
/==/
Zone: ECoR
Speed: 53
Elev: 225m
13:30
13:35
Day: 1
71.2 km
9 intermediate stations
01:21
#10
-132.4 km
/==/
Zone: SECR
Speed: 68
Elev: 218m
14:56
14:58
Day: 1
132.4 km
18 intermediate stations
01:57
#11
0.0 km
/==/
Zone: SECR
PF# 2
Speed: 61
Elev: 272m
16:55
17:10
Day: 1
Remote Location Starting and Charting Station
152.2 km
18 intermediate stations
02:30
#12
152.2 km
/==/
Zone: SECR
PF# 3
Speed: 57
19:40
19:45
Day: 1
40.8 km
4 intermediate stations
00:43
#13
193.0 km
/==/
Zone: SECR
PF# 2
Speed: 44
Elev: 467m
20:28
20:30
Day: 1
126.0 km
15 intermediate stations
02:50
#14
319.0 km
/==/
Zone: WCR
PF# 3
Speed: 74
23:20
23:30
Day: 1
109.2 km
12 intermediate stations
01:28
#15
428.2 km
/==/
Zone: WCR
PF# 1
Speed: 71
00:58
01:00
Day: 2
77.1 km
7 intermediate stations
01:05
#16
505.2 km
/==/
Zone: WCR
PF# 2
Speed: 56
Elev: 519m
02:05
02:10
Day: 2
99.9 km
12 intermediate stations
01:48
#17
605.1 km
%==%
Zone: WCR
PF# 1
Speed: 57
03:58
04:00
Day: 2
45.6 km
5 intermediate stations
00:48
#18
650.7 km
/==/
Zone: WCR
PF# 1
Speed: 44
04:48
04:50
Day: 2
44.2 km
5 intermediate stations
01:00
#19
694.9 km
/==/
Zone: WCR
Speed: 59
05:50
06:00
Day: 2
118.3 km
12 intermediate stations
02:00
#20
813.2 km
%==%
Zone: WCR
PF# 2
Speed: 54
Elev: 264m
08:00
08:02
Day: 2
66.3 km
9 intermediate stations
01:13
#21
879.5 km
%==%
Zone: WCR
PF# 4
Speed: 59
09:15
09:35
Day: 2
Loco Reversal (rake reversal - the train reverses direction)
Remote Location Starting and Charting Station
107.9 km
15 intermediate stations
01:50
#22
987.4 km
/==/
Zone: WCR
PF# 1
Speed: 64
11:25
11:45
Day: 2
Loco Reversal (rake reversal - the train reverses direction)
Loco changes from electric to diesel
65.8 km
5 intermediate stations
01:02
#23
1053.2 km
/--/
Zone: NWR
PF# 1
Speed: 90
12:47
12:49
Day: 2
58.6 km
4 intermediate stations
00:39
#24
1111.8 km
/--/
Zone: NWR
PF# 1
Speed: 15
Elev: 403m
13:28
13:31
Day: 2
7.4 km
1 intermediate stations
00:29
#25
1119.2 km
/--/
Zone: NWR
PF# 4,5
Speed: 50
14:00
14:10
Day: 2
54.6 km
8 intermediate stations
01:05
#26
1173.8 km
/==/
Zone: NWR
PF# 2
Speed: 78
15:15
15:17
Day: 2
64.8 km
7 intermediate stations
00:50
#27
1238.6 km
!%%!%
Zone: NWR
PF# 1
Speed: 82
Elev: 426m
16:07
16:10
Day: 2
43.7 km
3 intermediate stations
00:32
#28
1282.3 km
%==%
Zone: NWR
Speed: 68
Elev: 340m
16:42
16:45
Day: 2
99.4 km
10 intermediate stations
01:28
#29
1381.8 km
|--|
Zone: NWR
PF# 2
Speed: 76
Elev: 296m
18:13
18:18
Day: 2
51.7 km
4 intermediate stations
00:41
#30
1433.4 km
|--|
Zone: NWR
PF# 1
Speed: 43
Elev: 322m
18:59
19:01
Day: 2
64.1 km
4 intermediate stations
01:29
#31
1497.6 km
|--|
Zone: NWR
PF# 5

Elev: 228m
20:30

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy