Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Follow my Trip (beta) Android app

Money is nothing; RailFanning is Everything

Search Trains
Post Blog
Trn Tip
Upload Trn Pic
Details Edit
EOG/SLR; Standing at Station;
Entry# 2190075-17
Details Edit
Small TB; 2 AC; Outside of Train; Standing at Station;
Entry# 4173017-3


Availability Calendar
Search NZM to MAO
Return# 22413
PDF Download

22414/Hazrat Nizamuddin - Madgaon Rajdhani Express
ਹਜ਼ਰਤ ਨਿਜ਼ਾਮੁਦੀਨ - ਮਡਗਾਂਵ ਰਾਜਧਾਨੀ ਐਕਸਪ੍ਰੈਸ / حضرت نظام الدین - مڈگاؤ راجدھانی ایکسپریس     हजरत निजामुद्दीन - मडगांव राजधानी एक्सप्रेस

NZM/Hazrat Nizamuddin --> MAO/Madgaon Junction

Updated: Jul 01 (03:24) by Keshav K rf™^~
Jul 01 (03:24)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between NZM and MAO is 13 km (1%) shorter.
Travel Time: 27h 25m     8 halts
Distance: 1909 km     Avg Speed: 70 km/hr
Max Permissible Speed: 130 km/hr between TKD/Tuglakabad and BRC/Vadodara Junction
Departs @ 10:55
Hazrat Nizamuddin/NZM 
Platform# 5
 
 
 
 
 
Fri
Sat
Arrives @ 14:20 +1 night
MAO/Madgaon Jn 
Platform# 3
Sun
 
 
 
 
 
Sat
Type: Rajdhani
Rake Zone: NR/Northern
Latest News
(You need to double-check/verify this info yourself)
Will be diverted via NZM - NDLS - RE - AWR - MTJ on 6th and 7th September 2019. Monsoon Time Table will be effective from 10th June, 2019 to 31st October, 2019. ▪️Flexi Fare System Revised;During Lean Periods Flexi Fare System Will Be Removed And During Peak Periods Flexi Fare...
more...
System Will Be Applied.
Thu Aug 22, 2019 (01:08PM)
Rating: 4.0/5 (144 votes)
cleanliness - excellent (24)
punctuality - good (24)
food - good (24)
ticket avbl - good (23)
railfanning - good (25)
safety - good (24)
Inaugural Run
Fri Nov 20, 2015
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 B1
  3
 B2
  4
 B3
  5
 B4
  6
 B5
  7
 B6
  8
 B7
  9
 B8
 18
EOG
 17
 H1
 16
 A5
 15
 A4
 14
 A3
 13
 A2
 12
 A1
 11
 PC
 10
 B9

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
Arrival Time Changed. Slowed down by: 1h 30m.
8 halts. 271 intermediate Stations between Hazrat Nizamuddin and Madgaon Junction
#1
0.0 km
/==/
Zone: NR
PF# 5
Speed: 104
Elev: 210m

10:55
Day: 1
458.2 km
66 intermediate stations
04:25
#2
458.2 km
/==/
Zone: WCR
PF# 2
Speed: 77
15:20
15:30
Day: 1
Remote Quota Starting and Charting Station
527.3 km
73 intermediate stations
06:50
#3
985.6 km
/==/
Zone: WR
PF# 3
Speed: 85
Elev: 37m
22:20
22:38
Day: 1
Loco change from electric to diesel & Remote Quota Starting and Charting Station
129.7 km
25 intermediate stations
01:32
#4
1115.3 km
/==/
Zone: WR
PF# 2
Speed: 73
Elev: 18m
00:10
00:13
Day: 2
Remote Quota Starting and Charting Station
216.1 km
37 intermediate stations
02:57
#5
1331.4 km
/==/
Zone: WR
PF# 7
Speed: 54
03:10
03:15
Day: 2
Remote Quota Starting and Charting Station
63.2 km
13 intermediate stations
01:10
#6
1394.7 km
/==/
Zone: CR
PF# 7
Speed: 62
04:25
04:30
Day: 2
Remote Quota Starting and Charting Station
278.2 km
30 intermediate stations
04:30
#7
1672.9 km
%--%
Zone: KR
PF# 1
Speed: 69
Elev: 132m
09:00
09:05
Day: 2
Remote Quota Starting and Charting Station
139.7 km
11 intermediate stations
02:01
#8
1812.6 km
%--%
Zone: KR
PF# 1
Speed: 45
Elev: 22m
11:06
11:08
Day: 2
Remote Quota Starting and Charting Station
50.2 km
4 intermediate stations
01:07
#9
1862.8 km
%--%
Zone: KR
PF# 1
Speed: 22
Elev: 23m
12:15
12:17
Day: 2
Remote Quota Starting and Charting Station
46.1 km
4 intermediate stations
02:03
#10
1909.0 km
%==%
Zone: KR
PF# 3

14:20

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy