Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

हम RailFan - हमेशा पंखों पे

Search Trains
Post PNR


Availability Calendar
Search PNBE to VSG
Return# 12741
PDF Download

12742/Patna - Vasco-da-Gama SF Express
पटना - वास्को-द-गामा सुपरफास्ट एक्सप्रेस

PNBE/Patna Junction --> VSG/Vasco-da-Gama

Updated: Nov 03 (02:08) by Kumaon_Tiger^~
Nov 03 (02:08)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between PNBE and VSG is 15 km (1%) shorter.
Travel Time: 38h 30m     19 halts
Distance: 2228 km     Avg Speed: 58 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 14:05
Patna Junction/PNBE 
Platform# 1
 
 
 
 
 
 
Sat
Arrives @ 04:35 +2 nights
VSG/Vasco da Gama 
Platform# 2
 
Mon
 
 
 
 
 
Type: SuperFast
Rake Zone: SWR/South Western


Latest News
(You need to double-check/verify this info yourself)
12742 (PNBE VSG) JCO 06.07.24 TO BE DIVERTED VIA JL BSR DIVA PNVL
Sun Jul 07, 2024 (11:02AM)
News History
Will run with LHB rake w.e.f. 27th January 2024.
Fri Jan 19, 2024 (07:38PM)
🔹The conversion of 12741/12742 Vasco - Patna - Vasco Express into LHB rake has been withdrawn with immediate effect, These Trains will continue to operate with the existing ICF rake.
Tue Nov 07, 2023 (12:17AM)
🔹Train No. 12742 Patna-Vasco Da Gama Weekly Express will be converted to Linke Hofmann Busch (LHB) stock from the conventional (IRS) rake with effect from 18th November 2023 from Patna Junction. 🔹The revised composition of LHB rakes will be as follows: AC First Class (1), AC Two tier (2), AC Three...
more...
tier (5), AC-Three tier Economy (4), Sleeper Class (2), General Second Class (2), Pantry Car (1), Parcel Van (1), Generator car with luggage and brake vans (2) Total: 20 Coaches.
Fri Nov 03, 2023 (11:34PM)
To run with LHB rake w.e.f. 18/11/2023
Mon Sep 18, 2023 (08:16PM)
🔹12742 (PNBE-VSG) JCO 22/07/2023 WILL BE DIVERTED VIA KTE-BINA-BPL-ET
Sun Jul 23, 2023 (06:48AM)
🔹Train No. 12742 Patna – Vasco-Da-Gama Weekly Superfast Express will be temporarily augmented with o­ne additional Sleeper class coach o­n 13.05.2023, 20.05.2023, 27.05.2023 & 03.06.2023.
Tue May 09, 2023 (02:42AM)
Train will be augmented with o­ne additional AC Two tier coach and de-augmented from o­ne general second class coach with effect from Patna from 21.01.2023.
Wed Jan 18, 2023 (01:07AM)
.
Fri Dec 23, 2022 (07:47PM)
🔹गाडी सं. 12742 पटना- वास्को एक्सप्रेस शनिवार को पटना से छूटने वाली 27.01.2014 से 12.03.2014 तक पटना के बदले दानापुर से प्रारंभ करेगी।
Fri Dec 23, 2022 (07:46PM)
.
Sun Feb 27, 2022 (07:25PM)
Running with two extra SL coaches marked as SX1 and SX2. ▪︎ ▪︎ गैर मानसून समय सारणी 06.11.2021 से लागू होगी। रोहा से वास्को डी गामा के बीच परिवर्तित समय पर चलेगी।
Wed Sep 08, 2021 (12:22AM)
1 Follows
Rating: 3.1/5 (53 votes)
cleanliness - good (9)
punctuality - average (9)
food - average (8)
ticket avbl - average (10)
u/r coach - average (7)
railfanning - good (9)
safety - good (8)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Dec 20, 2008
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
S10
  4
 S9
  5
 S8
  6
 S7
  7
 S6
  8
 S5
  9
 S4
 18
 GS
 17
 GS
 16
 A1
 15
 A2
 14
 B1
 13
 B2
 12
 S1
 11
 S2
 10
 S3
 19
 GS
 20
EOG
 21
HCP
 MAO
RSA - Rake Sharing
No RSA • 01 Rakes • PM @ VSG • SM @ Harding Park/PNBE
Loco/Rake Reversals
MAO/Madgaon Junction


Show ALL intermediate Stations

19 halts. 317 intermediate Stations between Patna Junction and Vasco-da-Gama
#1
0.0 km
/==/
Zone: ECR
PF# 1
Speed: 74
Elev: 57m

14:05
Day: 1
49.0 km
12 intermediate stations
00:40
#2
49.0 km
/==/
Zone: ECR
PF# 2
Speed: 87
Elev: 59m
14:45
14:47
Day: 1
68.5 km
18 intermediate stations
00:47
#3
117.5 km
/==/
Zone: ECR
PF# 2
Speed: 47
Elev: 68m
15:34
15:36
Day: 1
Xing with 12370/Kumbh Express | Sat
93.9 km
19 intermediate stations
01:59
#4
211.4 km
/==/
Zone: ECR
PF# 4
Speed: 64
Elev: 79m
17:35
17:45
Day: 1
Remote Location Quota Starting and Charting Station
143.4 km
19 intermediate stations
02:15
#5
354.8 km
/==/
Zone: NCR
PF# 3
Speed: 59
Elev: 95m
20:00
20:02
Day: 1
170.2 km
24 intermediate stations
02:53
#6
524.9 km
/==/
Zone: WCR
PF# 1
Speed: 79
Elev: 315m
22:55
23:00
Day: 1
Remote Location Quota Starting and Charting Station
98.4 km
10 intermediate stations
01:15
#7
623.3 km
/==/
Zone: WCR
PF# 5
Speed: 73
Elev: 381m
00:15
00:20
Day: 2
90.8 km
10 intermediate stations
01:15
#8
714.2 km
/==/
Zone: WCR
PF# 1,2
Speed: 72
Elev: 411m
01:35
01:45
Day: 2
244.4 km
25 intermediate stations
03:25
#9
958.6 km
/==/
Zone: WCR
PF# 6
Speed: 71
Elev: 329m
05:10
05:20
Day: 2
183.4 km
24 intermediate stations
02:35
#10
1142.0 km
/==/
Zone: CR
PF# 1
Speed: 63
Elev: 302m
07:55
07:57
Day: 2
123.6 km
19 intermediate stations
01:58
#11
1265.5 km
/==/
Zone: CR
PF# 5
Speed: 70
Elev: 205m
09:55
10:00
Day: 2
184.1 km
22 intermediate stations
02:37
#12
1449.7 km
/==/
Zone: CR
PF# 3
Speed: 73
Elev: 558m
12:37
12:40
Day: 2
73.0 km
8 intermediate stations
01:00
#13
1522.7 km
/==/
Zone: CR
PF# 3
Speed: 50
Elev: 551m
13:40
13:45
Day: 2
132.1 km
21 intermediate stations
02:37
#14
1654.8 km
%≡≡%
Zone: CR
PF# 6
Speed: 41
Elev: 9m
16:22
16:25
Day: 2
Remote Location Quota Starting and Charting Station
34.2 km
13 intermediate stations
00:50
#15
1689.1 km
/==/
Zone: CR
PF# 7
Speed: 53
Elev: 12m
17:15
17:20
Day: 2
202.8 km
22 intermediate stations
03:50
#16
1891.9 km
/--/
Zone: KR
PF# 1
Speed: 58
Elev: 11m
21:10
21:12
Day: 2
75.4 km
7 intermediate stations
01:18
#17
1967.3 km
/--/
Zone: KR
PF# 1
Speed: 66
Elev: 125m
22:30
22:35
Day: 2
160.6 km
14 intermediate stations
02:25
#18
2127.8 km
/--/
Zone: KR
PF# 1
Speed: 63
Elev: 40m
01:00
01:02
Day: 3
29.4 km
2 intermediate stations
00:28
#19
2157.3 km
/--/
Zone: KR
PF# 1
Speed: 31
Elev: 22m
01:30
01:32
Day: 3
46.1 km
4 intermediate stations
01:28
#20
2203.4 km
/==/
Zone: KR
PF# 3
Speed: 17
Elev: 9m
03:00
03:10
Day: 3
Rake Reversal (the train reverses direction)
Loco Change from Electric to Diesel
24.6 km
5 intermediate stations
01:25
#21
2228.0 km
%==%
Zone: SWR
PF# 2

Elev: 4m
04:35

Day: 3


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy