Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

FmT LIVE - Follow my Trip with me... LIVE

जिंदगी में शादी के अलावा ट्रेन में RAC ही एक ऐसी स्थिति है,जिसमें दो अजनबी साथ निभाने को मजबूर होते है। - Junaid

Search Trains
Post PNR
Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 2383261-0
Medium; Side View; Large TB; EOG/SLR; Outside of Train; Standing;
Entry# 3727630-0


Availability Calendar
Search GKP to LTT
Return# 11079
PDF Download

11080/Gorakhpur - Mumbai LTT Express (via Barhni)
Other Names: Lokmanya Express
(گورکھپور - ممبئی لوکمانیہ تلک ٹرمنس ایکسپریس (وایا بڑھنی     गोरखपुर - मुंबई लोकमान्य तिलक टर्मिनस एक्सप्रेस (वाया बढ़नी)

GKP/Gorakhpur Junction --> LTT/Lokmanya Tilak Terminus

Updated: Feb 04 (02:29) by azharsdd786^~
Feb 04 (02:29)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between GKP and LTT is 78 km (4%) shorter.
Travel Time: 33h 40m     22 halts
Distance: 1746 km     Avg Speed: 52 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 05:30
Gorakhpur Junction/GKP 
Platform# 8
 
 
 
 
 
 
Sat
Arrives @ 15:10 +1 night
LTT/Lokmanya Tilak Trm 
Platform# 3
Sun
 
 
 
 
 
 
Type: Mail/Express
Rake Zone: CR/Central
Latest News
(You need to double-check/verify this info yourself)
► JCO 04.6.2022 is cancelled ► JCO 21.5.2022 & 28.5.2022 will be rescheduled by 2 hours from Gorakhpur ►Train no 11080 Gorakhpur-LTT Express JCO 21.5.2022, 28.5.2022 & 04.6.2022 will be diverted via Gorakhpur-Basti-Gonda and will halt at Khalilabad at 08.10 hrs and Basti at 08.37 hrs
Wed May 18, 2022
...
more...
(06:18PM)
News History
JCO 21.5.2022 & 28.5.2022 will be rescheduled by 2 hours from Gorakhpur Train no 11080 Gorakhpur-LTT Express JCO 21.5.2022, 28.5.2022 & 04.6.2022 will be diverted via Gorakhpur-Basti-Gonda and will halt at Khalilabad at 08.10 hrs and Basti at 08.37 hrs
Wed May 18, 2022 (05:51PM)
JCO 21.5.2022 & 28.5.2022 will be rescheduled by 2 hours from Gorakhpur
Wed May 18, 2022 (05:50PM)
JCO 4 June 2022 is cancelled.
Mon May 16, 2022 (12:30PM)
Revised Coach Composition W. E. F 05/02/2022 ex GKP - AC 2 Tier (2A) - 1. AC 3 Tier (3A) - 5. AC 3 Economy (3E) - 1. Sleeper (SL) - 10. General (2S) - 3. EOG -2.
Thu Oct 21, 2021 (03:08PM)
0 Follows
Rating: 4.4/5 (29 votes)
cleanliness - excellent (5)
punctuality - good (5)
food - good (4)
ticket avbl - good (5)
railfanning - excellent (5)
safety - excellent (5)
Inaugural Run
Sun Nov 22, 2015
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 D1
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 S7
 18
 B5
 17
 B4
 16
 B3
 15
 B2
 14
 B1
 13
 M1
 12
S10
 11
 S9
 10
 S8
 19
 A1
 20
 D2
 21
 D3
 22
EOG
RSA - Rake Sharing
.

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
Arrival Time Changed. Speeded up by: 50m.
22 halts. 269 intermediate Stations between Gorakhpur Junction and Lokmanya Tilak Terminus
#1
0.0 km
/--/
Zone: NER
PF# 8
Speed: 55
Elev: 84m

05:30
Day: 1
41.5 km
9 intermediate stations
00:45
#2
41.5 km
/--/
Zone: NER
PF# 1
Speed: 75
06:15
06:20
Day: 1
31.4 km
3 intermediate stations
00:25
#3
72.8 km
%--%
Zone: NER
Speed: 38
06:45
06:47
Day: 1
40.1 km
7 intermediate stations
01:03
#4
112.9 km
%--%
Zone: NER
PF# 1
Speed: 66
07:50
07:55
Day: 1
38.2 km
4 intermediate stations
00:35
#5
151.2 km
%--%
Zone: NER
PF# 1
Speed: 75
Elev: 112m
08:30
08:35
Day: 1
27.4 km
3 intermediate stations
00:22
#6
178.5 km
%--%
Zone: NER
PF#: 1
Speed: 9
Elev: 107m
08:57
08:59
Day: 1
2.8 km
0 intermediate stations
00:19
#7
181.3 km
%--%
Zone: NER
PF# 1
Speed: 44
Elev: 113m
09:18
09:20
Day: 1
40.1 km
3 intermediate stations
00:55
#8
221.4 km
/--/
Zone: NER
PF# 1
Speed: 72
10:15
10:35
Day: 1
Loco changes from diesel to electric
28.9 km
4 intermediate stations
00:24
#9
250.3 km
/==/
Zone: NER
PF# 1
Speed: 64
Elev: 108m
10:59
11:01
Day: 1
17.1 km
1 intermediate stations
00:16
#10
267.4 km
/==/
Zone: NER
PF# 1
Speed: 29
Elev: 112m
11:17
11:19
Day: 1
43.2 km
6 intermediate stations
01:29
#11
310.6 km
/==/
Zone: NR
PF# 1
Speed: 34
12:48
12:50
Day: 1
28.4 km
4 intermediate stations
00:50
#12
339.1 km
/==/
Zone: NR
PF# 4,5
Speed: 39
13:40
14:05
Day: 1
72.0 km
12 intermediate stations
01:50
#13
411.0 km
/==/
Zone: NCR
PF# 5
Speed: 71
Elev: 129m
15:55
16:00
Day: 1
106.4 km
17 intermediate stations
01:30
#14
517.4 km
/==/
Zone: NCR
PF# 1
Speed: 50
Elev: 140m
17:30
17:32
Day: 1
113.9 km
11 intermediate stations
02:18
#15
631.3 km
/==/
Zone: NCR
PF# 1,4
Speed: 63
19:50
20:00
Day: 1
298.1 km
41 intermediate stations
04:45
#16
929.4 km
/==/
Zone: WCR
PF# 4,5
Speed: 51
00:45
00:50
Day: 2
85.6 km
11 intermediate stations
01:40
#17
1015.0 km
/==/
Zone: WCR
PF# 2
Speed: 87
02:30
02:40
Day: 2
75.6 km
11 intermediate stations
00:52
#18
1090.6 km
/==/
Zone: WCR
PF# 3
Speed: 52
03:32
03:34
Day: 2
107.8 km
12 intermediate stations
02:04
#19
1198.4 km
/==/
Zone: CR
PF# 1
Speed: 71
05:38
05:40
Day: 2
123.6 km
19 intermediate stations
01:45
#20
1321.9 km
/==/
Zone: CR
PF# 4
Speed: 76
07:25
07:30
Day: 2
257.1 km
31 intermediate stations
03:22
#21
1579.1 km
/==/
Zone: CR
PF# 3
Speed: 53
Elev: 564m
10:52
10:55
Day: 2
50.6 km
6 intermediate stations
00:57
#22
1629.7 km
/==/
Zone: CR
Speed: 44
Elev: 589m
11:52
11:55
Day: 2
Technical Halt
81.5 km
14 intermediate stations
01:52
#23
1711.2 km
/==/
Zone: CR
PF# 5,6
Speed: 26
13:47
13:50
Day: 2
34.6 km
18 intermediate stations
01:20
#24
1745.8 km
/==/
Zone: CR
PF# 3

15:10

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy